Skip to content
Request a callbackCallback
Luxury restaurant dining room with velvet lounge seating, marble tables, brass chandeliers and a patterned stone floor

Restaurant, Bar & Pub Fit Out

Dining rooms, bars and kitchens built to your opening night.

Our track record

100% of projects delivered ahead
of programme and on budget

What our clients get

  • 8 weekson site, after 4 weeks of design, to refit a 120 sq m Savile Row flagship at Drake's, open throughout
  • 4 weeksto strip out and rebuild an 83 sq m restaurant, ready to open
  • 10 weeksto refurbish a 300 sq m London pub and hand it back ready to trade
  • £10Minsurance cover, ISO and CHAS, every accreditation the work needs

One team from first layout to opening night

Craftex handles restaurant fit out in London from the first layout to opening night: dining room, bar, kitchen, extract and bespoke joinery under one contract. The team that designs your venue builds it, so the opening date you announce is the one you open on.

We build for owners and operators of prime London venues: fine-dining rooms, hotel restaurants and bars, private members' clubs and landmark pubs. Design, kitchen, M&E and joinery answer to one director, so nothing falls between a designer, a kitchen supplier and a builder, and the room you approve on paper is the room your guests walk into.

Restaurant dining room with timber slatted walls, upholstered banquettes, oak tables and warm pendant lights

Why does the opening date decide a hospitality fit out?

Dark restaurant dining room looking towards a lit kitchen pass with brass pendant lights and a chef at work

Every week late is covers you never sell, a brigade paid to wait and launch spend that runs dry before the doors open. So we programme back from the opening night: kitchen equipment and extract ordered first, licence and landlord drawings run alongside the design, and the last week kept for training, not trades. See how we work as a fit-out and construction partner for businesses.

Read more

A restaurant or café moving into a unit already in Class E use usually needs no planning permission for the use itself. A bar or pub sits outside the use classes (sui generis), so opening one needs a planning application, and so do external extract ducts and roof plant. Selling alcohol, or serving hot food or drink between 11pm and 5am, needs a premises licence under the Licensing Act 2003, and the plan you submit must match the room we build.

Extract is where most openings slip. Councils usually ask for an odour and noise assessment with the application, and the duct route has to work for the kitchen, the landlord and the neighbours at once. We draw the route with the first kitchen layout, so the application goes in with the design rather than after it. At lease end the same duct and plant often have to come out again, which is the core of restaurant dilapidations.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does a restaurant or bar fit out include?

Six parts of one venue, one contract and one team accountable for all of them, from the first drawing to the first service. Also under the same contract: shopfronts and signage, washrooms, mechanical and electrical integration, and the drawings your landlord, planning and licensing applications need.

Panelled dining hall with crystal chandeliers and white-clothed tables

Dining rooms and front of house

Seating plans, banquettes, lighting scenes and finishes chosen to hold up to a full service, night after night.

Dimly lit luxury lounge bar with red velvet chairs and brass pendants

Bars, back bars and serveries

Bar fit out from the front panel to the back bar, cellar lines and display joinery, made in-house for the room.

Commercial kitchen with stainless steel dishwashing line, canopy and racking

Kitchens, extract and cold rooms

Canopy, extract and odour control, the gas safety interlock, walk-in cold rooms and wipe-clean finishes, planned with your head chef.

Traditional pub interior with a lit open fire, timber bar, stools and a red rug

Pubs and period buildings

Pub refurbishment that keeps the character: servery, fabric, steelwork, floors and roofs brought up to today's trade.

Marble-topped café counter with glass cake domes, a fluted navy front and brass pendant lights

Cafés and all-day venues

Cafe fit out for all-day rooms in prime buildings: marble counters, coffee stations and seating that turns from breakfast to dinner.

Restaurant interior with exposed ventilation ductwork and pendant lighting

M&E, acoustics and lighting

Fresh air, comfort cooling, kitchen make-up air, three-phase power, acoustic treatment and lighting control, commissioned with the build.

How it works

How does a venue fit out run with us?

01

Site and concept

We walk the site with you and your chef: covers, menu, the kitchen and extract route, and the date you must open.

02

Design, kitchen layout and fixed programme

Room, bar, kitchen and finishes drawn up, one agreed price, and a programme set back from opening night.

03

Licence, planning and landlord

Licence plans, planning where the extract or the use needs it, the landlord's licence for alterations and the fire strategy.

04

Build, often nights

Structure, services, kitchen, bar and finishes in one sequence, nights and weekends where neighbours trade, around 60% with our own labour.

05

Snag, train-in and opening night

Gas, extract, fire and electrics tested and certified, zero snags, and days left for your team to train in the room.

Cover of the free Craftex Guide to Restaurant, Bar and Pub Fit-Out

The Craftex Guide to Restaurant, Bar and Pub Fit Out

Planning, design, build and compliance in one guide, with the practical checklist that keeps a restaurant, bar or pub project on track from brief to opening night. Free, and written from venues we have opened.

