High-End Residential Architects
Drawn for consent, priced as it is drawn, then built by our own team.
Craftex
100% of our projects finished aheadof programme and on budget
Homes we have designed and built
- 450 m²prime Knightsbridge home at Herbert Crescent, refurbished in 32 weeks
- 12 weeksto design and refurbish the Kensington Olympia penthouse
- 4 weeksto draw and cost four options for a derelict club in St John's Wood
- 10 yearson the market, trading since 2016
Architects who also build your home
Craftex are residential architects for high-end London homes: new houses, extensions, basements and whole-house refurbishments, designed and built by one team. Every drawing is priced by the builders who will deliver it, so the design you approve is one you can afford.
Most London house projects stall in the gap between an architect's drawings and a builder's quote. Ours do not: our architects sit in the same company as our construction team, so you see the build cost of every idea before you fall for it.
Townhouses, mansion flats, penthouses, extensions and new houses, from Kensington and Chelsea to Hampstead and Richmond. Each option is costed before you choose it, and the company that drew it then builds it. For anyone searching for residential architects in London who can also deliver the build, that is the whole offer.
What changes when your architect is also your builder?
You get one price, one programme and one team answerable for the finished house. Nobody redraws your scheme on site, and nobody blames the other firm when something is missed. Herbert Crescent in Knightsbridge was run this way: decided on paper, never on a live site. See how we work as a design and build partner for homeowners.
Read more
How the design stages work. The RIBA Plan of Work 2020 splits a project into eight stages, from Stage 0 (strategic definition) to Stage 7 (use). On a house the work moves from your brief and a survey of the building to concept design, then spatial coordination, where structure and services are fitted in and the planning application goes in. Technical design follows, with the drawings the builders work from and the Building Regulations application. Our construction team prices the scheme at each of these stages, not once at the end.
Traditional or design and build? On the traditional route an architect designs the house, then it goes out to tender and a separate contractor builds it. The build price is unknown until the tenders come back, often after planning. Under design and build one company takes both the design and the construction, so the build cost is known while the design can still change. The trade-offs are set out in design and build vs traditional procurement.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do our residential architects design?
Six kinds of home work, each drawn, costed and built by the same people.
New luxury houses
A replacement or new house on your plot, from the first massing study to finished interiors.
House extensions
Rear, side and wraparound extensions drawn for planning or permitted development, with the structure resolved early.
Loft and mansard conversions
Dormers, mansard storeys and roof terraces planned with the stairs, the structure and the neighbours in mind.
Basements
Pools, gyms, cinemas, wine rooms and staff flats on a new lower-ground floor, daylit by lightwells and walk-on glass, designed within borough basement policy and party wall rules.
Whole-house refurbishments
Layouts reworked, services renewed and every finish specified before the strip-out starts.
Listed and conservation-area homes
Schemes shaped by the street and its heritage, with listed building consent where the fabric needs it.
Every tile above is one part of a single service: interiors, lighting, kitchens and joinery are drawn with the architecture by our high-end interior design team, and structural steel, heating, ventilation and smart-home wiring are designed into the drawings so nothing is redrawn on site.
How it works
How is your home designed and built?
01
Brief and site
We walk the house or plot with you and agree what it must become, and by when.
02
Concept and cost
Design options arrive with build costs from our construction team. You compare them on real figures.
03
Planning
Pre-application advice, heritage and party wall matters, then one application taken through to a decision.
04
Technical design
Structure, services and finishes drawn to Stage 4. The build figure is fixed here.
05
Build and keys
Our crews build what was drawn and hand over a finished house with the paperwork complete.
The Craftex Guide to Residential Design and Build
Design stages, planning, programme and budgets for a high-end London home, and what to settle before you appoint anyone. Free to download, and a short read before your first meeting with an architect.
Our promises
Six promises, written into your contract
What we commit to on every house, in writing: one team from sketch to keys, the price set while it is drawn, a quiet site on your street, the agreed date, full cover for insurer and freeholder, and zero snags at handover.
-
One team, sketch to keys
Architects, engineers, planners and builders in one company, with one person answering for the whole house.
