Warehouse Fit Out and Refurbishment
Mezzanines, offices, power and floors, built while the warehouse keeps running.
Our track record
100% of projects delivered aheadof programme and on budget
Warehouses we have fitted out
- 148 sq mof new rooms built in 8 weeks inside the 2,500 sq m Banbury warehouse, working throughout
- 500 sq mrailway arch in Bethnal Green fitted out for Drake's in 8 weeks on site
- 4 weeksto redesign and test every engineering system in a Hackney warehouse unit
- £10Minsurance cover, ISO and CHAS, every accreditation the work needs
One contractor for the shed, the offices and the yard
Craftex delivers warehouse fit out and warehouse refurbishment across the UK and London: mezzanine floors, offices and welfare, power, lighting, heating and floors under one contract. We phase the work around your pick and dispatch, so the warehouse keeps running while it is rebuilt. Occupiers and landlords who need warehouse refurbishment contractors get one design-and-build team, from survey to certificates.
We take on whole units and large distribution sheds for logistics operators, manufacturers, premium brands and landlords. Design, structure, mechanical and electrical work and the finishes answer to one director, and our own trades carry out around 60% of the work. At Banbury we added changing rooms, storage and racking inside a working warehouse, and operations never paused.
Fit out, refurbish or move? Deciding for an existing warehouse
Refurbishing a unit you already hold keeps your team, your yard and your customers where they are; fitting out a new lease starts the rent-free clock. Either way, we check the four things that decide the budget on day one: the roof, the floor slab, the incoming power and the clear height under the eaves. See how we work as a fit-out and construction partner for businesses.
Read more
At lease end, the same survey tells you what the landlord can claim under dilapidations and what is worth putting right before you hand back or renew. For landlords re-letting a unit, a refurbishment that lifts the EPC rating keeps it lettable under the Minimum Energy Efficiency Standards (MEES), which apply to industrial units as much as to offices.
Whether you are comparing warehouse refurbishment contractors, warehouse fit out companies or a team for an industrial refurbishment or factory refurbishment, the question is the same: who owns the programme while the building is still working. With us, one contract covers design, consents, structure, services and finishes.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What does a warehouse fit out cover?
Six parts of one building, priced together and built by one team, so the racking, the offices and the power arrive in the right order and nothing is built twice. Also under the same contract: strip-out, drainage and pumped waste, and mechanical and electrical integration with your existing systems.
Mezzanine floors and installation
Steel mezzanines for storage, picking or offices, designed to your loads with stairs, barriers and pallet gates.
Racking, storage and safety barriers
Pallet racking, storage rooms and barriers set out with the layout, so aisles, routes and fire exits work from day one.
Offices, welfare and changing rooms
Offices, canteens, WCs, changing rooms and lockers built inside the shell, finished to the standard your visitors see.
Power, high-bay lighting and heating
Incoming supply and distribution, high-bay LED lighting, heating, ventilation, fume extraction and fire alarm, tested before handover.
Floors, slabs and line marking
Slab repairs, joints, resin and sealed floors, and line marking for aisles, walkways and loading zones.
Roofs, cladding and loading doors
Roof and cladding repairs, rooflights, new openings, loading doors and dock levellers for tired industrial units and factories.
Mezzanine floor installation, designed and certified
A mezzanine adds floor space without a new lease or a move. We design the deck to your loads, install it in zones while the warehouse keeps working, and hand it over signed off by building control, with the stairs, barriers and pallet gates in place.
Read more
Most warehouse mezzanine floors are freestanding steel structures on their own columns; others are carried by the racking. We check the floor slab under every column base before we draw anything, because the slab decides where the columns can go and what the deck can carry.
Inside an existing building a mezzanine rarely needs planning permission, but it does need Building Regulations approval: the structure, the escape routes, the stairs and protection from falling. Where the fire strategy asks for it, the deck and columns get fire protection. The details are set out in our guide to warehouse mezzanine floor regulations.
For a mezzanine office, the same team adds partitions, lighting, heating and power on the deck, so storage below and offices above are finished together under one programme.
How it works
How does a warehouse refurbishment run while you operate?
01
Survey: slab, roof and power
We walk the unit with you, map how goods, people and vehicles move, and test what the building can carry.
02
Layout and fixed programme
Zones, racking, mezzanine and services drawn up, one agreed price and a programme built back from your date.
03
Regulations, fire and licence
Building Regulations, the fire strategy and the landlord's licence for alterations, prepared by us.
