Commercial Fit Out and Refurbishment
Offices, venues, hotels and flagship stores, designed and built by one team.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 1,550 sq mof premium offices at Portsoken House, Aldgate, delivered in seven months with the rest of the building at work
- 3 weeksto refurbish 750 sq m at Beaumont House against a lease deadline, where others quoted 12
- 0days Drake's Savile Row flagship closed during its 8 weeks on site
- £10Minsurance cover, ISO and CHAS, what your landlord and insurer ask for
One fit out company for every kind of commercial space
Craftex is a commercial fit out company in London for owners and occupiers who need a space finished on a fixed date: offices, hotels, restaurants, flagship stores, clinics and gyms. One team designs, prices and builds it, so the figure and the opening date agreed before work starts are the ones you get.
Owners compare a commercial fit out company on the tender figure. They come back to us for what follows: one director from the first site walk to the keys, our own joiners and fitters on site, and every certificate your landlord and insurer ask for in one file. Our fit-outs run from £100,000 to £10M and above, from whole office floors in the City to a flagship on Savile Row.
Fit out or refurbishment: which does your building need?
A fit out turns an empty shell or a Cat A floor into a space a new occupier can use: layout, services, finishes and joinery. A refurbishment renews a space you already own or occupy, often while it stays open. We price and build both, and at the first visit we tell you which one your building needs, and what it will take to open on your date. See how we work as a fit-out and construction partner for businesses.
Read more
Shell and core, Cat A and Cat B. Shell and core is the landlord's base build: frame, roof, lifts, risers and capped services, with no finishes. Cat A adds raised floors, suspended ceilings, lighting, basic air conditioning and toilets, so a floor can be let. Cat B is the occupier's own fit out on top: partitions, meeting rooms, kitchens, reception, joinery, AV and the brand. On a shop, restaurant or clinic the same idea applies: the landlord hands over a shell, and the fit out makes it trade. More in Cat A, Cat A+ and Cat B fit out.
Interior fit out, commercial interiors or fitout? Whatever the term on your brief, the questions are the same: what the building has today, what the business needs on opening day, and who carries the risk in between. Our guide to how a commercial refurbishment works walks through the stages.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Commercial fit out services by sector
Eight sectors, one team, the same directors. Each sector has its own page with its projects, its questions and what drives its budget. Specialist pages too: laboratory fit out and data centre fit-out.
Office fit out and refurbishment
Whole floors and headquarters, Cat A and Cat B, delivered with the building in use.
Restaurant, bar and pub fit out
Kitchens, bars and dining rooms built to open on a booked date.
Hotel refurbishment
Guest rooms, lobbies and public areas renewed floor by floor while the hotel trades.
Shopfitting and retail fit out
Flagship stores with shopfronts and joinery made by our own team.
Clinic fit out
Private clinics and treatment rooms with the ventilation, finishes and records inspectors expect.
Gym and wellness fit out
Members' clubs and studios with acoustic floors, changing rooms and plant.
Warehouse fit out
Clear-span sheds with mezzanines, offices, welfare and services, ready to operate.
Salon and spa fit out
Salons, spas and treatment suites with water, ventilation and lighting done right.
How it works
How does a commercial fit out run with us?
01
Site visit and brief
Your opening date, hours and budget first, then a survey of power, ventilation, drainage and the fire alarm.
02
Design and fixed figure
Layout, finishes and joinery drawn by our in-house team and costed by the people who will build it.
03
Licence, planning, Building Regulations
The landlord's licence pack, any planning or listed consent, and building control, run by us.
04
Build around your business
Zones, out-of-hours shifts and protected routes, so the building or the shop keeps working.
05
Handover with every certificate
Fire alarm, emergency lighting and electrics tested, O&M file handed over, zero snags.
The Craftex Guide to Commercial Fit Out
Every stage of a commercial fit out in one guide: the terms you will hear, what drives the cost and the programme, and the checklist that keeps your opening date safe.
Our promises
Six promises, written into your contract
Not marketing lines. These are the terms we build to on every office, venue, store and clinic.
-
One team, design to opening day
One contract and one point of contact, the same directors from the first site walk to the keys.
-
The agreed price stands
A fixed figure for a written scope and a programme written into the contract. Changes only in writing, priced before work starts.
-
Your doors stay open
Zones, out-of-hours work and a clean handback each morning, so customers and staff keep coming in.
Drake's Savile Row: open every day of its 8 weeks on site
-
Open on your date
Around 60% of the labour on site is our own, so no week is lost waiting for trades.
