Skip to content
Request a callbackCallback
Curved stone facade of a grand period office building at Finsbury Circus in the City of London

Commercial to Residential Conversion: Design and Build

Office blocks and period commercial buildings turned into premium apartments, one contract from planning route to keys.

Our track record

100% of projects delivered ahead
of programme and on budget

What our clients get

  • 2 monthsearlier exit on a 600 m² office turned into 8 apartments, in the client's own words
  • 4 weeksfrom a derelict club to four priced schemes of up to 7 flats
  • 0snags at handover, every certificate ready for completions
  • £10Minsurance cover, ISO and CHAS, every accreditation your lender asks for

Homes from buildings that stopped earning

Craftex delivers commercial to residential conversion from the first appraisal to the completion certificate: planning route, design and the build under one contract. We test what the building can hold before you commit, then the team that drew the flats prices and builds them.

Investors and developers bring us office blocks, former banks and period commercial buildings that no longer let. We turn them into apartments buyers pay a premium for: generous layouts, daylight in every room and a finish worthy of the address. You know what the scheme is worth before you spend on drawings.

Sunlit Portland stone facade of a period London office building with tall windows and carved detailing

Which commercial buildings convert well?

Red scale rule lying across printed technical drawings in daylight

The building decides the number of flats, and the number of flats decides the margin. We read five things first: the depth of the floor plate, the windows, the cores and stairs, the parking and access, and the rights of light around it. Get those right and the apartments sell on their own merits. See how we work as a construction partner for developers and investors.

Read more

Office to residential conversion has had its own planning route since 2013. Class O let offices become homes through prior approval; since August 2021 Class MA covers the wider Class E, so a building that has sat in Class E for two years running can become homes without a full application. The council may only consider the listed matters: transport, contamination, flooding, noise, natural light, the conservation-area ground floor, industrial areas, loss of a nursery or health service, and fire safety for taller buildings.

A full application is needed where an Article 4 direction removes Class MA (the City of London borough-wide, and the centres of Westminster, Camden, Kensington and Chelsea, Islington, Lambeth, Southwark and Tower Hamlets), for listed buildings, for pubs and clubs (sui generis uses) and for any external change such as new windows or a roof storey. Our permitted development and prior approval team runs both routes.

Every flat must meet the nationally described space standard, from 37 m² for a one-bedroom, one-person flat, and Class MA makes natural light in every habitable room a prior-approval matter. If the finished building is 18 metres or seven storeys or more with at least two homes, it is a higher-risk building and the design passes Gateway 2 with the Building Safety Regulator. Commercial conversion, building conversion and office conversion all follow these rules; what changes is the planning route.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does our conversion service cover?

Office to residential conversion specialists, from the planning route to the last finish, under one contract. Converting a church or a former pub follows its own planning route: see our guide to church conversion to homes in London. Where the structure allows it we also add a roof storey through our airspace and upward extension team.

Brick apartment building with glazed balconies on a London street

Office to residential

Office blocks re-planned as apartments: new cores where needed, deep floors cut back to bring light in.

Portland stone facade of the former London Fruit Exchange and London Wool Exchange building

Banks and high-street buildings

Banking halls and upper floors of period high-street buildings turned into apartments above a retained ground floor.

Victorian entrance of the London Leather, Hide and Wool Exchange with carved stone atlantes

Pubs, churches and landmark buildings

Former pubs, chapels and listed buildings converted with the character that sells them kept.

Stripped brick shell with new steel columns and beams under tall sash windows in sunlight

Structure, fire and sound

New openings, floors and stairs, fire separation between flats and acoustic floors that pass testing.

First-fix electrical conduits and heating pipework laid across a stripped floor, ready for inspection before the screed

Building control and warranties

Building Regulations, the fire strategy, warranties and the completion file your lender needs.

Finished apartment living room with tall black-framed windows, high ceiling, cream sofas and brass tables

Fit-out ready for sale or rent

Kitchens, bathrooms and finishes to the specification your appraisal was priced on.

How it works

How does a conversion run from appraisal to sale?

01

Free appraisal

Send us the address and the current use. We tell you plainly whether homes are worth pursuing and which planning route fits.

02

Options and route

Layouts drawn, costed and tested against local sales values, then the strongest option and its planning route chosen.

03

Planning

Prior approval under Class MA where it applies, a full application where it does not. One scheme goes to the council.

04

Design and agreed figure

Survey, technical design and one agreed figure, the same one your lender sees.

05

Build and handover

Our own crews on site, weekly quality checks, certificates and warranties handed over with the keys.

Cover of the free Craftex Guide to Office to Residential Conversion

The Craftex Guide to Office to Residential Conversion

Class MA or full planning, the space standards your flats must meet and fire safety under the Building Safety Act. The process step by step, the main cost drivers and a 20-point checklist to work through before you commit.

Our promises

Six promises, written into your contract

Written terms, not slogans: what we sign up to on every building we convert.

  1. One team from appraisal to keys

    Route, drawings, structure, services and finishes on a single contract, so no gap opens between consultants.

    Allitsen Road, four options to one scheme, one owner

  2. The agreed number is the number paid

    No variation goes ahead until you have its price on paper and have said yes.

    Google review, shop-to-flat conversion in Chelsea: no hidden extras

  3. Ready before your exit date

    One programme, with design and procurement running in parallel.

  4. Built faster with our own labour

    About 60% of the crew on site are employed by us, so the programme does not stall between trades.

