Skip to content
Request a callbackCallback
Aerial view of a large new logistics hub with loading docks, offices at the corner and an HGV yard

Warehouse Construction

New warehouses and distribution centres, from bare site to racked, certified shell.

Our track record

100% of projects delivered ahead
of programme and on budget

What our clients get

  • 60%of the labour on site is our own, so the frame never waits for a trade
  • 4 weeksto redesign and connect a warehouse's complete engineering systems, high-voltage panel included
  • 0snags at handover
  • £10Minsurance cover, ISO and CHAS, every accreditation the work needs

Warehouses built around how your stock moves

Craftex delivers warehouse construction across the UK and London: steel-frame shells, floor slabs, yards, loading docks and the fit-out inside, under one design and build contract. One team designs, prices and builds it, so the date agreed before you sign is the date your operation moves in.

Developers, landlords and operators bring us a site and a go-live date. We plan the building from the flow of goods inward: docks, yard, racking and offices first, then the frame that wraps them.

Long silver-clad facade of a new distribution centre with horizontal glazing

What should a warehouse brief settle before design?

Steel portal frame of a new warehouse being erected with a mobile crane, before the cladding goes on

Five numbers decide most of the cost and the date: clear eaves height, floor flatness, dock count, yard depth and incoming power. Settle them in one written brief and you get one price for one building, not a stack of provisional sums. See how we work as a construction partner for developers and investors.

Read more

Every month a warehouse is late is a month of rent, rates and lost capacity, so we fix the brief before anyone draws. The height to the underside of the haunch sets how many pallet levels you can rack. The floor flatness class, set out in the Concrete Society's TR34, decides whether very narrow aisle trucks can run at full height. Dock levellers and level-access doors fix how many trailers you can turn round in a shift.

Most new steel frame warehouse buildings use a portal frame: steel columns and rafters with rigid knees, clad in insulated panels. A single clear span gives an open floor with no columns in the racking. On very wide buildings a multi-span frame with a line of internal columns can cost less, provided the racking layout works around the column grid. We test both against your layout before the frame is ordered.

Steel frame buildings for storage also need fire separation for offices and plant, rooflights set against glare on the racking, and a cladding system that meets Part L. Funders and tenants often ask for a BREEAM rating, and every new building needs an EPC at completion, so we plan both into the design rather than adding them at the end.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does our warehouse construction service cover?

Shell, services and fit-out in a single contract: the building is ready to trade the day you take the keys. Distribution centre construction is the same build at a larger scale: fulfilment centres and bulk storage need more dock doors, a heavier slab, more incoming power and a bigger yard. Under the same contract we also handle the site appraisal, planning, Building Regulations, the fire strategy and mechanical and electrical design for the whole building.

Steel portal frame of a new factory unit with its roof sheeting on, on an open site under a blue sky

Steel-frame shell and cladding

Portal frame, roof and wall cladding, rooflights and doors, with the eaves set by your racking.

Power-floated floor slab of a new warehouse being inspected by three workers

Floor slab, yard and drainage

Groundworks, a slab designed for rack and truck loads, HGV yard, parking and surface water.

Row of loading dock doors with dock shelters and bollards on a large warehouse building

Loading docks and doors

Dock levellers, shelters, level-access doors and the apron in front of them.

New warehouse shell with red sprinkler pipework and lighting on the underside of the roof

Sprinklers, fire and M&E

Incoming supply, lighting, heating, ventilation, fire alarm and sprinklers where the insurer asks.

Open-plan office inside an industrial building, with a glazed upper-level office at the far end

Offices, welfare and mezzanines

Two-storey office blocks, staff welfare and mezzanine decks built inside the shell.

New pallet racking installed in an empty warehouse before stock arrives

Distribution centres and logistics hubs

Larger sites with more docks, heavier floors and more power for sortation.

How it works

How does a warehouse build run, site to keys?

01

Site review

We walk the site with you: access, ground, services, planning context and what the plot can take.

02

Design and agreed price

Layout, yard and frame drawn around the flow of goods, a cost plan, then one lump sum and a programme.

03

Planning and approvals

Pre-application advice, the planning application, Building Regulations and the fire strategy, run by our team.

04

Build

Groundworks, slab, frame, envelope, services and the inside, with a weekly report to you.

