Construction Project Management Services
Your scheme's programme, cost plan and contractors held to account by people who build.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 750 sq mof offices refurbished in three weeks, with five weeks left on the old lease
- 0days the other floors stopped work while 1,550 sq m was rebuilt around them
- 0snags at handover, every certificate in the file
- £10Minsurance cover, ISO and CHAS, every accreditation your lender or landlord asks for
Directors on the client's side of the table
Craftex provides construction project management services for schemes of £5M and more in London and the UK: programme, cost plan, tender, site control and handover, run on the client's side. Our directors have built what they now manage, so they see a slipping programme or an inflated variation before it reaches your budget.
We take on large commercial and prime residential schemes: Grade-A office buildings, hotels, whole-building repositioning, prime residential developments and the largest private houses. One director takes the scheme off your desk and answers to you, your fund or your board for two things: the date and the number. Because we have built schemes ourselves, our cost plans start from what trades really charge, not from a benchmark.
When does a £5M+ scheme need a project manager?
When a funder reports on every drawdown, a dozen packages have to meet on one programme, or an opening date is already announced. At that size one accountable team on the client's side costs less than the drift it prevents: a month of finance, a lost pre-let or a hotel that opens a season late.
Read more
Three appointments are often confused. A project manager runs the whole scheme for the client: brief, programme, cost, design team, procurement, approvals and handover. An employer's agent administers a design and build contract on the client's behalf: it checks the contractor's design against the employer's requirements, values the work and certifies payment (our development management team holds that role; see what an employer's agent does). A contract administrator does the same job under a traditional JCT contract, issuing instructions and certificates. On a large scheme the roles can sit with one firm or with three; what matters is that one person answers for the date and the number.
Client-side project management means the project manager is appointed by, paid by and reports to the client, never the contractor. The APM and the RICS both publish guidance on the role; an RICS-qualified quantity surveyor on our team runs the cost plan and the valuations. Under the NEC4 Engineering and Construction Contract the project manager is a named role with powers to accept the programme, assess compensation events and issue instructions; under JCT the same functions are split between the employer's agent or contract administrator and the client. We work under either form, with the amendments your funder's solicitors require.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do our project management services cover?
Six workstreams under one appointment, run by the same directors from the first review to the handover file, so nothing falls between consultants.
Programme and critical path
A critical-path programme built from real lead times, approvals and sequencing, tracked every week against the date your fund or board has set.
Cost plan and change control
A cost plan built from real subcontract prices, tested before tender. Every change is priced and agreed in writing before the work starts.
Procurement and tender
The procurement route chosen for your scheme, packages tendered and compared like for like, and the contract set so nothing is left as a provisional sum.
Site control and weekly reporting
A named director walks the site every week and reports progress, cost to complete and risks on one page.
Approvals, CDM client support and licences
Building Regulations, CDM 2015 and Part 2A duties, planning conditions and the landlord's licence for alterations, run for you.
Lender reporting and handover
The monthly pack your monitoring surveyor expects, then zero snags and a complete handover file for the lender, valuer and insurer.
How it works
How do we run your project week by week?
01
Project review
A director visits the site, reads the brief, the appraisal and the dates, and tells you where the risks sit. No charge.
02
Pre-construction
Programme, cost plan, procurement route and approvals strategy agreed before anything is committed, so the figure you sign is the figure the lender sees.
03
Team and tender
We coordinate the design team, tender the packages, compare the returns line by line and settle the contract.
04
Delivery
Weekly director site walks, a one-page cost and progress report, decisions made the day they are needed, works phased around tenants and operations.
05
Handover and aftercare
Zero snags, every certificate and manual in one file, then we stay on hand for the next phase.
The Craftex Guide to Investor and Developer Projects
What a client-side project manager should give you at every stage of a large scheme: the questions to ask before you appoint, the duties that stay with you as the client, and the reports to insist on from the first month to practical completion.
Our promises
Six promises, written into your contract
-
A director runs it, not a junior
The director who signs the appointment walks your site every week and answers to you alone.
Joe Crawford, Operations Director, 37 years, projects up to £135M in previous roles.
-
Ahead of the date you need
Every project we have delivered finished ahead of programme.
Beaumont House, on site two weeks after the first call and finished in three, inside the old lease.
-
The number you sign is the number you pay
Cost plans from real subcontract prices; changes priced in writing before the work, never after.
100% of projects on budget.
-
Your building keeps trading
Works are phased around tenants, staff and operations.
Portsoken House, 1,550 sq m over seven months while every other floor stayed leased and at work.
-
£10M cover and every accreditation
£10M public and employers' liability, ISO 9001, 14001 and 45001, CHAS and SafeContractor.
what your lender, landlord and insurer ask for, already in place.
-
Zero snags, every certificate
Handover means a clean building and a complete file.
Kensington Olympia, a 400 sq m penthouse handed over in 12 weeks without a single snag.
Already have a quote? Send it to us. We'll beat it.
Holding a project management fee proposal from a consultancy, or a contractor's price for the build? Send it to us. A director reads the scope line by line and comes back to you the same working day with where we would beat it.
Compare your quotes
Where do large construction projects drift?
