Skip to content
Request a callbackCallback

For employers planning an office fit-out

Why inclusive office design is essential for the London workforce

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Wide, level office corridor with glass-fronted rooms, pale carpet and a manifestation band on the glazing

The short answer

Inclusive office design means an office that people with different bodies, senses and minds can all use without asking for help. Most of it is decided at the fit-out stage, and it costs least when it is drawn in from the start.

  1. Step-free routes, clear doors and accessible WCs come first.
  2. Give people a choice of quiet, social and focused spaces.
  3. Control glare, noise and clutter: they exclude more people than steps.
  4. Make wayfinding obvious, with contrast and simple signs.

Most offices aren't designed to exclude anyone. They just do. A heavy door at the entrance, a glare-filled desk by the window, an open floor with nowhere quiet to think. Each one quietly pushes some people out of the room.

This guide explains inclusive office design from the builder's side. It covers what the law asks of you and what the guidance says about neurodiversity. It also shows which decisions are made at office fit-out stage and cost little if made early. Planning a new office or a refit? Book a site visit and we'll check your floor with you.

What inclusive office design means

Inclusive office design is an office that people with different bodies, senses and minds can use on their own terms. That includes wheelchair users and people with low vision or hearing loss. It also includes autistic people, people with ADHD, and anyone recovering from illness or getting older.

It is not a separate product or a single "accessible" corner. It is a set of decisions about routes, rooms, light, sound and signs. Most of them are fixed when the layout is drawn.

What UK law and guidance ask of an office

Inclusive design in the UK rests on three layers: the law, the Building Regulations and good-practice guidance.

The rules behind inclusive office design
LayerWhat it saysWhat it means for a fit-out
Equality Act 2010Employers must make reasonable adjustments, including to physical featuresDesign out barriers now, so fewer adjustments are needed later
Building Regulations, Approved Document MSets the access baseline for buildings other than dwellingsNew building work must meet it
HSE workplace guidanceSpace, temperature and screen work minimumsThe floor must work for the headcount you plan
PAS 6463 (BSI)Guidance on design for neurodiversityLight, sound, layout and wayfinding choices

The Equality Act sets three duties to adjust. They cover policies and practices, physical features, and auxiliary aids. A step, a narrow door or a confusing layout is a physical feature. So the fit-out is where many adjustments are won or lost.

Step-free access and circulation come first

If someone can't get in, round or out, nothing else in the design matters. Start with the route from the street to every space they'll use.

  1. The entrance, lifts and any internal level changes.
  2. Door widths, door weights and the space beside the handle.
  3. Corridor widths and turning space, kept clear of furniture and bins.
  4. Accessible WCs on the floor, not a lift ride away.
  5. Kitchens and tea points people can reach while seated.

Glass needs care too. Mark glazed walls and doors clearly, so nobody walks into them. Good contrast between floors, walls and doors helps people with low vision find their way.

Design for the senses, not only for access

Noise, glare and clutter shut more people out than steps do. That's why neuroinclusive design has grown fast. The British Standards Institution published PAS 6463 in 2022 to guide it.

High-backed upholstered booths with small tables along an office window
High-backed booths give people a quieter place to work without leaving the floor.

PAS 6463 covers lighting, acoustics, décor, flooring, layout and wayfinding. It also covers thermal comfort, odour and letting people preview a space. In a fit-out, that turns into a few practical choices:

  1. Lighting. Avoid glare and flicker, and give people some control over light at their desk.
  2. Acoustics. Absorb sound in open areas and provide rooms where people can shut a door.
  3. Décor and flooring. Calm colours, low pattern and clear contrast where it helps navigation.
  4. Layout. Predictable routes, and quiet zones away from kitchens and entrances.
  5. Wayfinding. Simple signs and landmarks, so nobody has to ask the way twice.

At Beaumont House, we kept a neutral, monochrome palette to minimise distraction. Frosted glass rooms gave people private space off the open floor.

Holistic therapy space fit-out Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

Dariia Shvyryda, Google reviewSee all reviews on Google

Give people a choice of where to work

One open floor suits some people some of the time. An inclusive office gives everyone a choice. The BCO now recommends 10 m² per person for general office space, partly to make room for that variety.

