Design and Build Construction Company
Prime homes, luxury basements, commercial buildings and warehouses across London, built by our own crews on one contract.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 60%of the labour on site is our own, so your programme never hangs on a subcontract chain
- 1,550 sq mof offices delivered at Portsoken House in seven months, every other floor leased and at work
- 0snags at handover, every certificate in the file
- £10Minsurance cover, ISO and CHAS, what your funder and insurer ask for
One main contractor from drawings to keys
Craftex is a design and build construction company in London: one main contractor for prime homes and luxury basements, large commercial buildings, warehouses and conversions, from cost plan to handover. Our own crews do around 60% of the work on site, so the programme and the figure we agree hold from start to finish.
Clients compare construction companies in London on price. They stay with us for what happens after the contract is signed: one director from the first cost review to the keys, our own trades on site, and every certificate in one file at handover. Our construction work runs from £100,000 to £10M and above.
Why choose a design and build main contractor?
One contract, one programme, one figure. Design, approvals and construction are held by one firm and one director, so a gap in the drawings is ours to close, not yours to referee. You agree the scope and the sum once; changes are priced in writing before anyone builds them. See how we work as a construction partner for developers and investors.
Read more
Design and build versus traditional procurement. Under a traditional contract you appoint the architect and engineers yourself, finish the design, then tender it to builders. You hold the design risk, and every gap between the drawings and the site becomes a claim. Under design and build, the main contractor takes on the design (often by novating your consultants) and answers for both design and construction under one contract sum. It suits clients who want cost certainty early and one party to hold responsible. We compare both routes in design and build vs traditional procurement.
Main contractor or principal contractor? The main contractor signs the building contract with you and runs the trades. The principal contractor is a duty holder under the Construction (Design and Management) Regulations 2015: it plans, manages and monitors the construction phase for health and safety. On our projects one firm holds both roles, so there is one plan, one site and one set of records.
Which contract form? For design and build in England the JCT Design and Build Contract is the common form; smaller schemes may use the JCT Minor Works or Intermediate forms, and early contractor involvement uses a pre-construction services agreement (PCSA) before the main contract. Building contractors in London are usually asked to price against the client's amendments: tell us the form at tender and we price against it. Clients looking for a main contractor in London often ask us to take a scheme at stage two of a two-stage tender, after the design and cost plan are settled.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do we build in London?
Six kinds of build where the value is high and the margin for error is small, all delivered by the same directors and our own trades, from cost plan to handover.
Luxury home renovation
Prime townhouses and country houses rebuilt inside: structure, services, joinery and finishes under one contract.
Basement conversion
New lower floors under prime homes, with pools, cinemas, gyms and wine rooms, built with the neighbours protected.
Loft and mansard conversion
A principal suite under a new mansard roof on a period house, designed and built by one team.
Commercial to residential conversion
Offices and commercial buildings taken back to the frame and rebuilt as homes that let and sell.
Warehouse construction
Steel-framed warehouses and logistics hubs, from groundworks to a slab ready for racking.
Self storage construction
New-build and conversion schemes for storage operators, fitted out and ready to let.
How it works
How does a build run with our company?
01
Free cost review
A director reads your drawings and brief, flags the cost and buildability risks, and recommends a route. No charge.
02
Route agreed
Single-stage on a finished design, or two-stage: a pre-construction agreement first, then the packages priced openly with you.
03
Contract and programme
One contract sum and a programme built from real lead times. Changes are priced in writing before anyone does them.
04
Build with our crews
Our own trades on site, a director on your project every week, and the works phased around anyone still using the building.
05
Handover file
Tested, commissioned and signed off by building control, then handed over with zero snags and the paperwork your funder needs.
The Craftex Guide to Investor and Developer Projects
For developers, landlords and owners planning a build: how we take a scheme from brief and cost plan to a finished, certified building, and what to ask any contractor first.
Our promises
Six promises, written into your contract
-
One contract, design to keys
Design, approvals, construction and fit-out sit with one firm and one director, so no gap opens between consultants and builders.
Portsoken House, designed by our in-house team and built by us.
-
The contract sum holds
The figure you sign is the figure you pay; anything you change is priced and agreed in writing first.
100% of our projects on budget.
-
Your building keeps working
Let floors, live warehouses and trading businesses stay open while we build.
Banbury Warehouse: 2,500 sq m refitted in eight weeks around live operations.
-
Ahead of the date you need
Most of the labour is ours, so no week waits on another firm's diary.
