Dilapidations, Cat A and MEES Works
Lease-end floors stripped, reinstated and re-let ready, on your date.
Our own trades
60% of the labour on siteis our own team
Lease-end and landlord floors we have delivered
- 3 weeksto rebuild 750 sq m at Beaumont House, with five weeks left on the client's old lease
- 1,550 sq mof offices built at Portsoken House with the other tenants at work
- 0snags at handover
- £10Mpublic and employers' liability cover on every job
One contract from the schedule to a floor that lets
Craftex carries out dilapidation works and reinstatement works for London landlords and outgoing tenants: strip-out, Cat A reinstatement, repairs from the schedule and the MEES upgrades a floor needs to let. As your dilapidations contractor, with our in-house RICS-qualified quantity surveyor, we prepare or cost the schedule, agree the scope with the tenant's side and hand back a floor that lets, on the date in the lease.
A floor that comes back at lease end earns nothing until it is let again, and every void month carries the rates and the service charge. We price the surveyor's schedule, run the strip-out, reinstatement and energy works as one job, and hand the floor to your letting agent ready for viewings.
We work for owners of prime mansion blocks, large residential and mixed-use buildings, and commercial landlords with whole floors in the City and the West End. In a multi-let building we plan every noisy hour around the occupiers who stay.
Do the works, or pay the claim?
A landlord's damages for disrepair are capped by law at the loss in value of the reversion, so a schedule is a starting position, not a bill. A builder's costing of each line lets both sides settle on real numbers, and works finished before the term ends save the landlord void months after it. See how we work as a construction partner for landlords and managing agents.
Read more
A terminal schedule of dilapidations is served near or after the end of the lease; an interim schedule is served while the lease still runs. Repair, redecoration and reinstatement are separate obligations: the cap in section 18(1) of the Landlord and Tenant Act 1927 applies to repair, while the duty to remove alterations and reinstate comes from the licence for alterations and the yield-up clause.
Tenants often ask a dilapidations contractor to price the schedule before they decide whether to do the works or negotiate a settlement. Landlords ask for the same costing to test the claim and plan reinstatement works or an end of lease refurbishment. We give either side a builder's figure line by line, and we never value or negotiate the claim itself.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do dilapidation works include?
Every section of the surveyor's schedule, delivered by one team and handed over once. Six workstreams on one contract, each priced line by line and programmed back from the end of the lease.
Strip-out to shell and soft strip
Tenant partitions, kitchens, cabling and finishes removed, waste tracked, the shell left safe and clean.
Cat A reinstatement
Raised floor, suspended ceiling, LED lighting and base-build services returned to the landlord's specification between tenants.
Schedule repairs and redecoration
Doors, glazing, joinery, floors and fabric repaired and redecorated, item by item against the schedule.
MEES upgrades: lighting, heating, heat pumps, controls
The plant and lighting changes that lift a commercial EPC before the next letting.
Fire stopping and compliance items
Fire doors, compartmentation, alarms and emergency lighting on the schedule, put right with our fire safety works team.
Reception, lobby and common parts
Entrances, lift lobbies and WCs rebuilt to marketing standard, out of hours where tenants remain.
How it works
How do lease-end works run, schedule to handback?
01
Schedule costed, scope agreed
We price the schedule and agree the scope with the landlord's and the tenant's surveyors.
02
Programme from the lease date
The finish date goes in first; every trade and delivery is set back from it.
03
Strip-out and repairs
Fit-out removed, fabric repaired and redecorated, item by item.
04
Cat A, services and MEES
Ceilings, floors, services and energy upgrades, with the EPC re-assessed.
05
Handback pack
Certificates, O&M manuals and a photo record handed to you and your surveyor.
Free guide: fit-out and MEP works for lease-end floors
How a landlord's M&E package is scoped, how Cat A and plant upgrades are sequenced in a live building, and the paperwork a floor needs before it goes to market. Free, and a short read before the schedule arrives.
Our promises
Six promises, written into your contract
These are the terms we build to on every lease-end floor: one contract and one site manager, an agreed price that holds, occupiers who carry on working, a date fixed in the contract, the insurance cover your lender expects and zero snags with a full file.
-
One contract, one site manager
Strip-out, builders' work, M&E and compliance run under a single contract with one person accountable.
Slingsby Place, Covent Garden: full internal strip-out behind retained façades, led by Martin Hickey, now our Preconstruction Director, as Project Director.
-
The agreed price holds
Any change is priced and approved in writing before the work is done.
On budget on every Craftex project completed to date.
-
Tenants carry on working
Drilling and deliveries out of hours, protected routes, lifts booked with your managing agent.
Portsoken House entrance: 70 sq m remodelled over nights and weekends, no occupier disturbed.
-
Lettable on your date
The programme is set from your lease end or marketing launch and fixed in the contract.