A good mix usually includes:

  • Focus rooms or booths for work that needs silence
  • Open desks for people who like the buzz
  • Meeting rooms of different sizes, with good acoustics
  • A quiet or wellbeing room, which can double as a prayer room
  • A kitchen or social space away from the focus areas

Our guide to the main types of office layout shows how these settings combine.

Space is also a legal minimum, not only a choice. HSE expects at least 11 cubic metres per person in a workroom, and usually at least 16°C. Staff who use screens daily for an hour or more need assessed workstations, breaks and eye tests on request. Height-adjustable desks and monitor arms make those assessments easier to pass.

Details that make an office easier for everyone

Small details decide whether an office feels designed for you or around you.

Office corridor with dark doors leading to a timber-framed tea point and kitchenette
A tea point off the main route keeps noise and queues out of the work areas.
  • Power and data where people sit, so cables don't cross walkways. At Beaumont House we ran data under the floor to every desk, with no trip hazards.
  • Lever handles, and light switches and sockets at reachable heights.
  • Visual as well as audible alarms, where people may not hear a sounder.
  • Lockers and storage people can reach without stretching.
  • Signs in plain words, with symbols and good contrast.

What a reception rebuild taught us about inclusion

Inclusion starts at the front door. At Portsoken House in Aldgate we rebuilt a 70 sq m office reception in 12 weeks. Every tenant and visitor walks through it first.

A new shop window at the entrance now floods the space with natural light. We rebuilt the lift surrounds facing the reception. The same light fittings run from the entrance to the offices upstairs, so the building reads as one place. We worked only at night and at weekends, so the tenants were never interrupted.

The lesson carries into any office. Get the arrival right: daylight, an obvious route to the lift and no disruption for the people already there. Then engineer the compliance underneath, so nobody notices it.

Build inclusion into the fit-out from day one

Inclusive design is cheapest at the brief and dearest after handover. So bring it into the first conversation with your designer and contractor.

We design and build offices across London through our office design service. Where the brief calls for a finer finish, our high-end interior design team takes it further. For comparing contractors, see the best commercial fit-out contractors in London.

Not sure your current office is the problem? Read is your office design holding you back. Many of the same ideas work at home, too, as our guide to an inspiring home office design shows. When you're ready, book a site visit and we'll walk the floor with you.

Inclusive office fit-out checklist

  • Walk the route from the street to every room with a wheelchair user's needs in mind
  • Mark the quiet, social and focus zones on the first layout
  • Choose lighting with glare control and local switching
  • Plan acoustic absorption for open areas and meeting rooms
  • Put accessible WCs and tea points on each floor
  • Check glazing markings, contrast and signs before finishes are ordered
  • Ask staff what gets in their way today

Frequently asked questions

What is inclusive office design?

It is designing an office so that people with different physical, sensory and neurological needs can all use it comfortably and independently. It covers access and circulation, but also light, sound, layout, wayfinding and the choice of places to work.

Is inclusive office design a legal requirement in the UK?

Parts of it are. Employers must make reasonable adjustments for disabled staff under the Equality Act 2010, including to physical features. New building work must meet the Building Regulations, where Approved Document M sets the access baseline for buildings other than dwellings.

What is neuroinclusive office design?

It is design for people who process light, sound and space differently, such as autistic people or people with ADHD. The British Standards Institution guide PAS 6463 covers lighting, acoustics, décor, flooring, layout, wayfinding, thermal comfort and odour.

Does inclusive design make an office fit-out more expensive?

It costs least when it is part of the first layout. Many choices, such as quiet rooms, glare control and clear signs, cost little if planned early. Retrofitting the same things after handover means opening finished work again.

How do I make an existing office more inclusive?

Start with an audit of routes, doors, WCs, lighting and noise. Then fix the barriers that affect most people, add a quiet room and a choice of work settings, and plan bigger changes into your next refit.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Want an office every member of your team can use?

Our design and build team checks your floor for access, light and sound on site, then prices the fit-out before you commit. Book a site visit.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us