Private Clinic Fit Out and Refurbishment
Consulting rooms, surgeries and treatment suites, built to CQC standards.
Our track record
100% of projects delivered aheadof programme and on budget
Healthcare and treatment rooms we have built
- 2,100 m²healthcare interior for the Macmillan Cancer Care Centre, delivered in 7 months
- 17 weeksto strip out and rebuild Medusa's four Knightsbridge treatment floors
- 0snags at handover, with every certificate in one file
- £10Mpublic and employers' liability cover, ISO and CHAS accredited
One team from consulting room to CQC registration
Craftex delivers private clinic fit out and healthcare fit out in London: consulting and treatment rooms, dental surgeries, aesthetic clinics and day-procedure suites under one contract. Every medical fit out is designed and built around CQC registration, infection control and your opening date.
Our designers draw the rooms, our estimators price them as they are drawn and our own trades build them. One director answers for your clinic from the first survey to the morning your first patient walks in, and the clinic you approve is the clinic that opens.
We build for principals and groups opening a private practice on Harley Street, in Marylebone or Knightsbridge, where rent, consultants and equipment finance all start before the first fee. So the programme is set back from your opening date before a single room is drawn.
What does CQC registration need from your building?
A clinic that fails on its premises waits months for registration while the rent runs. We build every surface, basin, air supply and patient route so the building meets Regulation 15 the first time, and hand you the file that proves it. See how we work as a fit-out and construction partner for businesses.
Read more
Regulation 15 asks for premises that are clean, secure, suitable for their purpose, properly used and properly maintained. CQC must refuse registration if you cannot show you meet it, and it asks for the building control final certificate with the application where Building Regulations approval was needed.
Room sizes and finishes follow the NHS guidance in plain words: consulting and treatment rooms sized to HBN 00-03; floors, walls and ceilings that can be cleaned and disinfected to HBN 00-10; ventilation and air changes to HTM 03-01; electrical supplies to HTM 06; dental decontamination laid out to HTM 01-05. Where a period building cannot meet a clause, we record the departure and how the risk is managed, so you have an answer for the inspector.
Accessibility counts too: level routes, an accessible WC and doors patients can use without help, built to Approved Document M. Whether you call it a healthcare fit out, a medical fit out or a clinic refurbishment, the test is the same: a building the regulator accepts and patients trust.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Which clinics do we fit out?
Six kinds of clinical space, each priced and programmed on one contract before you sign.
Private consulting and treatment rooms
Consulting suites sized to HBN guidance, with clinical basins, wipe-clean finishes and quiet, daylit rooms.
Dental surgeries and practices
Chair services, suction and compressed air, X-ray shielding and a decontamination room with a clean-to-dirty flow.
Aesthetic and dermatology clinics
Treatment rooms with laser-safe finishes, controlled lighting and the calm a premium client expects.
Day-procedure and minor-surgery suites
Procedure rooms with the air changes, sealed finishes and medical gas each procedure needs.
Imaging and diagnostics
Scanner and X-ray rooms with shielding, floor loads and resilient power planned around your equipment. Pathology and research rooms are built by our laboratory fit out team.
Patient lounges and reception
Front of house in stone, timber and soft light, built to the standard of a Harley Street address.
How it works
How does a clinic fit out run, survey to first patient?
01
Survey and clinical brief
We walk the building with your treatment list and equipment schedule, and check floor loads, water, drainage and power.
02
Room data and fixed programme
Every room specified on one set of drawings, one fixed figure and a programme set from your opening date.
03
Landlord, planning and Building Regulations
Licence drawings, the use class E position and building control, prepared by us alongside the design.
04
Build, test and commission
Sealed from dust, with ventilation and water systems tested and recorded before any furniture arrives.
05
Handover pack for CQC
Zero snags, a clinical clean and one file with every certificate your registration needs.
The Craftex Guide to Clinic Fit Out
What CQC checks in your premises, the HBN and HTM guidance that shapes each room, the London consents to settle before you sign a lease, and a programme that ends on your opening date. Written from the contractor's side.
