Luxury House Renovation and Refurbishment
Prime townhouses and country houses, rebuilt inside, quietly, by the team that drew them.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 12 weeksto redesign and refurbish a 400 sq m Kensington penthouse in an occupied block
- 0site visits our penthouse client needed to make: we ran the build end to end
- 0snags at handover
- £10Minsurance cover, ISO and CHAS, every certificate your insurer and freeholder ask for
One team for the whole house
Craftex handles luxury house renovation in London and the home counties, from the first drawing to the last certificate: structural reconfiguration, listed-building work, new services and five-star finishes under one contract. The team that designs your home prices it and builds it, so the figure and the date agreed before work starts are the ones you get.
We take on whole houses: Belgravia and Kensington townhouses, Chelsea and Hampstead period homes, country houses on estates outside London. Design, consents, our own trades and the joiners sit under one contract, so one director answers for the whole result and nothing falls between firms.
Why renovate the whole house at once?
One strip-out, one structural package, one set of services and one programme. You move out once, the house is opened up once, and every certificate arrives in one file at the end. Done in stages, the same house is opened, priced and disrupted again each time. See how we work as a design and build partner for homeowners.
Read more
A full house renovation goes further than a refurbishment. A refurbishment keeps the layout and renews the surfaces: kitchen, bathrooms, decoration, perhaps a rewire. A whole house renovation takes the building back to its structure, moves walls and stairs, replaces heating, electrics, plumbing and ventilation, and rebuilds every room to a single design. Done room by room over several years, the same work means opening the floors three or four times and paying for it each time.
On a prime house the consents decide the order of work. A listed building needs listed building consent for internal changes as well as the façade: staircases, plasterwork, panelling and room layouts. A conservation area controls what can change at the front and on the roof. Work on a shared wall, or digging near a neighbour's foundations, needs notice under the Party Wall etc. Act 1996 and often an agreed award. We settle the route at the first visit and run every application.
Home refurbishment in London also means working beside neighbours, managing agents and, in a mansion block, a freeholder's licence. Deliveries, noise hours and protection for the street are agreed before anyone arrives on site.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What does a luxury house renovation include?
Six pieces of work a prime house usually needs together, designed, built and certified by the same people, under one figure. Heating, rewiring, lighting control, ventilation, smart home and security are designed into the drawings before any plaster goes on, so nothing is chased into a finished wall later.
Whole-house refurbishment
Back to brick and forward again: structure, services, plaster, joinery and finishes on one programme.
Structural reconfiguration
Walls removed, steels in, floors and stairs moved, designed with the structural engineer and built by our own labour.
Basements, pools and cinemas
A basement conversion or a new lower floor under the house, designed within borough policy and built with the neighbours protected.
Mansard storeys and garden extensions
A principal suite under a new roof, or a glazed kitchen wing opening onto the garden. See our lofts and rear and side extensions.
Kitchens, bathrooms and joinery
Libraries, dressing rooms, panelling and the kitchen, drawn for the room and made to prime tolerances.
New-build houses
A replacement house or a new one on your plot, from planning to keys, by the team that designs it.
How it works
How does a house renovation run with us?
01
Visit and brief
We walk the house with you, read the structure, the listing and the borough, and agree what it must become and by when.
02
Design and agreed figure
Layouts, joinery and finishes signed off on drawings and samples, then one construction figure for the written scope.
03
Consents and neighbours
Planning, listed building consent, party wall notices and the freeholder's licence, run by us before work starts.
04
Build, discreetly
Our own trades, joinery and stone ordered early, noise and access controlled, a weekly report to you or your adviser.
05
Handover and aftercare
The house finished, the certificate file handed over, then a defined aftercare period while it settles.
The Craftex Guide to Residential Design and Build
What to decide before you appoint anyone for a prime house: the brief, the budget, the consents and the programme, plus the questions that separate a fixed figure from an estimate. Free, and a ten-minute read.
Our promises
Six promises, written into your contract
These go into the contract for every house we renovate.
-
One team, one contract
Design, consents, construction and joinery under one contract, and one director accountable for the whole house.
-
The agreed figure stands
Changes are priced and signed in writing before the work is done, never after.
-
Ready on the date
The programme is fixed in the contract, with long-lead joinery and stone ordered at design stage.
-
Private and discreet
No boards, no names, the street and the neighbours protected, your name and house number kept off our website.
-
Covered for your insurer and freeholder
Public and employers' liability on every job, ISO 9001, 14001 and 45001, CHAS, professional indemnity on request.
-
Every certificate, nothing left open
We leave when it is right: Building Regulations sign-off, test records and the aftercare dates in writing.
Already have a quote? Send it to us. We'll beat it.
Have an estimate or a tender for your house from another builder? Send it to us. A director reads it line by line and comes back with where we would beat it on the same scope.
Compare your quotes
Where do London home renovations overrun?
Hold any proposal against these six points. Each risk exists on every house; what matters is who carries it. Most overruns on a prime house start where one firm hands over to the next: designer to engineer, engineer to builder, builder to joiner. Under one contract those hand-offs happen on one programme, and nobody can blame the drawings.
| Area | The usual risk | With Craftex |
|---|---|---|
| Responsibility | Architect, engineer and builder on separate contracts, each blaming the gap in the drawings on the last | Everyone who touches your house answers to one contract and one director |
| The final bill | An estimate that grows once the walls and floors are open | The house surveyed before pricing; extras priced and signed before they happen |
| Consents | Work started before listed building consent or a party wall award, then stopped | Every consent and award in place before the strip-out |
| The date | Joinery ordered late, so "six months" becomes a year | Long-lead items ordered at design stage and the date written into the contract |
| Privacy | Skips, shouting and a street that knows your business | Deliveries, noise hours and access agreed with neighbours and managing agents first |
| Handover | Moving into a snag list with no paperwork | Nothing outstanding; certificates, manuals and warranties in one file |
What sets the budget of a house renovation?