Medusa, Knightsbridge: four floors designed and built in 17 weeks
-
£10M cover on every job
Public and employers' liability, professional cover on request. ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Zero snags, every certificate
We leave when it is right. Test certificates and the health and safety file in your hands on opening day.
Already have a quote? Send it to us. We'll beat it.
Send us the fit out quote you have been given. A director reads it line by line and comes back to you the same working day with a better figure for the same scope and a programme that holds your opening date.
Compare your quotes
Fit out contractors compared: where the risk sits
Hold any fit out proposal against these six rows. The risks are the same on every commercial space; what differs is who carries them once the contract is signed. On a fit out, most of that risk hides in the gaps between designer, shopfitter and builder.
| Area | The usual risk | With Craftex |
|---|---|---|
| Design and build split | A designer, a shopfitter and a builder, each blaming the others when the joinery does not fit | One team answers for the drawings and the build, so a clash is ours to fix |
| Provisional sums | A low tender full of provisional sums that turn into extras once you are committed | A fixed figure for a written scope; anything you change is priced in writing first |
| Who is on site | Every trade subcontracted, so the programme hangs on other firms' diaries | Around 60% of the labour is our own: joiners, drylining, carpentry and finishes |
| Landlord's licence | The licence for alterations left to the occupier, and the start date slips while it is chased | We prepare the drawings, method statements and insurance details the landlord asks for |
| Trading and occupiers | Works that close the shop or empty the floor for weeks | Zones, night shifts and a clean handback, so the business keeps earning |
| Handover | Opening day with snag tape on the walls and certificates still to follow | Zero snags; test certificates, manuals and the O&M file in your hands before you open |
What sets the budget of a commercial fit out?
Six things decide the figure on any commercial fit out. None of them is a rate per square metre: we read them on your floor at the free site visit, and the fixed figure follows from them.
| Driver | What moves the budget | What we fix before you sign |
|---|---|---|
| Sector and use class | Kitchens, treatment rooms and gym floors carry far more services than an office or a shop | The use class, the consents it needs and the plant it calls for |
| Condition of the shell | A bare shell, a Cat A floor or a tired unit to strip out all start from different places | A survey of what stays, what goes and what the landlord still owes |
| M&E and ventilation | New air conditioning, extract, power and fire alarm are the largest packages on most jobs | A services design priced by the engineers who will install it |
| Joinery and finishes | Bespoke counters, display walls, stone and metalwork take the most making time | Drawings, samples and lead times agreed before the programme is set |
| Consents | Licence for alterations, planning, advertisement or listed building consent | Who applies, when, and what happens to the date if a consent is late |
| Neighbours and access | Trading neighbours, residents above, loading bays and working hours | A logistics plan with the hours, routes and phases written down |
Free cost calculator
What will your commercial fit out cost?
Enter your floor area and pick a specification. You get an indicative range straight away; your own fixed figure follows the free site visit and a survey of the space.
Fit out contractors in London, from the City to Mayfair
The City, Aldgate and King's Cross. Offices and headquarters in occupied buildings, where the lifts, the loading bay and the neighbours are shared. At Portsoken House in Aldgate we delivered 1,550 sq m of offices over two floors while every other floor stayed leased and at work.
Mayfair, Knightsbridge, Chelsea and Savile Row. Flagship stores, salons, spas and restaurants on streets where the shopfront, the joinery and the hours are all controlled. Drake's on Savile Row traded every day of its refit; Medusa on Beauchamp Place opened over four floors in 17 weeks.
Read more
Clients searching for fit out companies in London, fit out contractors in London or fit out London teams usually need three things on one contract: design, the landlord's licence and the build. We work across Mayfair, Knightsbridge, Chelsea, Marylebone, Westminster, Kensington, Notting Hill, Islington, Hammersmith, Battersea and Canary Wharf, and beyond into Surrey and Oxford.
We also take on commercial fit outs across the UK, with local pages for commercial fit-out in Edinburgh and office fit-out in Surrey. See all locations.
Commercial refurbishment for buildings that stay in use
Floors and receptions that let
For a landlord, a refurbishment is how a floor lets faster: a renewed Cat A floor, a reception that matches the rent, and washrooms and showers people want to use. At Portsoken House in Aldgate we rebuilt the 70 sq m reception over 12 weeks of nights and weekends, with every tenant at work.