    Portsoken House, 1,550 sq m office fit-out in 7 months

  5. Covered for your lender

    Professional indemnity on request, plus ISO 9001, 14001 and 45001 certification and CHAS and SafeContractor accreditation.

    collateral warranties from our consultants and designers

  6. A complete handover

    Every flat handed over with the completion file your solicitor, insurer and buyers need.

    defects liability for 12 months, extendable, and a warranty of up to 10 years

Example conversion quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Holding a conversion price from someone else? Send it over. We reply the same working day, beat it like for like and show a programme built around your exit date.

Compare your quotes

Where do commercial conversions lose money?

Compare any tender with this table. Every conversion carries these risks; the question is who holds them. Most of the money a conversion loses is lost at a hand-off: appraisal to planning, planning to design, design to site. With one team holding the scheme from the first layout to the last certificate, those hand-offs happen inside one programme.

AreaThe usual riskWith Craftex
Who is responsibleSix firms, and the money leaks in the gaps between themOne contract, with one director answerable from the first viewing until the keys
The final billA rate per square metre quoted before anyone has opened a wallA surveyed, agreed number your lender sees before work starts
The planning routeApply for planning and hopeRoute and evidence chosen first, CIL and affordable housing quantified, one scheme to the council
The dateConsultants working one after another while the finance clock runsDesign, surveys and procurement in parallel: Allitsen Road programmed at 14 months on site against 74 weeks standard
Compliance and sign-offFire, sound, daylight and drainage found by building control, lateDesigned in from day one, with every approval and certificate run by us
HandoverA snag list and months chasing certificatesCertificates and warranties in the folder on the day

What sets the cost of a commercial conversion?

Six decisions move a conversion budget most. Each is fixed in writing before the contract, which is why the signed figure holds.

DecisionWhat moves the costWhat we fix before you sign
Strip-out and structureHow far the building is stripped, new openings, floors and coresA structural survey and the scope of strip-out drawn
Facade and windowsNew or upgraded windows, insulation, external repairsThe facade scope, consented with the planning route
Fire, sound and second stairFire separation, sprinklers where triggered, acoustic floors, escape routesThe fire strategy and acoustic specification agreed with building control
Services per flatSeparate heating, water, power and ventilation for every homeA risers and meters plan for the whole building
Planning conditions and CILConditions, Community Infrastructure Levy, affordable housingEvery obligation quantified in the appraisal
Finishes for sale or rentKitchens, bathrooms, joinery and flooringA specification matched to the values in your appraisal

Land, finance, sales and legal fees sit outside the build figure. A contingency of 5–10% is sensible, depending on the building. VAT on a conversion can be charged at 5%: see VAT on commercial to residential conversions.

Free cost calculator

What will your conversion cost?

Type in the floor area, pick a finish level and see a first range at once, worked from our 2026 indications.

Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT and fees, covering the build alone, measured on gross internal floor area. Adding a roof storey costs extra, at about £1,440 for each m² of new floor. A survey sets the fixed figure.

Conversions across London and the UK

Drone view of a stucco terrace corner at Hobart Place, Belgravia

Central London first. Our conversion work centres on prime London: the City fringe, Westminster, Marylebone, Camden and St John's Wood, where we tested a derelict former members' club at Allitsen Road as four to seven flats. Each borough reads Class MA differently, so we check its Article 4 map before anything else.

Red-brick period building with bay windows and wrought-iron balconies

Across the UK. Good conversion stock sits well beyond the capital: period offices in South East towns and regional office blocks. Our Development Director's earlier schemes include the former EMI works at Hayes.

Read more

Looking for office to residential conversion in London or a conversion partner for a regional town? We also work in Kensington, Islington, Reading, Oxford, Cambridge and Surrey. One director leads the scheme, in town or out of it. Read how London boroughs treat office to residential conversion.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Commercial to residential conversion: your questions

Do I need planning permission to convert commercial to residential?

Not always. Offices, shops and other Class E buildings that have held that use for two years in a row can usually go through prior approval under Class MA instead, decided within the statutory period. Listed buildings, pubs and any external change need a full application. More on permitted development and prior approval.

How many flats will my building hold?

As many as fit the nationally described space standard with light in every room. At Allitsen Road the two-bedroom flats were held at the 72 m² minimum, because extra square metres earn no extra rent. See nationally described space standards.

How long does a commercial conversion take?

Prior approval runs to the statutory period; a full application takes longer. The date on site goes into your contract once the building is surveyed. For reference, Allitsen Road was programmed at around three months of pre-construction and 14 months on site.

What VAT applies to a conversion?

Converting a non-residential building into homes can qualify for the reduced 5% rate on the building work. The detail is in our guide to VAT on commercial to residential conversions.

Do you work outside London?

Yes. London is our base, and we convert buildings in South East towns and further afield; one director leads each scheme wherever it is.

Can every office be converted to flats?

No. Deep floor plates with dark cores rarely make good flats, and every habitable room needs daylight. Ceiling heights, routes for drainage and risers, and escape distances the fire strategy can meet decide the rest. The free site appraisal answers this before you buy.

Do you take a conversion from appraisal to completion?

Yes. The appraisal, the planning route, the design, the build and the completion file sit under one contract with one team. Still hunting for the right building? We can source and appraise one through development land and site sourcing.

What drives the budget for converting a commercial building?

Mainly the structure, the facade, fire and sound separation, services for each flat and the planning obligations. Our calculator gives a first range and the conversion cost guide walks through each driver; the figure we sign follows the survey.

Do you convert pubs, banks and churches?

Yes. Former pubs and clubs are sui generis uses, so they need a full application; banks in Class E can often use Class MA; a listed church or any other listed building also needs listed building consent for the works. We plan the route for each before any design starts.

How fast do you reply?

The same working day. Send the address and how the building is used today, and a director comes back to you with a first view of the scheme.

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Send us your building for a free appraisal

Tell us the address and how it is used today. We will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us