Our promises
Six promises, written into your contract
Not marketing lines. These are the terms we build every clinic to: one team, an agreed figure that stands, patients kept away from the works, our own trades on site, £10M cover and zero snags at handover.
-
One team, one contract
Design, clinical services, theatres, imaging, finishes, joinery and the premises file from one company.
Macmillan Cancer Care Centre: every trade managed directly by Craftex
-
The number agreed is the number paid
Changes only in writing, priced before the work is done.
100% of projects delivered on budget
-
Your clinic keeps seeing patients
Phased by floor, theatre or surgery, sealed from dust, noisy work out of hours.
Portsoken House reception, 12 weeks of night and weekend work, no disruption to tenants
-
Built faster, with our own people
Around 60% of the labour on site is ours, so the programme is ours to keep.
Beaumont House: 750 sq m of offices refurbished in 3 weeks
-
£10M cover and every accreditation
Public and employers' liability £10M each, ISO 9001, 14001 and 45001, CHAS, SafeContractor.
certificates on request before you sign
-
Zero snags, every certificate
Handed over clean, commissioned and documented for CQC, your landlord and your insurer.
Kensington Olympia, 400 sq m handed over on time without a single snag or defect
Already have a quote? Send it to us. We'll beat it.
Holding a clinic fit-out quote from another contractor? Send it to us. We price the same scope line by line and come back with how we beat it, and a programme that meets your opening date.
Compare your quotes
Where do clinic openings fail inspection?
Hold any design or quote up against these six points. Each one can hold up a clinic's registration, and each one is cheap to fix on paper and dear to fix on site. Most failures start in the brief: a room list without a procedure list, or a building chosen before anyone checked the drainage and the floor loads.
| Area | The usual risk | With Craftex |
|---|---|---|
| Floor and wall finishes | Carpet, timber or painted plaster in rooms that must be cleaned and disinfected | Sealed, coved floors and wipe-clean walls specified room by room before anything is ordered |
| Ventilation | Office air conditioning left in treatment rooms that need clinical air changes | Air changes and pressure designed to the procedure list and tested before handover |
| Hand hygiene | Basins added late, in the wrong place or without the right taps | A clinical hand-wash plan drawn with the layout, one basin per room where the guidance asks |
| Decontamination | Clean and dirty instruments crossing in one small room | A one-way flow from dirty to clean, in a separate room where space allows |
| Commissioning records | Water, ventilation and electrical tests missing when the inspector asks | Every test certificate collected as the work is done, not chased after opening |
| The date | The programme ends when the builder finishes, not when you can see patients | The programme set back from your opening date, with the landlord's licence and CQC's lead time inside it |
What sets the budget of a private clinic?
Six things decide what a clinic costs. We settle each one with you before you sign, so the figure you approve is the one you pay.
| What moves the budget | What we fix before you sign |
|---|---|
| Clinical rooms and room data | A room data sheet for every space: size, finishes, basins, power and equipment |
| Ventilation and cooling | Air changes and cooling loads checked against the procedures you will register |
| Water, drainage and dental services | Routes for water, waste, suction and air tested against the building before the layout is fixed |
| Medical gas and imaging shielding | Gas points and shielding scoped with your equipment suppliers |
| Finishes and joinery | A specification with samples, agreed before anything is ordered |
| Consents and the landlord | Licence conditions, building control and any listed-building consent priced into the figure |
Our guide to clinic fit-out CQC requirements explains what the regulator looks for, and the calculator below gives a first range for your floor.
Free cost calculator
What will your clinic fit out cost?
Enter your floor area and pick a scope. You get an indicative range straight away, based on our 2026 indications, ex VAT, equipment and fees.
Dental and aesthetic clinic fit out in London
Harley Street and Marylebone. Consulting suites and dental practices inside Georgian and Victorian townhouses, many of them listed. We plan services through old floors and party walls without touching what the conservation officer protects.
Knightsbridge, Chelsea and the City. Aesthetic and dermatology clinics on prime retail streets, and corporate health suites in City office buildings. At Medusa on Beauchamp Place we stripped out and rebuilt four floors of treatment rooms in 17 weeks.
