Skip to content
Request a callbackCallback
Finished sitting room in a period house with a marble fireplace, fitted shelving either side and an oak floor

High-End Interior Design

Your home designed, priced and built by one team, and finished exactly as drawn.

Craftex

100% of projects delivered ahead
of programme and on budget

Homes we have designed and built

  • 10 weeksfrom soft strip to a finished 290 sq m penthouse at Pan Peninsula, Canary Wharf
  • 1,000+ m²of walls and ceilings finished in one Kensington penthouse, Italian Valpaint included
  • 0site visits the Kensington Olympia owner needed to make
  • 0snags or defects at the Kensington Olympia handover

Designed and built by one team

Craftex are interior designers for prime London homes who also build what they draw: one team from first sketch to last fitting. The figure fixed at detailed design is the figure you pay, because the people who drew it priced it and built it. That is high-end interior design for houses, flats and penthouses, without a builder redrawing your scheme on site.

Most London interiors are lost in the gap between a designer's drawings and a builder's site. We close it: our interior designers and our construction team work in one company.

Every layout, finish and joinery detail is costed as it is drawn, then built by the people who drew it. About 60% of the labour on our sites is our own, so the team that agrees your stone sample with you is the team that lays it. Our homes are in prime London: Kensington, Chelsea, Knightsbridge, Hampstead and the riverside towers.

High-end open-plan living room with a floor-to-ceiling bookcase, a marble coffee table and low sofas

Why does design and build matter for a high-end interior?

A hand fanning out finish swatches over a set of interior drawings on a timber desk

Because the scheme you approve is the one that gets built. When the designer and the builder are two firms, every gap in the drawings becomes a site decision, an extra cost or a dispute, and you are left to referee it. See how we work as a design and build partner for homeowners.

Read more

Interior designer, interior architect or decorator? A decorator works on surfaces: paint, paper, fabrics and furnishing. An interior designer plans how each room works, then the look: layouts, lighting, joinery, kitchens, bathrooms and finishes. An interior architect works deeper into the fabric, moving walls and rerouting services, and many London studios now use the term for that work. In practice, a high-end interior in London often needs all three, and our team covers them in one scheme.

The design stages. A project runs from the brief and a measured survey to a concept, then to detailed design, where every drawing and specification is fixed. Procurement, the build and styling follow. Where walls move or an extension is drawn, our high-end residential architects work on the same scheme.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does our interior design service include?

Six parts of one scheme, under one contract, with one team answering for every room. High-end residential interior design covers the kitchen and bathrooms too: stone, brassware and cabinetry fitted by our own trades with the services already in the right place. Specialist finishes such as Italian Valpaint are applied by decorators trained for that exact finish. For a whole-house project, see our luxury home renovation service.

Layout drawings spread on a desk with drafting pencils and a metal ruler

Concept and layouts

How you live in each room comes first: flow, storage and light drawn as options, then the look.

Stone, marble and timber samples laid out together for a finishes choice

Finishes and samples

Stone, timber, plaster and fabric chosen from real samples, never from a screen.

Dressing room we built at Kensington Olympia, lined with dark wood cabinets and lit shelves

Bespoke joinery

Wardrobes, libraries, panelling and kitchens drawn to the millimetre for the room and made under our management.

A television set flush into white marble panelling beside a blue Valpaint wall, Kensington Olympia

Lighting and AV

Layered lighting, flush screens and controls planned before the plaster goes on, so nothing is chased in later.

Lift lobby of a residential block with stone-clad walls, a timber ceiling and lift doors either side

Managing agent and licence to alter

Drawings, method statement and insurance evidence for your freeholder, and the block's rules agreed before day one.

Contemporary bedroom with a walnut-panelled bed wall, dark stone behind, a low upholstered bed and a marble side table

Build and handover

Built by our in-house trades, finished with the last pieces in place and the certificates in your file.

How does an interior design project run with us?

