Beauty Salon Fit Out
Salons, spas and treatment floors, finished before your first booking.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 17 weeksto strip out and rebuild a 180 sq m Knightsbridge spa and salon over four floors
- 1site visit the salon owner needed to make during the build: we ran the rest
- 8 weekson site, after 4 weeks of design, to refit a Savile Row flagship store without closing a day
- 0snags at handover, every certificate in your hands
One team for the salon floor, the treatment rooms and the spa
Craftex delivers beauty salon fit out for owners and brands whose clients expect Knightsbridge standards from the first booking. From a single-floor salon to a four-floor spa like Medusa in Knightsbridge, one team designs, plumbs, ventilates and builds it, and we reply the same working day.
Design, strip-out, backwash plumbing, power at every station, ventilation, lighting, bespoke joinery and the shopfront sit under one contract and one director. Salons and spas we take on start from £150,000: flagship salons, day spas and treatment floors in Knightsbridge, Chelsea, Mayfair, Marylebone and across the UK.
Why do salons and spas need specialist services?
A salon runs on water, air and quiet. Backwashes need drainage with the right falls, nail and colour areas need extraction at source, spa rooms need heat and humidity kept inside the room, and treatment rooms need walls that keep the conversation private. See how we work as a fit-out and construction partner for businesses.
Read more
In London the borough licenses most beauty treatments, and the council approves the treatment-room layout before work starts. Wet rooms, steam rooms and showers are checked by building control for drainage, ventilation and the electrics around water.
Whether you are looking for a salon fit out, a hair salon fit out, a salon refurbishment or a barber shop fit out, the services are the same: water to every wash point, power to every chair, air that keeps chemicals and steam away from your clients. We plan them before the layout is fixed, not after.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What does a salon and spa fit out include?
Six parts of one salon, priced together and built in one sequence, so the plumbing, the power and the joinery meet where they should. Also under the same contract: nail bars, washrooms, acoustics, lighting design, and the drawings your landlord, planning and treatment-licence applications need. Medical treatments that need CQC registration: clinic fit-out and refurbishment.
Salon layout and stations
Stations, flow and lighting planned around chairs per hour and the look your brand needs.
Treatment rooms and spa suites
Rooms planned per treatment, with the water, power, ventilation and quiet each one needs.
Backwash, plumbing and drainage
Wash points, pedicure basins and showers with the right falls, hot water and drainage, built in before the finishes go on.
Ventilation, air conditioning and electrics
Power at every station, comfort cooling, extraction at source for nail bars and colour rooms, and fire and intruder alarms, all commissioned.
Reception, retail and bespoke joinery
Reception desk, retail wall and storage made to measure in our own workshop.
Shopfront and entrance
A frontage that brings people in: glazing, signage, lighting and the external repairs the lease asks for.
Spa design and build
Saunas, steam rooms, hydrotherapy and relaxation rooms are designed and built by the same team: tanked wet floors, steam-proof ceilings, heat recovery ventilation and lighting that stays calm. Spa design and build for day spas, hotel spas, private members' clubs and spas in prime London homes.
Read more
A spa is a wet building inside a dry one. Each wet floor is waterproofed and water-tested ahead of the stone, the steam room gets its own vapour barrier and drainage, and the plant is sized so the relaxation room stays warm without the corridor overheating. Spa design and the services behind it are fixed together, so nothing has to be cut back on site.
How it works
How does a salon fit out run, brief to first booking?
01
Survey and brand brief
We walk the unit with you: chairs, treatments, water, power, the lease dates and the look of your brand.
02
Layout, services and programme
Layout, finishes and 3D views, one price for the whole fit-out and a programme built back from opening day.
03
Landlord, licensing, building control
Licence drawings for your landlord, your borough's planning and treatment-licence position, and Building Regulations.
04
Build, wet areas tested
Plumbing, electrics, ventilation, joinery and finishes in one sequence, every wet floor flood-tested before the finish.
05
Snag, train-in and first booking
Systems commissioned, your team shown round, zero snags and the keys back before the date.
