Skip to content
Request a callbackCallback

For businesses planning an office move or refit

10 Main Types of Office Layout, With Plans

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 10 min read

Open-plan office at Beaumont House with sit-stand desks, arched windows and a wall of storage

The short answer

The ten types of office layout fall into three families: open, enclosed and flexible. Most London offices end up as a hybrid of open desks and a few enclosed rooms.

  1. Open layouts fit the most people into the least space, at the lowest build cost.
  2. Enclosed layouts give privacy, but every room adds walls, services and cost.
  3. Flexible layouts swap fixed desks for a choice of settings.
  4. Plan for your busiest day, then test the layout on the real floor.

The ten office layout types are open plan, benching, team clusters, screened workstations, private offices, cellular, activity-based working, hot-desking, hybrid and the home office. They fall into three families: open, enclosed and flexible. Below, each one is drawn on the same 720 m² floor, so you can see what it does to your desk count.

Layout arguments in a boardroom usually end when someone draws the rooms on the real floor plan. Suddenly the corner offices take the daylight from twenty desks. The quiet room sits next to the kitchen. The glass box everyone wanted needs its own air conditioning.

We are office fit out contractors in London. This guide shows each office layout from two sides: your team and the build. Our space planning team tests the options on your real floor. Planning a move or a refit? Book a free design consultation and we'll test the layout you choose.

Ten types of office layout at a glance

The ten layouts fall into three families. Open layouts fit the most people. Enclosed layouts give the most privacy. Flexible layouts give people a choice of where to work.

The physical layout of an office is the part that gets built: walls, doors, corridors, zones and the routes of power, data and air. The furniture plan sits on top of it and is much easier to change. The layouts below differ mostly in the first.

The ten office layouts compared, with desks on our 720 m² test floor
LayoutDesks on the test floorPrivacyBuild costWorks best for
Open plan84LowLowestTeams that talk all day
Low-partition or benching128LowLowSales, marketing, project teams
Team clusters48Low to mediumLowDepartments with distinct workflows
Screened workstations50MediumMediumFocused, phone-heavy work
Private offices72 plus 6 officesHighHighLeadership, confidential roles
Traditional or cellular16HighestHighestLegal, research, deep-focus work
Activity-based working44 plus 8 small roomsVaries by zoneMedium to highHybrid teams with varied tasks
Hot-desking84, none assignedLowLow to mediumTeams rarely all in at once
Hybrid60 plus 2 officesMixedMediumMost growing businesses
Home office1HighOutside the office fit-outIndividual focus work

The desk numbers come from our own drawings below: one 36 × 20 m floor with a central core, and 1.6 m desks. They are for comparison, not a promise for your building. "Build cost" is relative, for the same floor. For London figures, see our office fit-out cost guide.

Open plan office layouts fit the most people for the least money

An open plan office layout puts most desks on one shared floor. It is the default in most London buildings. The landlord's Cat A floor is designed for it: the raised floor, ceiling, lighting and air conditioning sit on a regular grid.

Office layout plan of an open plan floor: 84 desks in groups of six, two meeting rooms and a kitchen beside the core
Open plan on our test floor: 84 desks, two meeting rooms, kitchen and breakout.

1. Open office layout

One shared floor with desks in groups. Meeting rooms, the kitchen and breakout space sit around the core. Our guide to the types of office fit-out explains what a Cat A floor includes.

For your team: easy collaboration, shared daylight and simple to rearrange. The price is noise and interruption, the most common complaint about open plan.

For the build: the cheapest layout to fit out. Don't skimp on acoustics, though. Sound-absorbing ceilings, soft finishes and a few rooms for calls make open plan workable.

2. Low-partition or benching layout

Long runs of shared desks with low screens between people. The screens stay below seated eye level. It's brighter than tall workstation screens, and denser than either.

Office layout plan with long benches of 16 desks in rows on both sides of the core, project tables and lockers
Benching on the same floor: 128 desks, about 5.6 m² of floor each.

For your team: sight lines and daylight stay open, but personal space is small. At 128 desks the plan sits well below the 10 m² per person that office designers now work to.

For the build: mostly furniture rather than construction. The real work is power and data to every position. That's why floor boxes or under-floor cabling matter. Plan more storage than you think, because benching leaves almost none.

3. Team-based or cluster layout

Desks are grouped by department or project. Each team gets its own zone, with shared storage and a nearby meeting point.

Office layout plan with eight team zones of six desks, each with a shared table and storage
Team clusters: eight teams of six, each with a shared table and storage.

For your team: faster work within teams, stronger team identity and easier onboarding. The risk is silos between teams.

For the build: largely the same as open plan. Zoning comes from furniture, flooring and lighting. Put the noisiest teams away from the quiet ones. Keep shared spaces between clusters so people still cross paths.

Shared oak team table with white chairs, shelving and plants in an open office at Beaumont House
Beaumont House: shared tables give each team a meeting point on the open floor.

Enclosed layouts buy privacy with walls

Every enclosed room is a small building project. It needs partitions, a door, lighting, ventilation, heating and fire alarm changes. Solid walls also cut daylight to the floor behind them.