Hackney warehouse: the whole unit re-engineered in 4 weeks.
-
£10M cover, every accreditation
£10M public and employers' liability, professional indemnity on request.
ISO 9001, 14001 and 45001, CHAS, SafeContractor and Constructionline.
-
Zero snags, every certificate
We hand over a finished building and a complete record, not a list of things to come back for.
Beaumont House, West Kensington: 750 sq m handed over in three weeks with zero snags.
Already have a quote? Send it to us. We'll beat it.
Send the tender return or the contractor's quote you have been given. A director reads it line by line and comes back to you with where we would beat it on the same scope.
Compare your quotes
Where do London builds go over budget?
Hold any proposal against these six points. The risks are the same on every build; what differs is who carries them. Most overruns start where one firm hands the job to the next: designer to engineer, engineer to builder, builder to fitter.
| Area | The usual risk | With Craftex |
|---|---|---|
| Responsibility | Architect, engineers and builder appointed separately, and every defect becomes an argument about whose drawing it was. | One firm answers for design and construction, so a problem is ours to fix, not yours to referee. |
| The final bill | A tender priced on an unfinished design, then a claim for every item the requirements left vague. | Buildability and cost risks found at pre-construction and closed before the contract sum is fixed. |
| The date | A programme copied from the tender and lost once the subcontract chain starts slipping. | A programme built from real lead times, run by our own trades and checked by a director weekly. |
| Disruption | Tenants, staff or neighbours learn about the works when the noise starts. | Phasing, out-of-hours shifts and protected routes agreed with you before mobilisation. |
| Compliance | Building control, planning conditions, party wall awards and the funder's paperwork chased by the client at the end. | We run every approval and certificate needed to occupy, insure and fund the building, from conditions to completion certificate. |
| Handover | Practical completion with a snag list attached and warranties still to follow. | Keys on the day with nothing outstanding: manuals, as-built drawings and the safety file delivered together. |
What do you get at each stage of a build?
Five stages, each with something in writing you can hold us to. Nothing on this list is a price: the figure comes from your drawings at the free cost review, and these documents keep it there.
| Stage | What you receive | What it protects |
|---|---|---|
| Cost review | A written note on cost and buildability risks, with a recommended route | Your budget, before any contract is signed |
| Tender route | Single-stage or two-stage agreed, with a pre-construction agreement where the design is still moving | Price certainty that matches how finished the design is |
| Contract | One contract sum, the agreed contract form and a programme from real lead times | The figure and the date, in writing |
| Build | Weekly director reports, written change instructions and phasing around occupiers | The programme, and the people still using the building |
| Handover | Building control completion, test certificates, O&M manuals, as-built drawings and the health and safety file | Occupation, insurance, funding and a future sale |
Free cost calculator
What will your construction project cost?
Enter your floor area and choose a scope. The range appears as you type, based on our 2026 London rates; your own figure follows the free cost review.
Building contractors across London
Central and west London. Kensington, Chelsea, Knightsbridge, Westminster and the City: prime homes, mansion blocks and office buildings, often listed, always with neighbours. We fitted out Portsoken House in Aldgate around a building that stayed at work, refurbished Beaumont House in West Kensington in three weeks, and refurbished a £1.5M prime home on Herbert Crescent in Knightsbridge.
North and east London. Islington, Hackney, Tower Hamlets and Canary Wharf: warehouses, conversions and residential blocks, from a Hackney warehouse re-engineered in four weeks to a Canary Wharf penthouse rebuilt with residents at home.
Read more
Looking for building contractors in north London or east London, or comparing builders in London and building companies in London for a larger scheme? We build across Belgravia, Mayfair, Marylebone, Notting Hill, Fulham, Hampstead and Richmond, and on prime houses in Surrey.
Beyond London we work in Glasgow, Edinburgh, Birmingham and Manchester, with case studies in Oxfordshire such as the Banbury warehouse. Local pages: construction company in Cambridge, construction company in Manchester. See all locations.
All our construction services
Every construction service we offer, one tile each, all run by the same team.