A Hampstead couple's Google review: design, planning approvals and build run by one project director.
-
Priced while it is drawn
Our builders cost every option at design stage, and the agreed figure then stands.
Allitsen Road: each scheme carried its own unit-by-unit cost plan.
-
Quiet on your street
Deliveries, noise and access planned before we arrive; your name never used.
Kensington Olympia: a 400 sq m penthouse refurbished while every other home in the block stayed occupied.
-
Ready on the agreed date
The programme is fixed in the contract, and about 60% of the labour is our own.
Medusa, Knightsbridge: four floors designed and built in 17 weeks.
-
Covered for insurer and freeholder
£10M public and employers' liability, professional indemnity on request, ISO 9001, 14001 and 45001, CHAS.
-
Zero snags, every certificate
We leave when it is right, with Building Regulations sign-off and test certificates filed.
Kensington Olympia: no snags or defects at completion.
Already have a quote? Send it to us. We'll beat it.
Holding an architect's fee proposal, or a builder's tender for a scheme someone else drew? Send it to us. Within the same working day you hear how we would beat it, line by line, for the same house.
Compare your quotes
Where do high-end home projects usually go wrong?
Six places where a house project slips, and who carries the risk in each. Check your own scheme against it before you sign. Almost every row traces back to the same cause: design and construction split between firms that are paid separately and answer separately. Close that split before the first drawing, and most of these risks never reach your house.
| Area | The usual risk | With Craftex |
|---|---|---|
| Responsibility | The architect draws, the builder redesigns, and each blames the other. | One company answers for the drawings and the build alike. |
| The final bill | Planning consent arrives, then tenders land far above the budget. | Build cost checked at every design stage, before you sign anything off. |
| Planning | Refusal, or a year of redesign, on a conservation street. | Officer feedback and heritage advice shape the scheme before it is submitted. |
| Your time | You chair weekly meetings between five consultants and a contractor. | One project director reports to you; you only make the decisions. |
| Compliance | Building control, fire and structural sign-offs chased at the very end. | We run every approval and certificate your insurer and lender ask for. |
| Handover | Moving into a snag list and a missing paperwork file. | Snagged before you see it; manuals, warranties and certificates in one folder. |
RIBA stages: what you get at each stage
What we do at every stage, and the drawings or documents you sign off before we move on.
| Stage | What we do | What you receive |
|---|---|---|
| 0–1 Strategic definition and briefing | Site visit, planning history, constraints, your brief and budget agreed | A written brief and first options |
| 2 Concept design | Options drawn, pre-application advice, build cost from our construction team | Concept drawings, cost plan, planning strategy |
| 3 Spatial coordination | Structure and services coordinated, heritage and party wall matters | Planning or listed building consent application, updated cost plan |
| 4 Technical design | Construction drawings, specifications, Building Regulations | A fixed build figure and programme |
| 5 Manufacturing and construction | Our crews build it; design questions answered on site | Site reports, changes priced in writing first |
| 6 Handover | Snagging, commissioning, final checks | Completion certificate, manuals, warranties |
Stage names follow the RIBA Plan of Work 2020. Stage 7 (use) begins once you are living in the house.
Free cost calculator
What will your house cost to build?
Enter the floor area and choose the work. You get a build range at once, from our 2026 rates.
Extensions and lofts: what the architect does
House extensions. We survey the house, draw the extension, check whether it needs planning permission or falls under permitted development, and prepare the Building Regulations drawings and party wall notices. Then our own team builds it.
Read more
Permitted development limits. On a house in England, a single-storey rear extension may go 3 m beyond the original rear wall, or 4 m on a detached house, without a planning application. Through the prior approval route those depths rise to 6 m and 8 m. A loft may add 40 m³ on a terraced house or 50 m³ on any other house. None of this applies to flats and maisonettes, which have no householder permitted development rights, and conservation areas and Article 4 directions take away much of it. Every limit is set out in permitted development extension rules.
Loft and mansard conversions. A loft is mostly structure, a new stair and a protected escape route, so we draw those first and the room second. Mansard storeys usually need planning permission, and on a London terrace we design them to match the street. Applications run through our planning consultancy team.