Our promises

Six promises, written into your contract

Not marketing lines. These are the terms we build to on every restaurant, bar and pub.

  1. One team, brief to opening night

    Design, kitchen, extract, bar and build under one contract and one point of contact, led by the same directors throughout.

    Drake's, Savile Row: 120 m² flagship refitted in 8 weeks on site, open throughout

  2. The agreed price stands

    A fixed lump sum for a written scope, with the programme written into the contract. Any change is priced and agreed in writing first.

  3. Your opening date holds

    The programme is built back from the night you open, with long-lead kitchen items ordered early.

    Medusa, Knightsbridge: four floors of spa and salon, designed and built in 17 weeks.

  4. Built faster, with our own trades

    Around 60% of the labour on site is ours, including the joinery, so no week is lost waiting for a subcontractor.

    Kensington Olympia: 400 sq m refurbished in 12 weeks, as main contractor.

  5. £10M cover on every job

    Public, employers' and professional indemnity cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.

  6. Ready to trade on day one

    Zero snags, with the gas, electrical, fire and extract certificates and the health and safety file handed over at the keys.

Example restaurant, bar and pub fit-out quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Send us the quote you hold for the venue. A director checks it line by line against the room, the kitchen and your opening date, and a director replies with a better figure for the same scope.

Compare your quotes

Where do restaurant openings slip?

Hold any quote up against this list. The risks are the same on every opening; who carries them is not.

AreaThe usual riskWith Craftex
Extract consentDuct route and odour report left until the design is done, then planning asks for changesExtract route, odour control and noise assessed at the first layout and submitted alongside the scheme
Kitchen equipmentCombi ovens, refrigeration and the canopy ordered once the build starts, then weeks of waitingLong-lead kitchen items ordered as soon as the layout is signed, on the programme from day one
Licence conditionsCapacity, exits or hours conditions found after the room is builtLicence plans drawn from the drawings we build from, conditions designed in before work starts
Landlord and shellLandlord's works, supplies or the licence for alterations not ready when the trades arriveLandlord's surveyor given the drawings early; supplies and shell checked on our first visit
One answerable partyDesign studio, kitchen firm and builder on separate contracts, each blaming the othersOne design-and-build team answers for the whole venue, kitchen included
Opening weekA snag list still open while the team trains and the first tables are bookedZero snags at handover and the certificate file complete before the first booking

What sets the budget of a restaurant or bar?

Six things move the figure for a venue more than anything else. We survey each one and settle it in writing before you sign, so the contract sum is the one you pay.

WhatWhat moves the budgetWhat we fix before you sign
Condition of the shellFloors, ceilings, drainage and incoming supplies; what the landlord hands overA survey of the shell and the landlord's works schedule
Kitchen and extract routeSize of the kitchen, the canopy, the duct run to roof level, odour controlThe kitchen layout with your chef and the extract route agreed with the landlord
Bar and back-bar joineryLength of the bar, stone and metalwork, back-bar display, cellar linesJoinery drawings and samples signed off
M&E and acousticsFresh air and cooling for a full room, power, lighting control, sound to neighboursM&E design sized to covers and an acoustic strategy
Listed or period buildingConsent for alterations, original features kept, hidden defects in old fabricThe consent route and an opening-up survey
Trading neighbours and accessNight and weekend working, deliveries, protection of residents and shops next doorWorking hours, access and a logistics plan agreed

We take on venue fit outs from £100,000 to £10M and above in construction value, and usually advise a contingency of 5–10%, depending on the building. What drives the figure in detail: restaurant and hospitality fit-out in London.

Free cost calculator

What will your restaurant or bar fit out cost?

Enter your floor area and pick a scope for an instant range at our 2026 rates. Add a commercial kitchen if the venue needs one.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT, fees and loose furniture, for a sound building with services available. Excludes external ductwork and structural openings. Your fixed figure comes after a survey.

Restaurant and bar fit out across London

Period dining salon with white tablecloths, panelled walls and a marble fireplace

Chelsea, Mayfair and Knightsbridge. Fine-dining rooms, hotel bars and private members' clubs in period buildings, where the finish is the brand and the neighbours are residents. Our team delivered Sloane Place in Chelsea, a boutique hotel with its cocktail bar.

Victorian London pub front lit at night with diners at outdoor tables and people walking past

Covent Garden, Soho and the City. Destination restaurants and landmark pubs that trade seven days a week, with deliveries, extract and noise managed around busy streets. The Gloucester Arms, a traditional London pub, was refurbished and reopened by Craftex.