-
Luxury Home Renovation
Whole-house renovation of prime townhouses and country houses.Explore -
Basement Conversion
Basements with pools, cinemas, gyms and wine rooms.Explore -
Loft Conversion
Mansard and dormer storeys on period houses.Explore -
House Extensions
Glazed kitchen and garden extensions on prime homes.Explore -
Pre-Construction & PCSA
Two-stage tender: design fixed and priced before you sign.Explore -
Commercial to Residential Conversion
Offices and shops converted into homes that let and sell.Explore -
House to Flats Conversion
Period houses converted into flats, from consent to sale.Explore -
Warehouse Construction
Warehouses and logistics hubs, from groundworks to handover.Explore -
Project Management
Your £5M+ project run for you, on cost and on programme.Explore -
Self Storage Construction
Purpose-built storage buildings for operators, new or converted.Explore -
Warehouse Conversion
Warehouses converted into homes, offices or studios.Explore -
School & Education Construction
Classrooms and school buildings delivered around term dates.Explore -
Data Centre Construction
Data halls, power and cooling built to tier.Explore -
MEP Integration
Mechanical, electrical and plumbing designed and installed as one.Explore -
Turnkey Contracting
Design, build and fit-out handed over ready to use.Explore
Construction projects we have delivered
Three of our London builds: an office conversion delivered around a working building, a £1.5M prime home in Knightsbridge, and a 750 sq m office finished against a lease deadline.
-
Portsoken House, Aldgate A £2.2M full office fit-out in Aldgate while the rest of the building stayed let. View case study
-
Herbert Crescent, Knightsbridge A £1.5M prime home: 450 m² refurbished in 32 weeks, built quietly beside its neighbours. View case study
-
Beaumont House, West Kensington 750 sq m of offices refurbished in three weeks against a lease deadline, handed over with zero snags. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Construction company in London: your questions
What does a design and build construction company do?
It takes your project from brief to keys under one contract: design, approvals, construction and handover. You deal with one firm and one director, and the firm answers for both the drawings and the build. Compare the two routes in our guide to design and build vs traditional procurement.
Which JCT contract do you use?
Usually the form your funder or employer's agent chooses; for design and build in England that is commonly the JCT Design and Build Contract. Tell us the form and any amendments at tender and we price against them. See JCT contract types explained and the JCT Design and Build contract.
Do you build homes as well as commercial buildings?
Yes. We renovate and extend prime houses in London and the home counties, including basements and mansard storeys, and we build and convert commercial buildings, offices and warehouses. The same directors run both.
How do I compare construction companies in London?
Check filed accounts, references from clients with projects your size, who employs the people on site, and the insurance in force. Craftex Ltd, company 10210252, has traded since 2016 and employs most of its site labour directly. Our list of commercial construction companies in London sets out what to ask.
Can you price someone else's drawings?
Yes. Send the drawings, or the quote you already have, and a director prices the same scope. If you have a quote, send it to us and we will beat it.
Are you a main contractor or a principal contractor?
Both. As main contractor we sign the building contract and run every trade; as principal contractor under CDM 2015 we plan, manage and monitor health and safety in the construction phase. Our guide to principal contractor vs main contractor sets out each duty.
What size of project do you take on?
Construction projects from £100,000 to £10M and above: prime homes and basements, conversions, whole-building refurbishments, warehouses and data centres and M&E. Client-side project management is for schemes of £5M or more.
Who handles CDM duties and building control?
We do. As principal contractor we write the construction phase plan and pass our records into the health and safety file, and we run building control, planning conditions and party wall awards through to the completion certificate. A pre-construction services agreement settles who does what before the main contract. Our guide to the CDM Regulations 2015 sets out the client's side.
Do you work outside London?
Yes, for the right project. London and the home counties are our focus; we also build in Glasgow, Edinburgh, Birmingham and Manchester, and our case studies include Oxfordshire.
How fast do you reply?
We reply to every enquiry within one hour, Monday to Saturday, 8am to 6pm. Send your drawings, brief and target date; a director reads them before calling you, so the first call is already about your building.
Read before you appoint a builder
From our own projects: how to compare contractors, contracts and CDM duties before you sign.
-
Guide Commercial Construction Companies in London: 10 Things the Best Have in Common Read the guide
-
Guide 10 Tips to Choose the Right Commercial Contractor Read the guide
-
Guide Common Types of Commercial Building Construction: A Full UK Guide Read the guide
- More guides
- What a commercial contractor does
- What commercial construction involves
- Principal contractor vs main contractor
- JCT contract types explained
- The JCT Design and Build contract
- How a PCSA works
- Design and build vs traditional procurement
- Gateway 2 and second staircases
- The CDM Regulations 2015
- The best design and build contractors in London
- What it costs to build an office building
What our clients say
See all reviews on Google-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.