Beaumont House: other bidders quoted twelve weeks; we handed over in three.
-
The cover your lender and insurer expect
Public and employers' liability cover of £10M each; professional indemnity on request. ISO and CHAS accredited.
The same cover on every Craftex job, large or small.
-
Zero snags, a full compliance file
Fire alarm, emergency lighting, electrical and commissioning certificates, O&M manuals and the lodged EPC at handover.
Every Craftex handover to date closed with zero snags.
Already have a quote? Send it to us. We'll beat it.
Holding a tender for the schedule from another contractor, or a figure from the outgoing tenant's side? Send it to us. A director reviews it and replies with how we beat it for the same scope and the same end date.
Compare your quotes
Where lease-end works go wrong, and what we do instead
Check any lease-end programme against these six points. They decide whether the floor is let on time or sits empty, and most of them are settled before the first partition comes down.
| Area | The usual risk | With Craftex |
|---|---|---|
| The end date | Works start after the term has ended and the void runs on | The programme is set back from the lease date and fixed in the contract |
| The scope | Reinstatement goes further than the lease asks for | Every line is checked against the lease, the licence and the schedule |
| The EPC | The floor is left at E and the next tenant's lender asks why | MEES works are costed with the schedule and the EPC is re-assessed |
| The surveyors | Two surveyors argue over a scope nobody has priced | A builder's costing of every line, the same for both sides |
| The services | Air conditioning the next tenant wanted is stripped out | Services are surveyed before anything is removed |
| The handover | Viewings find snags and missing certificates | Defects closed and the file complete before the agent books a viewing |
What sets the cost of dilapidation works?
Six things decide the budget for a lease-end floor. We settle each one with you before you sign, so the figure you approve is the figure you pay at handback.
| What moves the budget | What we fix before you sign |
|---|---|
| How deep the strip-out goes | We walk the floor with the schedule and mark what stays and what goes |
| Reinstatement to Cat A or to shell | The lease, the licence and the agent's marketing specification read together |
| The age of the M&E and the MEES gap | A survey of plant, lighting and controls against the target EPC |
| Repairs on the schedule | Every line costed, so both surveyors see the same numbers |
| Access, hours and tenants still in | Working hours, lifts and deliveries agreed with the managing agent |
| The programme to the end date | A dated programme set back from the lease end |
Free cost calculator
What will your dilapidation works cost?
Enter your floor area and choose a scope. The range appears as you type and is a first indication only: a walk of the floor with the schedule sets your fixed figure.
MEES works: getting the EPC a floor needs to let
What MEES asks today. A let commercial building in England and Wales must have an EPC of E or better unless a valid exemption is registered. The government proposed in June 2026 that buildings over 1,000 m² reach EPC B from 2031, where cost effective; that still needs secondary legislation.
The works that move an EPC. LED lighting and controls, heat pumps in place of gas boilers or ageing air conditioning, a building management system, glazing and insulation, and rooftop commercial solar where the roof allows. An accredited energy assessor models the options; we price and build the package that reaches the target.
Read more
The seven-year payback test, the exemption for third-party consent refused and the exemption for a fall in value of more than 5 per cent all remain in place, and most exemptions last five years once registered. The previously proposed EPC C step for 2027 will not be taken forward. Our guide to MEES regulations for commercial property tracks each step, and the commercial EPC guide explains how the rating is produced. A void between lettings is the least disruptive time to do MEES works.
Schedules of dilapidations prepared and priced for landlords
Our in-house RICS-qualified quantity surveyor carries out the end-of-lease inspection, prepares the interim or terminal schedule and prices every line from builders' rates, so the claim stands up to the section 18 cap and the Dilapidations Protocol. Already have a surveyor? We cost and build the scope they agree.
Read more
An interim schedule gets repairs done while the tenant is still in occupation. A terminal schedule, generally sent within 56 days of the lease end with the quantified demand, is the basis of the damages claim. Repair, reinstatement and redecoration are listed separately and endorsed with your plans for the building, and items those plans will supersede are left out.
At handback we check vacant possession floor by floor: people, goods and every alteration the lease says must go. Where the parties exchange a Scott schedule, we price each line of the response so both sides argue over the same numbers; our schedule of dilapidations costs guide sets out the sequence under the Pre-Action Protocol.
All our landlord works
The same team carries the rest of a landlord's building, each under one contract with the same directors.
-
Fire Safety & Cladding
Fire stopping, compartmentation and cladding remediation for residential and commercial blocks.Explore -
Fire Doors
Flat entrance and communal fire doors replaced across whole blocks.Explore -
Commercial Roofing & Facade
Roofs and facades repaired, replaced and made watertight.Explore -
Section 20 Major Works
Major works for managing agents, freeholders and RMCs of mansion blocks.Explore -
Commercial Solar
Rooftop solar on offices and warehouses, a fast route to a better EPC.Explore -
Commercial Fit-Out
The Cat B fit-out for the incoming tenant, from the same team.Explore
Lease-end and landlord projects we have built
Landlord and lease-deadline projects; the works differ, the discipline is the same.