Read more

Restaurant fit out London, bar refurbishment and restaurant refurbishment run with the same team across the capital, including Mayfair, Westminster, Victoria, Marylebone, Chelsea, Knightsbridge, Kensington, Notting Hill, Islington, Hampstead, Canary Wharf and Richmond, and beyond into Surrey, Brighton, Oxford and the rest of the UK. Outside London we have pages for restaurant fit-outs in Glasgow, restaurant and hospitality fit-outs in Leicester and Birmingham. Local page: restaurant fit-out in Victoria.

Hospitality fit out contractors for bars, pubs and restaurants

Contemporary bar with an arched back bar of lit shelves set into travertine walls, a stone-topped counter and a softly lit front

A bar built for the busiest hour

In a bar and restaurant fit out, the bar is usually where the margin is made. We lay out the back bar, ice, glass washing and stock from how your team serves, so nobody crosses a colleague to pour a drink. The counter, foot rail and lighting are drawn and built as one piece of joinery.

Restaurant dining room laid for service, with lit oak shelving, long tables and a back-lit bar at the far end

Restaurant refurbishment for a venue that already trades

A refurbishment starts with what is already there. We survey the kitchen, extract and services before the price is fixed, so a tired duct or an undersized gas supply is found on paper, not after the walls are open. The Gloucester Arms, a traditional London pub of 300 sq m, was refurbished and handed back ready to trade.

Three questions for any hospitality fit out contractor

Owners comparing restaurant fit out contractors in London tend to ask the same three things. Who carries the kitchen and the extract? Who draws the planning and licensing plans? Is the opening date written into the contract? We put all three under one appointment, with one director answering for the date. For a longer shortlist, see how to compare restaurant fit out companies in London.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Restaurant and bar fit out: your questions

Do you design the restaurant as well as build it?

Yes. Our in-house designers plan the room, bar and kitchen with you and your chef, and the same team prices and builds it, so the scheme you approve is the one you can afford. For the look and the materials, see our guide to restaurant design.

How long does a restaurant or bar fit-out take?

It depends on size, the kitchen and the approvals: from a few weeks for a single dining room to several months for a hotel restaurant and bar. Sloane Place, a 27-key Chelsea hotel with its cocktail bar that our team delivered, ran 28 weeks. Long-lead kitchen equipment and licence decisions often set the start date.

Can you refurbish a pub, bar or restaurant while it stays open?

Where the layout allows, yes: we phase the areas and do noisy work out of hours. Drake's on Savile Row traded through its 8 weeks on site.

Do I need planning permission for a restaurant or bar fit-out?

A restaurant or café moving into a shop or office within Class E usually does not need permission for the use. A change to a bar or pub, external ductwork or roof plant usually does. We prepare the drawings the application needs.

What registrations and approvals are needed before we open?

Food-business registration at least 28 days before trading, a premises licence if you sell alcohol or serve hot food late at night, and building control sign-off. We build to the plans those applications use and hand over the certificates behind them.

What do we get at handover?

A venue with zero snags, the gas, electrical, fire alarm and emergency lighting certificates, the extract commissioning record and the health and safety file, so you can open the day we leave.

Can you fit out a hotel bar or restaurant?

Yes, when the bar or the restaurant is the job: the back bar, the dining room and the kitchen behind them, built to the hotel's own standards and hours. For bedrooms, corridors and a whole building, see hotel refurbishment.

How fast do you reply?

Within one hour, Monday to Saturday, 8am to 6pm, every enquiry. A director takes the call, not a sales desk.

How much does a restaurant fit out cost in London?

It depends on the shell you take on, the kitchen and the extract route, the bar joinery and the finish. Our calculator gives a range at our 2026 rates, and our restaurant fit out cost guide explains each driver. Send us the plan and your opening date for a fixed figure.

Do you design and build the commercial kitchen, extract and gas?

Yes. We plan the kitchen with you and your chef, then install the canopy and extract, the gas with its interlock, drainage, cold rooms and hygienic finishes under the same contract. Details: restaurant kitchen fit-out.

Do you fit out bars and pubs as well as restaurants?

Yes. Bar fit out, pub refurbishment and cocktail bars in hotels and members' clubs are the same service: the back bar, cellar lines, servery and joinery are built by the team that builds the dining room.

Do I need my landlord's consent?

Usually yes, through a licence for alterations. We prepare the drawings and specifications your landlord's surveyor asks for. See licence for alterations explained.

Can you refurbish a listed or period pub?

Yes. We survey the fabric first, keep the features that make the house, and prepare the drawings for listed building consent where the works affect its character. New joinery is matched to the original.

What size of projects do you take on, and outside London?

Projects from £100,000 to £10M+, mostly in central London, and across the rest of the UK for the right venue.

Can you build in accessibility and sustainability?

Yes, from the first layout. The Equality Act 2010 expects venues to make reasonable adjustments, and Building Regulations Part M covers much of the work, so step-free routes and accessible toilets are drawn in early. We keep what still works, specify efficient extract, lighting and refrigeration, and run our sites under ISO 14001.

What our clients say

See all reviews on Google
  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us