For clients with a deadline
Construction Project Planning and the Programme
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 8 min read
The short answer
Construction project planning is deciding everything that can be decided before site, so the site only has to build: scope, budget, programme, risks and approvals.
- Write the brief, the deadline and the budget before anyone draws.
- Survey the building: most surprises are already in it on day one.
- Plan backwards from the deadline, including legal notice periods.
- Price the scope unit by unit and keep contingency as a visible line.
Construction project planning is deciding everything that can be decided before work starts on site: brief, budget, programme, risks and approvals. Done well, the site only has to build.
An office move shows why. Its deadline never moves: the day the old lease ends. At Beaumont House the client had five weeks left, more than 150 staff to move, and quotes of at least 12 weeks.
We settled the survey, scope and sequence first. We were on site two weeks after the first contact and handed over the 750 m² floor three weeks later, with zero snags.
This guide walks through how our construction project management in London team plans a job and writes the construction programme, in the order it happens. It includes the UK deadlines that decide your start date. Got a deadline? Book a site visit and we'll tell you if it's achievable.
The first step in construction project planning
The first step is writing down what the project must achieve and what it may cost. Do it before anyone draws anything. In practice that's four answers:
- What is being built, and why? "New office for 120 people with room for 150" is a brief. "Refresh the office" isn't.
- When must it finish? A lease expiry, a school term or an opening date is a hard deadline. Plan backwards from it.
- What is the budget, and what's in it? Construction only, or design, fees, furniture, IT and VAT too?
- Who decides? One person with authority to sign off design and cost.
Then survey what's there. Most of the surprises that wreck a programme are already in the building on day one.
At Drake's, inside a London railway arch, nothing could be fixed into the structure. So every partition and service frame was designed to stand on its own. Finding that during design cost a drawing revision. Finding it on site would have cost weeks.
Good construction space planning starts from the same survey.
The five stages of construction project planning
The classic stages are initiation, planning, execution, monitoring and control, and closure. To outsiders, construction project management can look chaotic. But every job follows these stages. In the UK they line up with the RIBA Plan of Work 2020.
| Stage | RIBA Plan of Work 2020 | What we do at this point |
|---|---|---|
| 1. Initiation | 0 Strategic Definition, 1 Preparation and Briefing | Brief, survey and Feasibility Study before any planning application |
| 2. Planning | 2 Concept Design, 3 Spatial Coordination, 4 Technical Design | Design and consents, then Pre-Construction at RIBA Stage 4 |
| 3. Execution | 5 Manufacturing and Construction | Site works with our own labour and specialist trades |
| 4. Monitoring and control | Runs through stage 5 | Weekly programme and cost reviews, change control, inspections |
| 5. Closure | 6 Handover, 7 Use | Testing, commissioning, handover documents, aftercare |
Initiation tests the idea before money is committed. For development work, this is where a free site appraisal belongs. It's also where an owner decides who runs the scheme: see development management fees explained. For a fit-out, it's where you brief the contractor.
Planning develops the design until it can be priced unit by unit. Our Pre-Construction stage is RIBA Stage 4 technical design: detailed drawings, priced scope, programme and long-lead orders.
Execution, monitoring and closure follow. Progress and cost are checked every week. Every change gets a price and a time effect before it's approved. Our guide to what construction project management is covers this part in depth.
The UK deadlines that set your start date
A programme isn't just how long the work takes. Several legal and landlord steps have fixed notice periods. They often decide the earliest date you can start.
| Checkpoint | When it applies | Time to plan for |
|---|---|---|
| Planning permission | New build, extensions, change of use | Statutory target of 8 weeks, or 13 weeks for major development |
| Landlord's licence for alterations | Most leasehold fit-outs | Set by the landlord's surveyor; often the slowest item |
| Party wall notices | Work to a party wall or nearby excavation | 2 months for party wall work; 1 month for a new boundary wall or excavation; 14 days to respond |
| Building Regulations | Most structural, fire, services and layout changes | Approval before work; dutyholders appointed since October 2023 |
| CDM 2015 notification | Over 30 working days with 20+ workers at once, or over 500 person days | Client notifies HSE before the construction phase |
| Building Safety Regulator | Residential buildings of 18 m or 7 storeys, with 2+ homes | Approval before work starts |
Two of these catch out more clients than all the others. One is the landlord's licence on a fit-out. The other is party wall notices on anything structural. Both can be started early.