04
Phased build around operations
Work split into zones so goods keep flowing, with walkways and fire exits kept open throughout.
05
Handover with certificates
Every system tested, the certificates and manuals in your hands, and the unit ready to trade.
The Craftex Guide to Warehouse Fit Out
One guide to layout, budget, compliance and the fit-out essentials, with the checklist that keeps a warehouse project on track from survey to handover. Free, and worth reading before the first walk-round.
Our promises
Six promises, written into your contract
Not marketing lines. These are the terms we build to on every warehouse.
-
One team, survey to keys
One contract and one point of contact, led by the same directors from the first site walk to handover.
-
The agreed price stands
A fixed lump sum for a written scope, with the programme written into the contract. Any change is priced and agreed in writing first.
-
Your warehouse never stops
Phased zones, noisy work out of hours and safe routes kept clear, so goods keep moving.
Banbury: built inside a live warehouse
-
Built faster
Around 60% of the labour on site is our own, so no week is lost waiting for trades.
Drake's: 500 m² railway arch in 8 weeks
-
£10M cover on every job
Public, employers' and professional indemnity cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Zero snags at handover
We don't leave until it is right. Test certificates and the health and safety file handed over on day one.
Already have a quote? Send it to us. We'll beat it.
Send the quote you hold for your warehouse, mezzanine or industrial unit. A director reads it line by line and replies the same working day with our figure for the same scope, plus a programme that hits the date your unit must be ready.
Compare your quotes
Where do warehouse fit outs stop operations?
Hold any proposal up against this list. The risks are the same in every warehouse; who carries them is not.
| Area | The usual risk | With Craftex |
|---|---|---|
| Mezzanine without approval | A deck goes in, then building control asks for changes to the stairs, escape and fire protection | Building Regulations approval and the fire strategy settled before the steel is ordered |
| Power supply too small | New lighting, chargers and plant overload the incoming supply in the first week | The supply checked on the survey and any upgrade ordered with the programme |
| Slab not rated for racking | Racking or mezzanine columns crack a floor that was never designed for point loads | Slab tested under every column base before the layout is fixed |
| Fire strategy missed | Offices and mezzanines block escape routes or change the fire alarm cover | Escape routes, alarm and emergency lighting redesigned with the layout |
| Loading bays blocked | Plant, skips and deliveries for the works sit where your trucks need to turn | Site logistics planned around your dock schedule, with the yard kept clear |
| Three firms, no owner | A racking supplier, an electrician and a builder, each pointing at the others | One design-and-build team answers for the whole unit, from the first drawing to the keys |
What sets the budget of a warehouse fit out?
Six things move the figure more than anything else. We survey each one on the walk-round and settle it in writing before you sign.
| What | What moves the budget | What we fix before you sign |
|---|---|---|
| Mezzanine area and loading | Deck size, load class, stairs, barriers and fire protection | The load class and layout, drawn and agreed |
| Slab and floor repairs | Cracks, joints, levels and any new column bases | A slab survey and the repair scope |
| Power upgrade and lighting | Incoming supply, distribution, high-bay lighting and chargers | The supply check and an electrical design |
| Offices and welfare | Size, finish level and the services they need | Room-by-room layout and finish schedule |
| Roof and cladding | Leaks, rooflights, insulation and loading doors | A roof and envelope survey |
| Phasing around operations | Zones, night and weekend work, protection and site logistics | A phasing plan built around your dispatch |
Our construction work runs from £100,000 to £10M and above. We usually advise a contingency of 5–10%, more in older industrial buildings. What the scope can include: what is a warehouse fit-out.
Free cost calculator
What will your warehouse fit out cost?
Enter your floor area and pick a scope for an instant range at our 2026 rates. Your fixed figure follows the survey of the slab, the roof and the power.
Industrial fit out from London to the Midlands
London and the M25. Last-mile units, railway arches and industrial estates from Park Royal to Hackney and Bethnal Green, where space is tight and every week out of use costs rent. Our Hackney unit and Drake's railway arch are both here.
Oxfordshire, the Midlands and the South East. Distribution and manufacturing units on the logistics corridors, refurbished around shifts that never stop. At Banbury we built inside a working warehouse.
Read more
Industrial fit out, factory fit out and warehouse office fit out are one service with us: production floors, clean rooms for light manufacturing, offices built inside the shed or on a mezzanine, and the services they need. Mezzanine floor installation, racking and welfare can run in the same programme as the refurbishment, so the building is disrupted once, not three times.