01

Free design consultation

We walk the rooms with you or study your plans and photos, hear the brief and give you an honest view of route and timing.

02

Concept, costed

Layouts, mood and palette drawn as options, each one priced by our construction team before you choose.

03

Detailed design

Joinery drawings, lighting plans and a finishes schedule signed off on samples. The build figure is fixed here.

04

Build and install

Our trades build it, working to your building's rules on hours, lifts and deliveries. You need not be there.

05

Styling and handover

Final fittings in place, certificates filed, then aftercare while you settle in.

The Craftex Guide to Residential Design and Build, shown as a printed booklet

The Craftex Guide to Residential Design and Build

What to settle before you appoint anyone: the brief, the budget, your building's rules, the programme, and the questions that separate a fixed figure from a hope. Free, and a ten-minute read.

Six promises, written into your contract

Not slogans: each of these is a term in the contract for your home.

  1. Designed by the people who build it

    Our designers sit beside our builders, so the scheme on paper is the one on site.

    At Kensington Olympia we ran the design and the build from conception to completion.

  2. Priced while it is drawn

    Every option carries a build cost from our own team, and the agreed figure then stands.

    Pan Peninsula finished within its allocated budget.

  3. Ready on your date

    Joinery, stone and lighting are ordered at design stage, and the programme is written into the contract.

  4. Your building, respected

    Hours, lifts, deliveries and waste agreed with the managing agent before work starts.

    After Pan Peninsula, the tower's management invited us to an invitation-only tender.

  5. Covered for your freeholder and insurer

    £10M public and employers' liability, professional indemnity on request, ISO and CHAS accreditation.

  6. Handed over complete, then aftercare

    We hand over when every room is right, with certificates filed and aftercare once you move in.

A builder's quote on a desk beside a calculator and drawings, ready to be compared

Already have a quote? Send it to us. We'll beat it.

Holding a builder's price for your interior, or a designer's scheme costed elsewhere? Send it to us. You hear from us with a better figure for the same scope and finish.

Where do high-end interior projects go wrong?

Six places a prime London interior slips, and what changes when one company draws and builds it. Almost every row starts with the same cause: design and build split between two firms who each answer for half the result. One team closes those gaps before work starts.

AreaWhere it often slipsWith Craftex
The drawingsA designer's scheme handed to a builder who redraws it on siteDrawings and site belong to one company, and nothing changes without you
The budgetDesign fees first, then a tender that lands far above the planBuild cost checked at concept and fixed at detailed design, before you commit
The blockLift bookings, complaints and a managing agent losing patienceMethod statement, insurance and working hours agreed with the block before the first delivery
The dateJoinery ordered late, so the move-in slides by a seasonLong-lead pieces ordered as soon as the design is signed off
The leaseWorks that breach the lease or leave the freeholder without paperworkConsent drawings, Building Regulations and test certificates run by us and handed to you
The finishA finish that looks nothing like the sampleFinishes approved from samples, applied by trained hands and checked as they go in

What do you receive at each stage of the design?

Every stage leaves you with something on paper or in your hand, approved by you before we move on.

StageWhat you receive
ConsultationAn honest view of what the home can become, the route and the timing
ConceptLayout options, mood and palette, each with a build cost from our team
Detailed designEvery joinery, lighting and finish drawing, each approved against a physical sample
Build figureOne fixed figure and a programme, set at detailed design
Build and installThe work itself, run to your building's rules, with progress reports
Styling and handoverThe finished rooms, final fittings in place, certificates and aftercare

Consents run alongside the detailed design: the licence to alter from your freeholder and, where walls or services change, Building Regulations. That keeps them off the critical path. For what drives the total, read how much luxury home design costs.

Free cost calculator

What will your refurbishment cost?

Enter the floor area and choose a level of finish. You see an indicative build range at once, at our 2026 London rates, ex VAT.

Your estimateEnter your spaceex VAT and fees Get a fixed figure

The figure covers construction only: furniture, art and design sit outside it. Your fixed figure follows the consultation and the detailed drawings, from the team that will build it.