-
Portsoken House, Aldgate A full office fit-out of 1,550 sq m over two floors, with the rest of the building let and at work. View case study
-
Beaumont House, Kensington A rundown office rebuilt as one open floor in three weeks, where other contractors quoted twelve. View case study
-
Portsoken House reception, Aldgate A 70 sq m entrance rebuilt over 12 weeks of nights and weekends, with no tenant disturbed. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Dilapidation works: landlord and tenant questions
Who pays for dilapidation works, the landlord or the tenant?
The tenant, where the lease puts repair, decoration and reinstatement on them. In practice the tenant either does the works before the term ends or pays the landlord damages, and the landlord then does them.
Can you price a schedule of dilapidations before we agree it?
Yes. Send the schedule, the floor plans and the lease dates. We walk the floor and cost it line by line, so your surveyor negotiates with a builder's numbers.
What does reinstatement to Cat A involve?
Stripping out the tenant's partitions, kitchens and extra services and putting back the landlord's base specification: raised floor, suspended ceiling, lighting, heating and cooling, fire alarm and finished WCs. Our Cat A vs Cat B fit out guide shows where the line falls.
Which works lift a commercial EPC for MEES?
Usually replacing gas boilers or old air conditioning with heat pumps, LED lighting with controls and a building management system, then glazing, insulation and solar where the building allows. An accredited energy assessor models each option first.
Can tenants stay in the building while you work?
Yes. Drilling, breaking out and deliveries are planned out of hours, while lifts, escape routes and services stay open by day. That is how we built the Portsoken House reception with every tenant in.
Do you carry out end-of-lease inspections?
Yes. Our in-house RICS-qualified quantity surveyor walks the floor against the lease and licences, records each breach with photographs and checks vacant possession at handback, so the schedule and the re-let start from the same facts.
How fast do you reply?
Within one hour, Monday to Saturday, 8am to 6pm. Send the schedule or the address and your lease date, and a director comes back with what happens next.
Is it cheaper to do the works or pay the claim?
It depends on the schedule and the building. The 1927 Act caps damages for disrepair at the fall in value of the landlord's interest, so a costed scope matters to both sides. Our guide to dilapidations explained covers the claim.
Do you work for tenants as well as landlords?
Yes. Outgoing tenants use us to do the works before the lease ends; landlords use us to reinstate and re-let.
How long do lease-end works take on a 1,000 sq m floor?
It depends on how much is stripped and how much plant is replaced. At Beaumont House, a rundown 750 sq m office was rebuilt in three weeks. A floor with new air conditioning takes longer, and the end date goes into the contract before we start.
Can you prepare the schedule, or work with our surveyor?
Both. Our in-house RICS-qualified quantity surveyor can inspect, prepare and price the schedule, or we cost and build the scope your own surveyor agrees.
When should a landlord serve a terminal schedule?
The Dilapidations Protocol says generally within 56 days after the lease ends, with the quantified demand. Served before the end, it gives the tenant time to do the works; the Protocol then asks you to confirm it or send a further one.
Do you check MEES compliance before re-letting?
We take the current EPC and the assessor's recommendations, price the works that lift the rating and carry them out before the next letting. The new EPC is issued by an accredited energy assessor.
Read before the lease ends
Guides written from lease-end floors we have stripped, reinstated and re-let.
-
Guide Dilapidations: The Meaning, the Claim Process and What Tenants and Landlords Pay Read the guide
-
Guide Schedule of Dilapidations: What It Lists, the Timetable and What the Works Cost Read the guide
-
Guide MEES Regulations for Commercial Property: EPC E Today, EPC B by 2031 for Larger Buildings Read the guide
- More guides
- FRI lease explained
- Commercial EPC ratings and costs
- Office strip-out in London
- What a Cat A fit-out costs
- Landlord fit-out contribution
- Licence for alterations explained
- Cat A, Cat A+ and Cat B fit-out
- Value-add refurbishment strategy
- What to do with an empty office building
- Refurbishing an industrial unit to let
- Refurbishing an office while it is occupied
- More case studies
- Related services
- Tenant dilapidations
- Dilapidations surveyor for landlords
- Strip out contractors
- Fire safety and cladding
- Fire door installation
- Commercial roofing and facade
- Section 20 major works
- Commercial solar
- Commercial fit out and refurbishment
- Office fit out
- M&E services
- Office design and space planning
- Sell your commercial property
What our clients say
See all reviews on Google-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified



