Luxury homes we have designed and built
Two London homes we designed and built, and one design study, each costed before any work began on site. Related work: Medusa, Knightsbridge (concept taken on, completed and built) and Portsoken House (designed in-house, then built by the same team).
-
Herbert Crescent, Knightsbridge A prime home where every layout, finish and fixing was agreed from drawings and samples before the build began. View case study
-
Kensington Olympia penthouse A monochrome scheme and a new dressing room, designed and refurbished by us as main contractor from concept to completion. View case study
-
Allitsen Road, St John's Wood A design and feasibility study: a derelict members' club opposite listed houses, drawn as costed options for four to seven flats. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Residential architects: your questions
How much does a residential architect cost?
It depends on the fee model and the scope. The RIBA describes three: a percentage of the construction cost, a fixed fee for a defined scope, or an hourly rate for open-ended work. We agree our design fee per stage, in writing, once we have seen the house and the brief. More in architect fees in the UK.
What drawings do I need for planning and building regulations?
For planning: existing and proposed plans, elevations and sections, a site and location plan, and often a design and access or heritage statement. For Building Regulations: construction drawings and specifications covering structure, fire safety, insulation, drainage and ventilation. We prepare both sets.
What are the RIBA stages?
The RIBA Plan of Work 2020 has eight stages, 0 to 7: strategic definition, preparation and briefing, concept design, spatial coordination, technical design, manufacturing and construction, handover, and use. Planning applications usually go in at the end of Stage 3.
Do you work on listed or conservation-area homes?
Yes. Conservation areas restrict demolition, roofs, windows and front elevations, and listed homes need consent for interior work too; building without it is a criminal offence. At Allitsen Road we tested every option against Westminster and London Plan policy, opposite two Grade II listed houses. We take pre-application advice before anything is submitted.
Can we live in the house during the works?
It depends on the scope. On an extension or a phased refurbishment some clients stay in; a whole-house strip-out usually means moving out for the works. Either way, we plan noise, access and neighbours before we arrive. Party wall notices go out before work on a shared wall; see the party wall act guide.
Do I need an architect for an extension?
Not by law, but you need drawings the council and building control will accept, and on a London house those drawings also fix the build cost. A small rear extension under permitted development still needs Building Regulations approval. Read how to choose an architect in London.
How much does it cost to build a house in London?
It depends on size, specification, the plot and whether there is a basement. Our calculator gives a first build range per square metre at our 2026 rates, and the figure is fixed at technical design. For what drives the design side, see how much luxury home design costs.
Can one company design and build my house?
Yes. The same company draws the house, prices it as the drawings develop and builds it. Portsoken House was designed by our in-house team and built by it, and Medusa in Knightsbridge came to us as a Stage 2 concept that we completed and built.
How long does design take before work starts?
Several months is typical. Under national planning rules, councils aim to decide householder applications within eight weeks of validation, and major schemes within 13. Pre-application advice, heritage consents and party wall notices add time. Your design and planning dates are written into the appointment. See how long planning permission takes.
How fast do you reply?
The same working day. One of our directors calls you back with how we would approach your house.
Read before you brief an architect
What we tell clients before the first drawing: fees, drawings, stages and build cost.
-
Guide Architect for a House Extension: What to Expect Read the guide
-
Guide How Much Does Luxury Home Design Cost in the UK? A Complete 2026 Guide Read the guide
-
Guide Planning and Building Regulations Drawings Explained Read the guide
- More guides
- Architect fees in the UK
- How to choose an architect in London
- The cost to build a house
- RIBA stages explained
- Luxury vs modern home architecture
- Luxury home architecture trends
- Top features of luxury home architecture
- Choosing luxury home materials
- Luxury home planning mistakes
- Eco-friendly design ideas
- Permitted development extension rules
- Design and build vs traditional procurement
- How long planning permission takes
- Case studies
- Related services
What our clients say
See all reviews on Google-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Have a house or a plot in mind?
Send us the address, a few photos or the agent's particulars. We will come back to you the same working day.



