05

Testing and handover

Every system commissioned and tested, certificates and manuals handed over, ready for racking.

Cover of the free Craftex Guide to Warehouse Construction

The Craftex Guide to Warehouse Construction

Layout, budget, compliance and the essentials of building and fitting out a warehouse, with the checklist that keeps a scheme on track from site to handover. Free, and a ten-minute read.

Our promises

Six promises, written into your contract

Not marketing lines: these terms go into the contract for every warehouse and logistics scheme we build.

  1. One team, site to keys

    Appraisal, planning, design and build under one contract, with one director accountable from the first site visit to the keys.

  2. The agreed price stands

    A fixed lump sum for a written scope, abnormals surveyed before we price. Any change is costed and agreed in writing first.

  3. Approvals run by us

    Planning, Building Regulations, the fire strategy and every statutory sign-off are prepared, submitted and chased by our team.

  4. Built faster

    Our own crews run groundworks, frame and services back to back, so no week is lost waiting for the next trade.

    Drake's arch: handed over early

  5. Insured and accredited

    Every job carries public and employers' liability cover. CHAS and SafeContractor accredited, ISO 9001, 14001 and 45001 certified.

  6. Handed over complete

    We stay until it is right. Test certificates, commissioning records and the health and safety file arrive with the keys.

Example new-build warehouse quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a price for your warehouse or distribution centre from another contractor? Send it to us. You hear back the same working day: where we would beat it on the same scope, and a programme that meets your go-live date.

Compare your quotes

Where do warehouse builds overrun?

Compare any quote with this list: every scheme carries these risks, and the only question is who holds them. Nearly every overrun on a warehouse starts at a hand-off: ground to frame, frame to envelope, envelope to services. With a single contractor holding the whole programme, those hand-offs happen inside one team and one weekly plan.

AreaThe usual riskWith Craftex
Who is responsibleArchitect, engineer, groundworker, steel erector and M&E firm on separate contracts, each pointing at the nextOne design and build contract answers for the whole building
The final billProvisional sums for ground and services, then extras once the site is opened upGround and abnormals surveyed first, then a lump sum; every change signed off before it starts
Planning conditionsA consent with conditions nobody owns, discharged late while the frame waitsEvery condition tracked by the team that will build it
The go-live dateThe frame waits for the groundworker, the services wait for the frameOne programme, our own crews on site in sequence
Sign-off and insuranceCompletion certificates left for you to chase after the operator moves inBuilding control, fire, electrical, sprinkler and drainage sign-offs collected before handover
The first day of tradingOpen snags as the first pallets arriveA finished building with its manuals and records on the day you take the keys

What fixes the price of a warehouse build?

Seven decisions move a warehouse budget more than anything else. We settle each one in writing before you sign, so the price in the contract is what you pay.

DecisionWhat moves the priceWhat we fix before you sign
Frame and spanClear span or multi-span, bay spacing, crane railsFrame type and column grid tested against your racking plan
Eaves heightTaller steel, more cladding, more sprinkler capacityThe height your racking and trucks need, no more
Floor slabRack and truck loads, flatness class, jointsSlab design, flatness class and load figures in the contract
Docks and doorsNumber of docks, levellers, shelters, level-access doorsA dock schedule matched to your trailer movements
Fire and sprinklersCompartments, sprinkler system, water storageThe fire strategy agreed with building control and your insurer
Power and servicesIncoming supply, high-voltage connection, lighting, heatingThe supply your operation needs, applied for early
Yard and external worksYard depth, levels, drainage, parking, fencingA site layout with the yard, levels and drainage drawn

Abnormal ground, land, planning fees, Section 106 and CIL, racking and automation are priced per project once the site is surveyed. We usually advise a contingency of 5–10%, depending on complexity. How the layout drives the figure: warehouse layout design and planning.

Free cost calculator

What will your warehouse cost to build?

Enter the floor area and choose a specification for an instant range at our 2026 rates.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT, fees and land, for a level site with services at the boundary. Excludes abnormal ground, Section 106 and CIL, racking and automation. Your fixed figure comes after a site review.