Six things move the budget of a prime house more than anything else. We settle each one in writing before you sign, so the contract figure is the one you pay.
| Decision | What moves the budget | What we fix before you sign |
|---|---|---|
| Structure and steels | Walls removed, stairs moved, floors levelled or strengthened | An engineer's survey and a structural package drawn before pricing |
| Basement or extension | Excavation, underpinning, a new storey or a glazed wing | The scope, the borough policy and the ground investigation |
| Services | Heating, electrics, ventilation, lighting control, smart home | A services design drawn with the layout, not after it |
| Finishes and joinery | Stone, timber, ironmongery, bespoke cabinetry | Finishes signed off from real samples, joinery drawn and scheduled |
| Listed or conservation status | Consent conditions, specialist trades, approved materials | The consent route and the conditions known before the price |
| Access and neighbours | Narrow streets, shared walls, managed buildings, working hours | Party wall awards, a logistics plan and the agreed working hours |
Design fees, VAT, furniture and art are agreed separately. We usually advise a contingency of 5–10%, depending on how much of the structure is hidden until the house is opened. The full picture of costs is in how much it costs to renovate a house in London.
Free cost calculator
What will your home cost to renovate or build?
Enter the floor area and pick a tier for an instant range at our 2026 rates.
House renovation across prime London
Kensington, Chelsea, Knightsbridge and Belgravia. Stucco terraces, garden squares and mansion flats, often listed or in a conservation area, with neighbours on every side. Our Herbert Crescent home in Knightsbridge and the penthouse at Kensington Olympia were both built beside people at home. We work across Kensington, Chelsea and Belgravia.
Hampstead, Highgate, Richmond and the country. Larger Victorian and Edwardian houses, Georgian villas and estate houses in the home counties, where a renovation usually means new services, a reworked plan and space below or above. We renovate in Hampstead, Highgate, Islington, Richmond and Surrey.
Read more
Comparing renovation companies in London, or house renovation companies for a Victorian house in north London? We also work in Notting Hill, Holland Park, South Kensington, Mayfair, Marylebone, St John's Wood, Primrose Hill, Regent's Park, Fulham, Barnes, Chiswick and Wimbledon. Victorian house renovation in London usually means rebuilding the rear, correcting old structural alterations, and replacing services that run through original floors and cornices.
London homes we have renovated
Three prime homes our team designed and built, each with people living on the other side of the wall.
-
Herbert Crescent, Knightsbridge A 450 m² private residence refurbished in 32 weeks: a £1.5M project with bespoke joinery, built quietly beside its neighbours. View case study
-
Kensington Olympia, London A 400 sq m penthouse designed and refurbished as main contractor while every other flat in the block stayed lived in. View case study
-
Pan Peninsula, Canary Wharf A 290 sq m penthouse rebuilt in 10 weeks with residents at home, on time and within budget. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
House renovation in London: your questions
Do you renovate the whole house or single rooms?
Whole houses. Our work is full house renovation and refurbishment of prime homes, where structure, services and finishes are done together. A single kitchen, bathroom or small extension is better served by a local builder, and we say so on the first call.
Can we stay in the house while you work?
For a refurbishment that keeps the layout, often yes: we phase the house floor by floor and seal the working zone. For a back-to-brick renovation with new services, most clients move out for the structural stage. We tell you honestly at the first visit which one yours is.
How long does a full house renovation take?
It depends on the size, the structure and the consents. Herbert Crescent, a 450 m² Knightsbridge home, was finished in 32 weeks. Your date is set after the survey and written into the contract.
What drives the cost of a house renovation?
Mainly the structural work, any basement or extension, the services, the finishes and joinery, the listing and the access. Our renovation cost calculator gives a first range, and our guide to house renovation costs explains each driver.
Do you work outside prime central London?
Yes. London is our base, and we also take on country houses and estate homes in the home counties, with the same directors running the job.
Can you add a basement during the renovation?
Yes, where the borough allows it. Kensington and Chelsea, for example, limits most new basements to one storey. A basement needs a structural engineer, a ground investigation and party wall awards, so we design it with the rest of the house and build it in the same programme.
Who deals with planning, listed building consent and party walls?
We do. We check the route at the first visit, prepare the planning and listed building consent applications with the heritage statement, serve the party wall notices and keep every award in your file.
Do you build new houses as well?
Yes. As house builders in London and the home counties, our design team takes a plot or a replacement house through planning and our construction team builds it, with the same director from the first drawing to the keys.
Can you add a mansard or rear extension in the same project?
Yes, and doing it with the renovation means the house is opened up only once. A new mansard storey or a glazed garden extension is designed with the rest of the house and built on the same programme.
How fast do you reply?
Within one hour, Monday to Saturday, 8am to 6pm. Send the address, a few photos and what you want the house to become, and a director comes back to you.
Read before you renovate
Written from homes we have rebuilt: what it costs, what needs consent, how to fund it.
-
Guide House Renovation Cost in London: What Decides It Read the guide
-
Guide Buying a Property to Renovate in London: Where to Find One, What It Costs and What to Check Read the guide
-
Guide House Extension Cost in London: What Drives It Read the guide
- More guides
- Reduced VAT on empty-home refurbishment
- Loft conversion cost in London
- Basement conversion cost in London
- Basement builders in London
- High-end builders in London
- Renovation mortgages and refurbishment loans
- Permitted development extension rules
- Choosing a house extension architect
- How much luxury home design costs
- Luxury home planning mistakes
- Luxury vs modern home architecture
- More case studies
What our clients say
See all reviews on Google-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified



