The Craftex Guide to Beauty Salon Fit Out
Brief, layout, services, approvals and handover in one guide, with the checklist that keeps a salon, spa or barbershop project on track from lease to opening day. Free, and a short read before you sign the lease.
Our promises
Six promises, written into your contract
Not marketing lines. These are the terms we build to on every salon, spa and barbershop.
-
One team, brief to opening day
Design, plumbing, electrics, ventilation, joinery, shopfront and build under one contract and one point of contact, led by the same directors throughout.
Medusa, Knightsbridge: four floors, one contract, from concept design to handover
-
The agreed price stands
One fixed price for a written scope, with the programme written into the contract. Any change is priced and agreed in writing first.
Medusa: the design was adapted to the client's budget before a wall came down
-
Your opening date holds
The programme is built back from the day you open, with long-lead joinery, basins and lighting ordered early.
Medusa: 180 m² over four floors in 17 weeks
-
Your salon keeps trading where it can
Floors or zones phased and noisy work out of hours, so chairs stay busy while we build around them.
Drake's, Savile Row: 120 m² flagship refitted in 8 weeks on site, open throughout
-
£10M cover on every job
Public, employers' and professional indemnity cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Ready for your first client on day one
Zero snags, with the electrical, fire alarm, emergency lighting and ventilation certificates and the O&M file handed over at the keys.
Medusa: handed over with no complaints and one owner site visit during the build
Already have a quote? Send it to us. We'll beat it.
Send the quote you hold for your salon, spa or treatment floor. A director reads it line by line and replies the same working day with our figure for the same scope, plus a programme that hits your opening day.
Compare your quotes
Where do salon openings slip?
Hold any proposal up against this list. The risks are the same in every salon; who carries them is not.
| Area | The usual risk | With Craftex |
|---|---|---|
| Drainage that cannot take backwashes | Basins go in, then the drain runs the wrong way and the floor comes up again | Drainage route and falls surveyed before the layout is fixed |
| No extraction plan | Nail and colour fumes drift across the floor and the licence inspection fails | Extraction at source designed with the layout and commissioned |
| Spa tanking failing | Steam and water find a way through the wet floor into the room below | Every wet floor tanked and flood-tested before the stone goes down |
| Joinery late | Reception and retail walls arrive after the opening date | Joinery ordered from our own workshop once the layout is signed |
| Bookings taken before handover | The launch date is announced and the snag list is still open | Opening date written into the contract, zero snags at the keys |
| Five firms, no owner | A furniture supplier's designer, a plumber, an electrician and a builder, each pointing at the others | One design-and-build team answers for the whole salon, services included |
What sets the budget of a salon or spa?
Six things move the figure more than anything else. We survey each one with you and settle it in writing before you sign.
| What | What moves the budget | What we fix before you sign |
|---|---|---|
| Stations and rooms | Number of chairs, treatment rooms and spa suites | The layout and room schedule |
| Plumbing and drainage route | Backwashes, pedicure basins and showers far from the drain | A drainage survey and the route |
| Extraction and air | Nail and colour extraction, cooling and fresh air | A ventilation design for every room |
| Spa and wet areas | Saunas, steam rooms, tanking and heat | The wet-area specification |
| Joinery and finishes | Bespoke desks, retail walls, stone and lighting | Samples and drawings signed off |
| Shopfront and consents | New frontage, signage, landlord and licence conditions | The consent route and its timing |
Our salon and spa projects begin at £150,000. We usually advise a contingency of 5–10%, more in older buildings. Leasing a unit? Read about the retail fit-out in London process first.
Free cost calculator
What will your salon fit out cost?
Enter your floor area and pick a scope for an instant range at our 2026 indications. Your fixed figure follows our free survey of the water, the drainage, the power and the air in your unit.
Salon, spa and luxury retail projects
A four-floor Knightsbridge spa, a Savile Row flagship and a prime penthouse: the finish your clients see and the way we work around them.
