Skip to content
Request a callbackCallback
Bright open-plan workplace with rows of desks, task chairs and tall windows

Office Design and Space Planning

A floor plan your team will use, priced by the people who build it.

Our track record

100% of projects delivered ahead
of programme and on budget

Offices we have designed and built

  • 3 weeksto refurbish 750 sq m at Beaumont House, Kensington
  • 1,550 sq mof offices designed in-house at Portsoken House, Aldgate
  • 12 weeksof nights and weekends to rebuild a 70 sq m reception, Portsoken House
  • 0snags at handover

An office plan that fits how your team works

Craftex designs offices for London and UK businesses: workplace briefing, space planning, interior design and the build, under one contract. Every layout is tested against your headcount and the way your teams work, then priced by our own build team before you sign.

You get one team from the first sketch to the keys. The people who draw your office price it and build it, so the scheme you approve is the one you can afford.

Most offices are planned for a headcount on paper, not for the way people use the floor. We start with how your teams work, meet and grow, then plan the space around that. At Portsoken House our in-house designers drew the offices and our own trades built them.

Open-plan office at Beaumont House with rows of desks, task chairs and planting between them

Why do space planning before the design?

Printed floor plans spread across a table for a space-planning test fit

A space plan tells you how many desks, rooms and square feet you really need, before you pay for finishes. Plan for headcount, growth, meeting load and hybrid days, and you stop renting space nobody uses. See how we work as a fit-out and construction partner for businesses.

Read more

Office space planning is the step that fixes the layout and the numbers. It sets where each team sits, how many desks you need on your busiest day, and how much room goes to meeting rooms, focus booths, storage and circulation. Office design then adds the look, materials, lighting and services on top of that plan.

We work from the net internal area of the floor, the part you can actually use, not the gross figure in the agents' particulars. Desk ratios come from how often each team is in, with room to grow. Our office space planning services cover a single floor or a whole building. For office space planning in London, we test-fit several buildings side by side so you can compare them before you sign a lease.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does our office design service cover?

Six parts, one contract, one team accountable for all of them. Office design and build under one contract means one price, one programme and one party answering for the result. We also cover 3D visuals, mechanical and electrical design and the build itself as an office fit out.

A man studying a wall covered in sticky notes grouped into themes during a workshop

Workplace brief and headcount study

How your teams work, meet and grow, and how often each one comes in.

Hand-drawn layout sketch of an open-plan office with desks, meeting rooms and a reception

Space planning and test fits

Layout options drawn on your floor plan, so you can compare buildings before you sign.

Dark marble, timber, felt and metal finish samples laid out as a material palette

Office interior design and finishes

Materials, colour, lighting and brand, specified and priced before anything is ordered.

Oak-framed glazed meeting room with a marble table and a quiet focus room beyond

Furniture, AV and IT layout

Desks, meeting-room screens, data points and power, planned with the layout.

Open-plan office floor at Beaumont House with desk clusters, plants and a glazed meeting room

Design and build under one contract

The team that draws your office builds it, so nothing falls between a designer and a builder.

An office floor at Portsoken House with new ductwork, cable trays and lighting under an open ceiling

Landlord approvals and Cat A/Cat B scope

Licence drawings for your landlord and a clear split of base-build and fit-out work.

Corporate interior design for London headquarters

Glass-walled meeting room at Portsoken House in Aldgate with a walnut table, black chairs, a wall screen and a frosted band on the glass

Corporate interior design turns the space plan into a headquarters that looks and works like your business: reception, client suite, boardroom, meeting rooms and workfloors. We design it and build it with our own team, so the finish on the drawing is the finish you move into.

Read more

Office interior design in London starts with the brief, not a mood board. We fix how many meeting rooms you need, and what sizes, from your busiest day, then design the glass, acoustics, fresh air and AV for each one. Our guide to meeting room design shows how.

In a headquarters the client floor matters most: a reception that sets the tone, a boardroom and client suite on their own route, and finishes that survive daily use. Stone, veneer, bespoke joinery and lighting are specified and priced before anything is ordered, then built by the team that drew them.