Read more
A dental practice fit out is the most service-heavy clinic we build: every chair needs water, drainage, suction and compressed air, and every surgery needs X-ray shielding checked by a radiation protection adviser. Dental surgery design starts with where those services can run in your building, then the chair positions, then the finishes. A dental practice refurbishment in a working practice is phased surgery by surgery, so you keep seeing patients.
Listed buildings need listed building consent for internal changes that affect their character, alongside the landlord's licence. We prepare the drawings and the heritage statement with the design so consent sits inside the programme. Our healthcare fit out in London covers Harley Street, Marylebone, Knightsbridge, Chelsea, Kensington and the City, and we take on private clinics across the UK.
Clinics and treatment rooms we have built
Healthcare interiors, treatment rooms and a reception rebuilt around people who could not be disturbed.
-
Macmillan Cancer Care Centre, London A 2,100 m² healthcare interior in seven months, with infection-conscious finishes and accessible routes built for patients on their hardest days. View case study
-
Medusa, Knightsbridge 180 sq m of spa and treatment rooms over four floors, stripped out and rebuilt in 17 weeks to the standard of a prime London street. View case study
-
Portsoken House reception, Aldgate Rebuilt in 12 weeks of nights and weekends inside an occupied building: how we work around patients and neighbours. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Clinic fit out: your questions
Do you build clinics to CQC standards?
Yes. We build the premises to meet Regulation 15 and the NHS HBN and HTM guidance for each room, then hand you one file with every certificate. Registration itself stays with you or your compliance adviser. Read our guide to clinic fit-out CQC requirements before you sign a lease.
Can you convert an office or shop into a clinic?
Usually, yes. Medical and health services sit in Use Class E in England, the same class as offices and shops, so the use rarely needs a planning application. Roof plant, shopfronts, signage and listed buildings can still need consent, and we check the position with your borough first.
Do you install clinical ventilation and medical gases?
Yes. Air changes and pressure where procedures need them, medical gas pipelines to HTM 02-01 and resilient power for equipment, all designed with the layout and tested before handover.
What drives the cost of a clinic fit out?
The rooms and their equipment, ventilation, water and drainage, medical gas and shielding, the finishes and the consents. The calculator above gives a first range; your fixed figure follows a survey.
Do you work outside London?
Yes. Most of our clinics are in central London, and we take on private clinic fit-outs from £500,000 across the UK.
Do you fit out dental surgeries and practices?
Yes. Every chair gets water, drainage, suction and air, every surgery gets its X-ray shielding, and the decontamination room is laid out to HTM 01-05. We coordinate the dental supplier's install dates inside our programme.
How long does a clinic fit out take?
It depends on the building and the rooms. Medusa's four treatment floors in Knightsbridge took 17 weeks from design to handover. Add the landlord's licence and CQC's lead time: we set the programme back from your opening date so both sit inside it.
Can you work in a listed Harley Street building?
Yes. We prepare the listed building consent drawings alongside the landlord's licence and route new services so the protected fabric stays untouched. Our guide to the licence for alterations explains the landlord's side.
Do you design the clinic as well?
Yes. Our designers lay out the patient journey, the rooms and the finishes, and our own trades build them, so nothing is lost between drawing and site. For interiors on their own, see high-end interior design.
How fast do you reply?
Within one hour, Monday to Saturday, 8am to 6pm. Send the address, your treatment list and the date you want to open.
Read before you open a clinic
Written for clinic owners: what CQC checks, how to plan the rooms, how to choose a contractor.
-
Guide Clinic Fit-Out and CQC Requirements: What Your Premises Must Deliver Read the guide
-
Guide Clinic Interior Design: Private and Dental Clinic Layouts Read the guide
-
Guide Licence to Alter: What Tenants Need Before Works Read the guide
- More guides
- More case studies
- Related services
- Where we work
5 areas across London and the UK
What our clients say
See all reviews on Google-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Opening a private clinic, a dental practice or an aesthetic clinic?
Send us the address, the treatments you will register and your opening date. We will come back to you with the director who would run your clinic.



