We fit out warehouses across London, including Canary Wharf and Greenwich, and across the UK, including Surrey, Reading, Oxford, Cambridge, Birmingham, Manchester, Leeds and Bristol. Local pages: warehouse refurbishment in Surrey, warehouse refurbishment in Basingstoke, warehouse refurbishment in Glasgow and warehouse refurbishment in Edinburgh.
Warehouses we have fitted out
A live distribution warehouse, a services overhaul and a railway arch: three units fitted out by our own team, each handed over on the agreed date.
-
Banbury, Oxfordshire: warehouse kept running Banbury Warehouse: £350K of offices, changing rooms, lockers, racking and barriers across 2,500 sq m in 8 weeks. View case study
-
Hackney, London: every system in 4 weeks Hackney warehouse: power, heating, lighting, pumped drainage and fume extraction for a warehouse unit. View case study
-
Bethnal Green, London: design and build Drake's Warehouse: a 500 sq m railway arch with design, services and building control by one team in 8 weeks. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Warehouse fit out: your questions
Can you refurbish the warehouse while we keep operating?
Yes. We split the building into zones, keep walkways and fire exits open and move noisy work around your shifts. At Banbury the changing room, storage room and racking went in while the warehouse carried on working around us.
Does a mezzanine need planning permission or Building Regulations approval?
Planning permission is seldom needed for a mezzanine inside an existing warehouse. Building Regulations approval is needed: building control checks its structure, escape routes, stairs and protection from falling. We prepare the drawings and the submission.
Should we refurbish our warehouse or move?
It depends on the roof, the slab, the power and how long you hold the lease. We survey those first and tell you which way the numbers point. The trade-offs are set out in warehouse fit-out vs renovation.
What drives the cost of a warehouse fit out?
The mezzanine area and loading, the slab, the power upgrade, the offices and welfare, the roof and the phasing around your operations. Our calculator gives a range at our 2026 rates; what a warehouse fit-out includes explains the scope. We fix the figure after a free survey.
Do I need landlord consent for a warehouse fit-out?
Usually yes, through a licence for alterations. We prepare the drawings and specifications your landlord's surveyor asks for. See licence for alterations explained.
Do you design the warehouse layout?
Yes. We map how stock, staff and vehicles flow through your unit first, then plan zones, racking, routes, offices and loading. More in warehouse layout design and planning.
Where do you work, and what size of project?
Across the UK and London, from the M25 to the Midlands. Construction projects from £100,000 to £10M and above, from a single unit to a whole distribution site.
Do you design and install mezzanine floors?
Yes. We design the deck to your loads, check the slab under each column, then install it with stairs, barriers and pallet gates and take it through building control. Planning and building control rules: mezzanine floor regulations for warehouses.
Can you build offices and welfare inside the warehouse?
Yes. Offices, kitchens, washrooms and staff rooms, inside the shell or up on a mezzanine. Drake's now holds offices, a photo studio, production and dispatch under one railway arch. Office-only projects: office fit out.
How long does a warehouse fit out take?
We fix the dates in the contract. For scale: Banbury, 2,500 sq m in 8 weeks; Hackney in 4 weeks; Drake's railway arch, 500 sq m in 8 weeks on site.
Do you build new warehouses too?
Yes, through our construction team. New sheds and logistics hubs are on our warehouse and logistics hub construction page; this page covers existing warehouses and industrial units.
Do I need planning permission or building control to refurbish a factory?
Internal alterations to a factory or industrial unit do not normally need planning permission (Planning Portal), but external changes, an extension or a change of use between industrial classes can. Building Regulations still apply to structural alterations, new mezzanines, fire-safety changes and energy-efficiency upgrades (Approved Documents B, volume 2, and L, volume 2), checked by your council or a registered building control approver. The Regulatory Reform (Fire Safety) Order 2005 also expects an up-to-date fire risk assessment (gov.uk). We prepare the drawings and submissions.
Do you handle electrical and high-voltage work?
Yes. At Hackney we redesigned the electrics, connected every new system to the high-voltage panel, then inspected and tested it all. We hold the accreditations the work requires.
How fast do you reply?
The same working day, every enquiry. A director takes the call, not a sales desk.
Read before you refit a warehouse
Written from warehouses we have refitted: what it costs, mezzanine rules and whether to refurbish or move.
What our clients say
See all reviews on Google-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Get your free site survey
Send the address, the size and the date the unit must be ready. We will come back to you the same working day to book your site survey.



