Warehouse builders for UK and London sites

Long white logistics unit with a row of loading doors and an empty car park in front

London and the M25. We build and fit out warehouses from Park Royal in the west to the Thames Gateway in the east, including Canary Wharf and Greenwich. Our London warehouse work includes a services overhaul in Hackney and a railway-arch warehouse in Bethnal Green.

Ground floor slab being poured over reinforcement inside a piled excavation, crew in orange

Across the UK. Many logistics sites sit outside London, and the same directors run the job wherever the site is. Our Banbury warehouse in Oxfordshire was built inside a working site, and we have local pages for Basingstoke, Glasgow and Edinburgh.

Read more

Looking for warehouse construction companies or warehouse contractors for a site outside the capital? We also work in Bristol, Leeds, Manchester, Birmingham, Cambridge, Oxford, Reading and Surrey. Industrial construction for light industrial units, trade counters and production space follows the same route as a warehouse: one brief, one price and one team on site.

Industrial warehouse construction, extensions and turnkey builds

New self-contained block with extraction ductwork on the resin floor of the Banbury warehouse, with the working floor around it

Industrial units built around the process

Workshops and light-industrial units need more than storage space: three-phase power to the machines, extraction, heavier point loads on the floor and wider doors. We plan those with the frame, so the building suits the process as well as the pallets. In a 120 m² Hackney unit our team designed and installed every engineering system in four weeks.

Warehouse extensions on a working site

A new bay has to join the old one without stopping it. We tie the new frame to the existing building, match the eaves and the cladding, and fence the works off from the trucks and the pickers. We work inside live warehouses the same way: at Banbury, the site kept running while our team fitted out welfare rooms, storage and racking inside it.

New distribution warehouse with numbered dock doors under a steel canopy, bollards and a clean concrete yard

Turnkey: from bare site to a working building

A turnkey warehouse puts design, approvals, frame, slab, docks, sprinklers and racking under one contract, with one date. Our warehouse design services cover the layout, the planning drawings and the structure, and the handover pack includes the fire strategy, the EPC and the certificates your insurer and funder ask for.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Warehouse construction: your questions

Do you build new warehouses or only fit them out?

Both. We build new warehouses from a bare site, with the frame, slab, yard and services, and we fit out existing units. Projects run from £100,000 to £10M+ in construction value. For an existing building, see warehouse fit-out and refurbishment.

Do you build distribution centres and logistics hubs?

Yes. Fulfilment, distribution and bulk storage buildings, and logistics hubs built to suit a named operator, with the layout, docks and power drawn around how that operator works.

How long does a warehouse take to build?

It depends on the size, the ground and the planning route, so the date goes into the contract once the site and the brief are known. We then plan backwards from your go-live date.

Who handles planning, Building Regulations and the sprinkler design?

We do. We prepare the pre-app and the application, discharge the conditions, and run Building Regulations and the fire strategy. Sprinklers are designed where the insurer or the fire strategy calls for them.

What drives the cost of a warehouse?

Mainly the frame and span, the eaves height, the slab, the docks, fire protection and the power supply. Our warehouse cost calculator gives a first range; a fixed figure follows the site review.

How fast do you reply?

The same working day. Share the site address, the floor area and the date the building must be working, and a director comes back to you.

Can you take on the whole warehouse as design and build?

Yes. Warehouse design and build means one contract for the drawings, the approvals and the construction. You agree one price with one party, and that party answers for the result.

Steel portal frame or multi-span: which do you use?

It depends on the width of the building and the racking plan. A clear span keeps the floor free of columns; a multi-span frame can be cheaper on a very wide footprint. Both are checked against your racking plan before any steel is ordered.

Do you work outside London?

Yes. London is our base and we build across the South East and the UK, with the same directors running the job wherever the site is.

Can you build offices and a mezzanine inside the shell?

Yes: offices, welfare, mezzanines and racking zones, planned with the layout from day one. The rules for decks are in warehouse mezzanine floor regulations.

Do we need planning permission to extend a warehouse?

Sometimes not. Permitted development under Part 7, Class H lets an industrial or warehouse building grow within limits on floor area, height and distance from the boundary, but not in some protected areas. Larger extensions need an application, so we check the limits against your site first.

What our clients say

See all reviews on Google
  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning a warehouse or logistics hub?

Send us the site, the floor area and the date it must be working. We will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us