Surveyed before the price is fixed
Used buildings hide things. Before we price, we look above the ceilings and into the risers, test the fire alarm and emergency lighting, and read the asbestos survey. Surprises are found on paper, not in week three on site.
Strip-out to sign-off on one contract
Strip-out, mechanical and electrical upgrades, new finishes, the landlord's licence and building control sign-off sit with one team. Comparing commercial refurbishment companies? Ask who signs off the fire alarm and who hands over the certificates. With us, both sit in the same contract as the build.
Commercial projects we have delivered
Three sectors, one team, every one handed over with zero snags: premium offices delivered around a working building in Aldgate, a Savile Row flagship refitted while it traded, and a four-floor spa and salon in Knightsbridge.
-
Portsoken House, Aldgate A full office fit-out of two floors in seven months, the rest of the building at work. View case study
-
Drake's, Savile Row A 120 sq m menswear flagship refitted in 8 weeks on site: new shopfront, bespoke joinery, open throughout. View case study
-
Medusa, Knightsbridge A spa and beauty salon over four floors on Beauchamp Place, designed and built in 17 weeks. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Commercial fit out: your questions
What is a commercial fit out?
Turning empty or worn-out premises into a working office, hotel, restaurant, store, clinic or gym: layout, services, finishes and joinery, handed over ready to use.
Which sectors do you fit out?
Offices, restaurants and bars, hotels, flagship stores, private clinics, salons and spas, warehouses and laboratories, plus data centres, gyms and members' clubs.
Can our business keep trading during the works?
Yes. We split the space into zones, do the noisy work before and after hours and hand it back clean each morning. The Drake's flagship never closed during its works, and Portsoken House stayed let around our floors.
What drives the cost of a commercial fit out?
The sector, the condition of the shell, the services, the joinery and finishes, the consents and access. Try the calculator above for an indicative range; a fixed figure follows the free site visit.
Do you take on fit outs outside London?
Yes, for the right project. London is our focus and most of our work; we also fit out across the UK, with case studies in Oxfordshire and local pages for Edinburgh and Surrey.
Does a refurbishment have to improve the building's EPC?
Not on its own. But a landlord letting commercial space in England and Wales needs an EPC rating of at least E under the minimum energy efficiency standard, unless an exemption is registered. New lighting, heating and cooling during a refurbishment are often the cheapest moment to lift the rating.
Is a fit out the same thing as a refurbishment?
Not quite. Fit out is the word for preparing premises for the business moving in; refurbishment is the word for renewing premises already in use. Many of our jobs mix the two, and one contract covers both.
Do you design as well as build?
Yes, one team under one contract. Medusa's concept was already drawn when we were appointed; our designers re-worked it to fit the budget, and the client visited site once during the build.
Do you handle the landlord's licence, planning and Building Regulations?
Yes. We prepare the licence for alterations pack, any planning, advertisement or listed building consent, and the building control submission. See licence for alterations explained and the client duties in CDM 2015 for fit-out clients.
How do we compare fit out companies?
Check who employs the people on site, who carries the design, how provisional sums are priced, the insurance in force and references from clients with projects your size. Our guide to choosing a commercial fit out contractor in London lists the questions to ask.
Do we need an asbestos survey before a refurbishment?
In most buildings put up before 2000, yes. The Control of Asbestos Regulations 2012 require a refurbishment and demolition survey of the areas to be worked on before the work starts. We ask for it at the first visit, because what it finds can change the programme.
How fast do you reply?
We come back to every enquiry the same working day. Send your floor plan, the address and the date you need to open, and a director reads them before calling you, so the first call is already about your space.
Read before you choose a fit out company
Written from our own fit-outs: what a fit-out company does, how refurbishment works, how to compare contractors.
-
Guide Best Commercial Fit-Out Contractors London: How to Choose Read the guide
-
Guide How Commercial Refurbishment Works? Read the guide
-
Guide Building Fit-Out Contractor vs. General Contractor: Key Differences Read the guide
- More guides
- What fit-out companies do
- Retail fit-out in London
- Commercial refurbishment and change of use
- The value-add commercial refurbishment strategy
- Lessons from bold commercial redevelopment
- What to do with an empty office building
- Designing a commercial space in London
- CDM 2015 client duties on a fit-out
- Licence for alterations explained
- Landlord fit-out contributions
- Class E explained
- EPC rules for commercial landlords
What our clients say
See all reviews on Google-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Planning a commercial fit out?
Send us the address, the floor plan and your opening date. We will come back to you the same working day.