Comparing corporate interior design companies? Ask who builds the scheme. With design and build under one contract, one team answers for the result, and nothing falls between a designer and a contractor.

How it works

How do we design and build your office?

01

Brief

We learn how your people work and meet, how you expect to grow, and the date you have to move.

02

Test fit

Layout options on your floor, with desk and room numbers for each.

03

Design

The look, materials and services, priced by our build team as it is drawn.

04

Fixed build figure

Licence drawings and Building Regulations, then one fixed figure and a programme.

05

Build and handover

Our own trades build it as drawn and hand it over with zero snags.

Cover of the free Craftex Guide to Office Design and Fit Out

The Craftex Guide to Office Design and Fit Out

Plan the space before you sign anything: how to size the office, what drives cost and time, and the checklist that keeps your move date safe. It is free and takes ten minutes to read.

Our promises

Six promises, written into your contract

Not marketing lines. These are the terms we design and build to on every office: one team from sketch to keys, the design priced as it grows, ready before your lease date, built as drawn, £10M cover on every job, and zero snags at handover.

  1. One team, sketch to keys

    One team designs, prices and builds your office, with no gap between design and build.

  2. The design is priced as it grows

    You see the cost at each stage. The agreed price stands, and any change is put in writing and priced first.

  3. Ready before your lease date

    We build the programme back from the date you have to move.

    Beaumont House: 750 m² ready in 3 weeks

  4. Built as drawn

    Around 60% of the labour on site is our own, so the details you approved are the details you get.

    Portsoken House: designed in-house, built by us

  5. £10M cover on every job

    Public, employers' and professional cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.

  6. Zero snags at handover

    We stay until it is right. Certificates and the health and safety file are yours on day one.

A printed office design and build quotation on a desk with a sticky note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a design-and-build quote, or a designer's scheme priced by someone else? Send it to us. We come back the same working day with how we would beat it for the same scope, and a programme that hits your lease date.

Compare your quotes

Where does office design usually go wrong?

Hold any scheme or quote up against this list. The risks are the same on every project; who carries them is not. Most of these risks come from splitting design and build between two firms. When one team draws, prices and builds, the gaps close before work starts.

AreaThe usual riskWith Craftex
Who is responsibleA designer draws it, a builder prices it, and nobody owns the gapOne team designs, prices and builds, and answers for all of it
The budgetA scheme you sign off, then a build price far above itCost checked at each design stage, then one fixed figure
How much spaceA desk for everyone, half of them empty most daysDesks and rooms set from how the office is really used
The lease dateWeeks of redesign when the price comes back too highA programme worked back from your date, approvals run in parallel
Compliance and sign-offFire strategy and building control left for you to chaseFire and escape routes, emergency lighting, testing and certificates prepared by us
HandoverAn office that drifts from the drawings, and a long snag listThe office you approved, with the paperwork in your hands

What do you get at each design stage?

Each stage ends with something you can hold, check and sign off before the next one starts.

StageWhat you receive
BriefA written brief: teams, headcount, growth, meeting needs and your move date
Test fitLayout options on your floor plan, with desk and room counts for each
ConceptThe look and feel: materials, colours, lighting and furniture direction, with 3D visuals
Detailed designDrawings and specifications for the build, services and your landlord's licence
Build figureOne fixed price and a programme, from the team that will build it
Build and handoverThe finished office, certificates and the health and safety file

The stages run in this order on every office we design, whether it is one floor or a whole building. Approvals and Building Regulations run alongside the detailed design, so they do not add time at the end. A full breakdown of what drives the build cost is in our office design and fit-out cost guide.

Free cost calculator

What will your office fit out cost?

Enter your floor area or headcount and pick a specification. The calculator gives an indicative build figure at our 2026 rates, ex VAT, for a Cat A floor in good order.

I know my
Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

It covers the fit-out build, furniture, and AV and IT, so you can see what the design you are planning will cost to deliver. Your fixed figure follows a survey of the floor and an agreed layout.

Office design for London businesses: where we work

Glass-walled private offices and a meeting room off the main floor at Portsoken House in Aldgate

London. We design and build offices across the City, Westminster, Kensington, Aldgate and Shoreditch. Recent work includes Beaumont House in Kensington and Portsoken House in Aldgate.

