SERVICES
OFFICES & WORKSPACES
WAREHOUSING & INDUSTRIAL
CONVERSIONS & REDEVELOPMENT
RESIDENTIAL PROJECTS
HOSPITALITY & LEISURE
DATA CENTER & TECH INFRASTRUCTURE
RENEWABLE ENERGY
INVESTOR & DEVELOPER SERVICES
PROJECT MANAGEMENT SERVICES
SERVICES
LOCATIONS
WAREHOUSE REFURBISHMENT
RESTAURANT & HOSPITALITY
COMMERCIAL FIT-OUT
OFFICE FIT-OUT
LOCATIONS
white background

Leading Office Fit Out Contractors in London

An office is where ideas grow and dreams thrive, with walls and furniture supporting that vision. Craftex Design & Construction are trusted fit out contractors in London, delivering workspaces that blend style, function, and your brand.

Trusted by Leading Businesses

Got a Quote? We’ll Beat It.
Send us any like-for-like quote — we’ll do it faster, better, and at a sharper price.

Specialists in Commercial Fit Out & Refurbishment

Craftex Design & Construction helps businesses turn empty or outdated spaces into smart, high-performing workplaces. Our complete fit out and refurbishment services are built around one goal, improving how your teams work while maximising every square foot. Each project is planned to reduce downtime, improve efficiency, and deliver real business value.
  • Office Design

    Office Design & Planning

    We design workspaces that improve how people work, not just how they look. Every layout we plan is focused on better workflow, higher productivity, and smarter space use, so your office operates efficiently and feels comfortable for your team.

  • CAT A & B Fit-Out

    CAT A & B Fit-Out

    From Cat A infrastructure to Cat B finishes, we cover every level of your office fit out. Our team delivers everything, including ceilings, lighting, flooring, and furniture – with precision and speed. The result: a ready-to-move-in workspace that meets regulations, performs reliably, and fits your budget.

  • Commercial Refurbishment

    Commercial Refurbishment

    Getting tired of an outdated office is common, so we refresh and rebuild old spaces into modern, welcoming workplaces. As trusted office refurbishment contractors in London, we turn dull setups into vibrant spaces.
  • Smart Space Optimization

    Smart Space Optimization

    Do you expect something more from your office space? Don’t worry, we are here to exceed your expectations with our smart storage, racking, and mezzanine solutions, keeping your workplace organised always.

  • Fire Strategy & Compliance

    Fire Strategy & Compliance

    Safety is something that cannot be overlooked. Each office fit out meets strict building and fire safety standards. This is what gives our clients peace of mind from day one and confidence that their workspace is built to last.
  • Sustainability & Energy Efficiency

    Sustainability & Energy Efficiency

    Craftex is a freeman believer that good design shouldn’t cost the earth. That is why we focus on energy efficiency and sustainable materials. This makes your office greener and your bills lighter.

How Craftex Delivers Your Fit Out

Free Office Fit-Out Guide & Checklist

Plan your London office design with ease. Get a simple checklist covering budget, timelines, design, and compliance—helping you avoid mistakes and stay on track

Case studies

  • Portsoken House Reception I Aldgate London
    View case study
  • Beaumont House I West Kensington, London
    View case study
  • Medusa - Beauchamp Place I Knightsbridge, London
    View case study
  • Banbury Warehouse I Oxfordshire
    View case study

Why 150+ Businesses Chose Craftex and Keep Coming Back?

Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Independently Certified Contractor for Quality, Safety & Reliability

Frequently Asked Questions

Interior fit out (sometimes called interior finishing) is the process of equipping a building's interior with the systems, fixtures and finishes that allow it to be used. This includes the walls, ceilings, floors, windows, doors, lighting, plumbing and electrical systems, as well as finishes such as paint, wallpaper, carpeting and cabinets.