Hold any project management proposal against these six points. On a large scheme the risks are known in advance; what differs is who sees them first and who carries them.
| Area | The usual risk | With Craftex |
|---|---|---|
| Responsibility | A partner sells the appointment, a junior runs it, and the contractor runs the junior | A director who has built schemes this size runs yours and walks the site every week |
| The final bill | A benchmark cost plan, then the real prices after the board has signed | A cost plan from real subcontract prices, and no change started until its price is agreed in writing |
| The date | The contractor's tender programme accepted as the programme | A critical-path programme we build ourselves, with lead times and approvals in it, tracked weekly |
| Disruption | Tenants on the other floors find out about the works when the noise starts | Phased floors, night and weekend shifts and protected routes agreed before anyone mobilises |
| Compliance | Approvals, CDM and Part 2A duties and the landlord's licence found missing at the end | Every approval, duty and certificate needed to occupy, insure, value and fund the building, run by us |
| Handover | A snag list that drags for months and a file the lender will not accept | Zero snags on the day and a complete handover file, the lender's pack included |
What does the project manager do at each stage?
Five stages on schemes from £5M, each with something in writing you can hold us to. The fee is agreed per project after the brief, for the stages you need.
| Stage | What we do | What you receive |
|---|---|---|
| Brief | Read the appraisal, the site and the dates; test the budget against the scope | A written risk review and a recommended procurement route |
| Pre-construction | Build the programme and the cost plan, set the approvals strategy | A critical-path programme, a cost plan from real prices and a risk register |
| Tender | Tender the packages, level the returns, negotiate and set the contract | A tender report and a contract sum you can take to your funder |
| Delivery | Walk the site weekly, control change, report to you and the lender | A monthly report: progress, cost to complete, variations and the drawdown recommendation |
| Handover | Commission, snag and certify, then compile the file | Zero snags, completion certificates, O&M manuals, as-built drawings and the health and safety file |
Construction project management in London and the UK
London. London is our base and where most of our work sits: offices in the City and Aldgate, prime homes in Kensington and Knightsbridge. We plan around the borough's logistics rules and the neighbours from the first week, and we fitted out 1,550 sq m at Portsoken House while the rest of the building stayed at work.
The UK. Funds, developers and institutions bring us schemes outside London when they want the same directors on site. We run the programme, the cost plan and the reporting from London and walk the site every week wherever it is.
Read more
Comparing construction management companies, or a project management construction company against a consultancy? Ask who will run the job week to week and whether they have built a scheme of your size. Construction management places a manager over trade contracts that you hold directly, usually for a fee; project management runs the whole scheme for you; main contracting gives one contractor the whole build and the price risk. Construction planning services sit inside all three: the programme, the logistics plan and the sequence of packages. For a city-centre site we also prepare the construction logistics plan the borough asks for.
Projects our directors have run
A Craftex project plus our Development Director's earlier roles. Portsoken House is ours; Rob Barton worked on Grosvenor Waterside and Blackwall Reach in previous roles, before he joined Craftex, and they show the scale our team has run.
-
Craftex: Aldgate, London Portsoken House: 1,550 sq m of premium Aldgate offices, a full fit-out from scratch in seven months, with the rest of the building let. View case study
-
Rob Barton's earlier role: Chelsea Bridge Grosvenor Waterside: Thames-side homes around the restored Grosvenor Canal basin, developed by St James (Berkeley Group). View case study
-
Rob Barton's earlier role: Poplar Blackwall Reach Phase 2: 268 homes delivered within a 1,575-home regeneration beside Robin Hood Gardens. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Construction project management services: your questions
What do construction project management services include?
Programme, cost plan, procurement and tender, weekly site control, approvals and CDM client support, lender reporting and the handover file, all on the client's side. You can appoint us for every stage or only the ones you need.
Are you the employer's agent or the project manager?
On most appointments, the project manager. Where a design and build contract needs an employer's agent, our development management team takes that role, so the two are never split between firms that blame each other.
How do you control cost and variations?
No variation goes ahead until its price is signed off in writing, and the cost to complete is reported every month. We usually advise a contingency of 5–10%, set by how much of the risk is still hidden; see how much contingency a construction project needs.
How is your fee set?
We set it scheme by scheme once we have read the brief, based on the stages and the time on site you need. We do not publish fees; a director gives you a written fee after the free project review.
What is construction project management, in short?
Running a building project for the client from brief to handover: programme, cost, design team, procurement, site and approvals, so a single accountable lead owns the programme and the budget. Our guide to what construction project management is sets out the stages in detail.
What size of scheme do you manage?
Schemes from £5M to £20M and above, commercial or residential: office and hotel buildings, repositioning projects and prime homes. Below that, a director-led team is rarely worth its fee, and our design and build service is the better fit.
Can you take over a project already on site?
Yes. We start with a review of the programme, the cost to complete and the contract position, then report to you in writing what can be recovered and how. If the contractor is the problem, we say so in writing.
Do you report to our lender or fund?
Yes. Your monitoring surveyor receives a cost plan with real prices, a critical-path programme, the contract and insurances, and a monthly report in the format they use: progress, cost to complete, variations, risks and the drawdown recommendation.
Do you manage projects outside London?
Yes, for schemes of the right size. London is our base and most of our work, and we run schemes elsewhere in the UK with the same directors walking the site every week.
How fast do you reply?
The same working day. Send us the site address, your brief and your target dates, and a director replies.
Read before you appoint a project manager
From schemes we have run: the role, the programme and the contingency.
-
Guide What Is Construction Project Management? Read the guide
-
Guide Construction Project Planning and the Programme Read the guide
-
Guide How Much Contingency Should a Construction Project Have? A Guide by Stage Read the guide
- More guides
- How to choose a construction project management company
- Keeping construction projects on time and on budget
- Why construction projects go over budget
- Variations in construction contracts
- Construction logistics plans in London
- The construction adjudication process
- What an employer's agent does
- Design and build
- More case studies
What our clients say
See all reviews on Google-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Tell us about your scheme
Send the address, the brief, the appraisal if you have one and the dates you are working to. A director will review them and we will come back to you the same working day.