-
Knightsbridge: spa and beauty salon Medusa: a £460K spa and beauty salon over four floors, 180 sq m, designed and built in 17 weeks. View case study
-
Savile Row: trading throughout Drake's: a 120 sq m flagship refitted in 8 weeks on site, new shopfront and bespoke joinery. View case study
-
Kensington: prime interior finish Kensington Olympia: a 400 sq m penthouse designed and refurbished in 12 weeks, the building occupied. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Beauty salon fit out: your questions
What drives the cost of a beauty salon fit out in the UK?
The number of stations and rooms, the drainage route, extraction, any spa or wet areas, the joinery and the shopfront. Our calculator gives a range at our 2026 indications. Our minimum for a salon or spa is £150,000, and we fix the figure after a free survey.
Can you refit my salon while it stays open?
Where the layout allows, yes: we phase by floor or zone and do noisy work out of hours. Drake's on Savile Row traded through all 8 weeks of works on site. Where the layout does not allow it, we fix the shortest closure in writing.
Do backwashes need new drainage?
Usually. Backwash basins need drainage with enough fall and a route to the stack. We survey the drains first and place the wash points where the water can leave without lifting the floor twice.
Do I need my landlord's consent for a salon refit?
Usually yes, through a licence for alterations, for anything beyond decoration: new partitions, plumbing, ventilation ducts or a shopfront. We prepare the drawings and method statements your landlord's surveyor asks for. See licence for alterations explained.
Do you do the plumbing, electrics, ventilation and nail-bar extraction?
Yes, under one contract: backwash drainage with the right falls, hot water, power at every station, air conditioning, extraction at source for nail and colour areas, fire and intruder alarms and CCTV. Around 60% of the labour on site is our own, so no trade waits for another.
Do you fit out barbershops, nail bars and spas as well as hair salons?
Yes. Multi-chair barbershops, nail bars with extraction at every table, spas with treatment rooms and wet areas, and hair salons from one floor to four. Clinics that need CQC registration have their own page.
How fast do you reply?
The same working day, every enquiry. A director takes the call, not a sales desk.
How long does a salon fit out take?
Medusa in Knightsbridge, 180 sq m over four floors, took 17 weeks from concept design to handover. A single-floor salon is shorter. The date is fixed in your contract. Allow time before site for landlord and borough approvals: owners under-estimate this step most often.
Can you fit out a spa with a sauna and steam room?
Yes. We design and build saunas, steam rooms, showers and relaxation rooms, with tanked and flood-tested wet floors, vapour barriers and ventilation sized for the heat.
Do I need planning permission to open a beauty salon or nail bar?
Hairdressing sits in Class E. Nail and beauty salons are treated as Class E by some boroughs and as a use of their own by others, which needs full permission. We check your borough's position before you sign and prepare a lawful development certificate or application where needed. Signage needs its own consent. See Class E use class explained.
What licences does a salon need before opening in London?
Most beauty treatments in London need a special treatment licence from the borough under the London Local Authorities Act 1991. The operator holds it, and the council must approve alterations before work starts. We build the treatment rooms, ventilation and wash points to the licence conditions. Medical treatments needing CQC registration: clinic fit-out and refurbishment.
Do you design the salon, or do I bring my own designer?
Both. Our design team takes you from brief to layout, finishes and 3D views, or we build your designer's or brand's scheme as drawn. Medusa came to us at concept stage; we completed the design and built it. Our guide to salon interior design shows what we plan first.
What do we get at handover, and do you work outside London?
A salon with zero snags and the full certificate set (electrical, fire alarm, emergency lighting, ventilation), plus the O&M file, so you can take bookings the day we leave. We work across London and the rest of the UK.
Read before you open a salon
Written from salons and spas we have built: design, consents and the lease.
-
Guide Salon Interior Design: Layout, Backwash and Spa Rooms Read the guide
-
Guide Licence to Alter: What Tenants Need Before Works Read the guide
-
Guide Landlord Fit-Out Contributions: How Tenant Incentives Really Work Read the guide
- More guides
- More case studies
- Related services
- Where we work
11 areas across London and the UK
What our clients say
See all reviews on Google-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Get your free salon survey
Send the address, the floor area and the day you need to open. We will come back to you the same working day to book your walk-round.



