Not sure which of these apply to your building? Our construction project management team lists the consents, notice periods and lead times for your job, then builds the programme backwards from your deadline.
Work breakdown structure in project planning
A work breakdown structure (WBS) splits the project into packages. Each one is small enough to price, programme and give to one person. Instead of "fit out the office", a WBS might read:
- Strip-out and enabling works
- Partitions and ceilings
- Mechanical services: heating, cooling and ventilation
- Electrical services, lighting and data
- Fire alarm and life safety
- Joinery, kitchen and WCs
- Floor finishes and decoration
- Testing, commissioning and handover
A WBS shows the whole scope before it costs you. Each line has an owner, a duration and a cost. It's also the only honest way to compare prices. A quote with one line for "electrical installation" can't be checked against the drawings.
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Budget and programme: the two documents that run the job
The cost plan is built from the WBS and priced unit by unit. Material prices move, so it should say when its rates were checked. Our article on the rising cost of construction materials explains what's driving them. For office budgets, see office design and fit-out costs in the UK.
Contingency should match what is still unknown. Keep it as a separate, visible line, and agree who can spend it.
Design cost comes in early. Medusa in Knightsbridge came to us at RIBA Stage 2 with a concept and a few 3D visuals. The people who finished the design also priced it, so every choice was costed before it reached the wall. The four-floor salon and spa was designed and built in 17 weeks.
The critical path is the chain of activities with no slack. If one slips, the finish date slips. Long-lead items like bespoke joinery, plant and switchgear usually sit on it.
Fixed deadlines leave no float. At Beaumont House the lease date set the programme. Work back from the date. Anything that can't fit becomes a decision for the brief, not a surprise on site.
How to write a construction programme
A construction programme is the build in time order: every activity, how long it takes and what it waits for. A good one tells you the finish date and which activities can move it.
Most programmes are drawn as a Gantt chart: one bar per activity against a calendar. Build it in four passes.
- List the activities from the work breakdown structure, at a level the site can manage week by week.
- Give each one a duration from the contractor, the supplier or a comparable job, not a guess.
- Link them in order. Strip-out before first fix, first fix before plastering, plant on site before commissioning.
- Find the critical path and mark long-lead items, consents and notice periods as milestones.
| Activity | Depends on | Timing |
|---|---|---|
| Survey and strip-out | Access to the floor | Start |
| First fix services | Strip-out complete | After strip-out |
| Partitions and ceilings | First fix in the walls | Overlaps first fix by area |
| Second fix and joinery | Plastering dry | Long-lead joinery ordered at the start |
| Commissioning and snagging | Services complete | Before the handover date |
Update the programme every week against progress on site. The value is not the chart; it is seeing a slip in week three, not week twelve.
Risk: name it, price it, give it an owner
A risk register lists what could go wrong, how likely it is, what it would cost and who prevents it. The risks that hurt London projects are rarely exotic.
- Hidden conditions in existing buildings. A warehouse unit in Hackney had no natural outflow for waste water. The sink and emergency shower needed a pumped drainage system, planned before installation.
- Occupied buildings. At Portsoken House, the other floors stayed let, so we rebuilt the reception at night and at weekends.
- Late decisions. Every week a finish stays undecided is a week the programme loses later.
- Consents and notices not started early enough.
The client's legal duties in project planning
Under CDM 2015, the client must make suitable arrangements for managing the project. That includes enough time and other resources. Where there is more than one contractor, the client appoints a principal designer and a principal contractor in writing.
Our guide to CDM 2015 client duties explains each one. For the full set of duty holders and the F10 notification thresholds, see our guide to the CDM Regulations 2015.
Space planning tools and the survey behind them
A space planning tool lets architects, high-end interior designers and project managers test a layout digitally. They plan room sizes, furniture, circulation, exits and access for disabled people.
The tool is only as good as the survey behind it. A layout drawn on an inaccurate plan looks perfect until the partitions arrive. We measure first, then plan. Our office fit-out and commercial fit-out teams work from that same survey through to handover.
Plan first, then build
Construction project planning is how office design ideas and building plans turn into something finished on time. The same applies to the redevelopment projects we work on. Around 60% of our labour is in-house. Every project we have delivered has finished ahead of programme and on budget.
Choosing who to plan and build it with? Our guide to choosing the right commercial contractor lists the questions to ask. How we keep London projects on time and on budget shows the method, and our case studies show the results.
Tell us your deadline. Book a site visit and we'll tell you what has to happen, and by when, to hit it.