Interior designers across prime London

Kensington terrace of brick and white stucco houses with columned porches and iron balconies

Chelsea, Kensington, Knightsbridge and Belgravia. Stucco houses and mansion flats where every finish is noticed. On Herbert Crescent in Knightsbridge we refurbished a 450 m² home around bespoke joinery, with neighbours on every side.

Pan Peninsula penthouse bathroom with a dark stone vanity, a freestanding bath and a full-height window

Hampstead, St John's Wood and the Canary Wharf towers. Family houses and penthouses in managed blocks. At Pan Peninsula we rebuilt a penthouse in a tower full of residents, with the building's management kept on side.

Read more

We take on homes across London, including Chelsea, Kensington, South Kensington, Knightsbridge, Belgravia, Mayfair, Marylebone, Notting Hill, Holland Park, Hampstead, Highgate, Primrose Hill, St John's Wood, Maida Vale, Regent's Park, Fulham, Chiswick, Richmond, Wimbledon and Canary Wharf. If you are comparing interior design firms in London, or interior design companies that also build, the team is the same wherever your home is.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Interior designer in London: your questions

How much does an interior designer cost in London?

London designers charge in different ways: a percentage of the spend, a fee per room, by the hour, or a fixed fee, often with a mark-up on furniture. With us the build is priced by our own construction team, so there is no second fee stack. Get in touch and we will discuss your project. Our guide to luxury home design costs in the UK sets out how the totals add up.

What does an interior designer do?

Everything between the brief and the last cushion: layouts, lighting, joinery drawings, kitchens and bathrooms, finishes, furniture and art, then supervision while it is built. In our case the builders are colleagues, which makes supervision simpler. Read how to choose a high-end interior design and build firm before you appoint anyone.

Interior designer or interior architect: which do I need?

If walls move, services are rerouted or joinery is built into the structure, you need interior architecture as well as design. If the layout stays, an interior designer is enough. Our team does both, and our architects join when planning or structure is involved.

Can you design and build under one contract?

Yes. Our construction team is an in-house department, so nobody waits for another firm's drawings. That is why the drawings and the price never drift apart.

How long does a high-end interior take?

Design time is set by how quickly decisions are made and samples approved. Our Kensington Olympia penthouse took 12 weeks to build and a 450 m² Knightsbridge house took 32. Your dates are written into the contract.

Can you work in a flat in a managed block?

Yes, and both of our penthouse projects were in occupied blocks. Working hours, lift bookings, deliveries, protection of common parts and waste are agreed with the managing agent first. Many London leases also need a licence to alter for structural or services work; we prepare what the freeholder asks for. See licence for alterations explained.

What happens at the free design consultation?

A designer looks at the property, or at your drawings if you are not yet in, and hears what you want the home to become. You get an honest view of the route, the timing and whether the building or lease will limit the scheme. There is no obligation.

Can you take on another designer's scheme?

Yes. We price other practices' schemes line by line and raise any gaps in the drawings before site, not during. Medusa in Knightsbridge, a four-floor spa, reached us as a concept; we completed the design and built it. Our guide to choosing premium materials for a luxury home covers the questions we ask of any scheme.

Do you source furniture and art?

We specify and procure the fittings with the scheme: lighting, mirrors, tiles and joinery, each agreed with you before it is ordered. On the Medusa project our team procured everything from the chandeliers to the fish-scale tiles. Loose furniture and art are agreed at the consultation.

Which areas of London do you cover?

All of London, from our office in Victoria, with most of our residential work in the prime central and north-west boroughs and in Docklands towers. Larger homes elsewhere in the UK by arrangement.

How fast do you reply?

We reply within one hour, Monday to Saturday, 8am to 6pm. Tell us the address and what you want to change, add a floor plan or photos if you have them, and one of our directors calls you back.

What our clients say

See all reviews on Google
  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

Your details are used only to answer your enquiry (privacy).

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us