Office tea point with a white stone island, bar stools and full-height cabinets

Across the UK. We also design and fit out offices outside London, in Surrey, Birmingham, Bristol, Leeds and Glasgow.

Read more

Looking for office design consultants or office design companies in London? We work across the capital, including Mayfair, Westminster, Marylebone, Canary Wharf, Islington, Hammersmith, Kensington and Battersea, and beyond into Surrey and the rest of the UK. Office interior design in London is the same service with the same team, wherever your building is.

Office designers who price and build what they draw

Office breakout space with a long oak bar table, leather stools and glass pendants under a slatted timber ceiling, beside a sculpted wall

Workplace consultancy first, then the drawings

Before anyone draws a room, we gather the facts a design depends on: attendance by team and by day, meeting patterns, storage, growth over the lease and what the floor can take. Many workplace design consultants hand over a report at that point. With us, it becomes the brief for the drawings and for the price.

A design and build company, not a studio alone

An office design company that only designs passes its drawings to a contractor, and the first real cost arrives after the design fee is spent. As an office design and build company, our estimators cost each stage while it is drawn, so the scheme stays inside the budget you set.

Bright meeting room with a marble table and green chairs beside an oak-framed glass office with desks

What to ask office designers in London

Ask to see offices they designed and then built, how attendance data shaped their last layout, and who prices the design as it develops. Our answers are in the projects below: Beaumont House, where over 150 staff moved into a re-planned floor before their lease ran out, and Portsoken House, two office floors drawn by our designers and built in seven months.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Office design and space planning: your questions

What does an office designer do?

An office designer turns how your business works into a floor plan and a finished interior. That covers the brief, the layout, materials, lighting and furniture, and the drawings for the build. Our office design services go one step further: the same team prices and builds what it draws.

How much office space do I need per person?

It depends on your layout, how often people are in, and how many meeting and support rooms you need. An open-plan floor needs less per person than one with many private offices. We set the figure from your own headcount and attendance. Our office space calculator gives a first range.

How long does office design take before work starts?

It depends on the size of the floor and how quickly decisions are made. Licence and building control applications run alongside the design, not after it. When a lease date is tight, we work the programme back from that date.

Can you design around a lease we have not signed yet?

Yes, with a test fit. We draw layout options on each building's floor plan, with desk and room counts, so you can see which one fits your team before you commit.

Can we stay in the building while you work?

Usually, yes. We phase the work, keep noisy jobs out of hours and keep routes safe for your staff. At Portsoken House the rest of the building stayed let and in use throughout.

Do you design agile and hybrid offices?

Yes. Agile design gives each team a mix of settings, from open desks to focus booths and project rooms, sized from how often people come in. We test that mix on your floor plan first, so you see how many desks a full day really needs.

Do you design for sustainability and wellbeing?

Yes. We plan daylight, planting, acoustics and low-energy lighting from the first layout. Ideas you can use: sustainable office design tips.

What is office space planning, and do I need it before a fit out?

Yes, if you are moving or changing how the floor is used. Space planning fixes the layout and the numbers: desks, rooms, storage and circulation, tested on your floor plan. It stops you paying to fit out space you do not need. More in office space planning vs office design.

Can you design and build our office under one contract?

Yes. The team that draws your office prices it and builds it, under one design and build contract. Once the layout is agreed, the build runs as an office fit out with one fixed figure.

Do you work outside London?

Yes. We are based in London and design and build offices across the UK, including Surrey, Birmingham, Bristol, Leeds and Glasgow.

Who handles landlord approvals and the licence for alterations?

We prepare the drawings and specifications your landlord asks for, and we answer their surveyor's questions. See licence for alterations explained.

How much does office interior design cost?

It depends on the floor area, how many design stages you need and whether we also build it. We quote the design stages once we have the floor plan and your headcount, and the calculator above gives a first range for the fit out itself.

How fast do you reply?

The same working day. Share the address, floor plan and headcount, and a director comes back to you with how we would approach it.

What our clients say

See all reviews on Google
  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning a new office, or rethinking the one you have?

Send us the address, the floor plan and your headcount. We will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us