Office layout plan of screened workstations in rows, each desk with screens on two sides, plus a phone room and kitchen
Screened workstations: 50 desks, each screened on two sides.

4. Screened workstation layout (the cubicle)

What American offices call a cubicle, the UK mostly calls a screened workstation. It's a desk with taller screens on two or three sides. Modern versions use acoustic panels and lower heights.

For your team: more focus and privacy than open desks, in one shared space. Taller screens block daylight and make the floor feel closed.

For the build: still mostly furniture. It works where people spend the day on calls or on screen and need to concentrate.

5. Private office layout

Enclosed rooms with a door, usually for senior staff or confidential work. Everyone else sits on an open floor.

Office layout plan with six glazed private offices along the window wall and open desks across the rest of the floor
Private offices: six glazed rooms on the windows, 72 open desks behind.

For your team: quiet, confidential and good for client meetings. Hand rooms out by need, not rank, or you create an "office versus desk" culture.

For the build: every room needs services moved to suit, including sprinkler heads where the building has them. Glazed fronts with frosted film keep privacy without killing the daylight. We used them at Beaumont House.

Small meeting room at Beaumont House with an oak table, grey chairs and an arched window
Beaumont House: a private room for confidential meetings, lit by its own window.

6. Traditional or cellular office layout

A traditional office layout gives every person, or every pair, their own room off a corridor. It's common in law firms, research and older London buildings divided into small rooms.

Office layout plan of a cellular floor: sixteen single offices on both window walls, a corridor ring and meeting rooms around the core
Cellular on the same floor: 16 offices, against 84 desks in open plan.

For your team: maximum focus and confidentiality. Collaboration becomes something you book. Only the rooms on the windows get daylight.

For the build: the most expensive layout per person and the hardest to change later. Every room adds partitions, a door, lighting circuits and often its own ventilation zone. In a modern Cat A building that means rearranging a ceiling and services designed for an open floor. Corridors also eat area and must work as escape routes.

Test the plan on the actual floor before you sign the lease. That test is space planning: headcount, workflows and the real floor plan, before any wall is drawn. Our office layout design service does it for you.

Flexible layouts swap fixed desks for choice

Flexible layouts suit teams that aren't all in every day. They need clear rules and good booking tools to work. For how growing startups use flexible space, see flexible workspace design for London startups.

Office layout plan for activity-based working: open benches, focus rooms, phone booths, a quiet room, team tables, a lounge, a café hub and lockers
Activity-based working: 44 desks and tables, plus focus rooms, phone booths and a café hub.

7. Activity-based working (ABW) layout

No assigned desks. Instead, a range of settings: quiet rooms, open benches, team tables, phone booths and a café-style hub.

For your team: choice, autonomy and usually less space per head. People used to their own desk often resist it at first.

For the build: more varied construction than open plan. Phone booths and focus rooms need sound separation and their own ventilation. A café-style hub needs water and drainage in the right place. Lockers replace desk pedestals.

8. Hot-desking layout

Any desk, first come, first served. It's often part of ABW, sometimes used on its own.

Office layout plan for hot-desking: groups of shared desks, two meeting rooms, a kitchen with a booking screen and two rows of lockers
Hot-desking: the open plan floor, with lockers and booking instead of assigned desks.

For your team: the most efficient way to house a team that's rarely all in. It's also the most unpopular if there aren't enough desks on busy days. Plan for peak attendance, not the average.

For the build: cheap in construction, demanding in services. Every desk needs power, data and a screen that works for anyone. Our guide to tech-ready spaces covers what to plan in. Adjustable chairs and desks matter more, because nobody sets up their own.

9. Hybrid or combination layout

A mix: open desks for most, a few private offices or focus rooms, meeting rooms of different sizes and breakout space. Most offices end up here, because few businesses do only one kind of work.

Hybrid office layout plan: open desks by the windows, meeting rooms by the core, two offices, a focus room, phone booths, a board room and breakout
Hybrid: 60 open desks, two offices, phone booths, a board room and breakout.

For your team: the right setting for each kind of work. Without a clear decision on the balance, it becomes a muddle.

For the build: the budget follows the enclosure. Keep enclosed rooms near the core and open desks by the windows. Then daylight reaches the most desks. For greener choices, see our sustainable office design tips.

10. Home office layout

The tenth layout isn't in the office at all. Many London teams now work some days from home, so the home desk is part of the workplace.

Home office plan of a small spare room with a desk by the window, an adjustable chair, shelving and clear floor by the door
The home office: a desk by the window and a chair that adjusts.

For the office build: the more people work from home, the more the office becomes a place to meet. So you'll want fewer desks and more rooms. See our office design trends for 2026.

How to choose an office layout for your headcount

Start with how people work, not how the floor looks. That is the gap between office space planning and office design. These four questions usually decide it.

  1. How many people are in on your busiest day? Plan for that, not the headcount on paper.
  2. What kind of work fills most of the day? Talking, focused screen work, confidential calls or making things.
  3. What does the building give you? Floor depth, windows, columns, ceiling height and the services grid can rule layouts in or out.
  4. How long are you staying? On a short lease, keep enclosure light and reusable. On a long one, build properly.

Check the space per person

Density is the first number to test. The British Council for Offices recommends 10 m² per person as the design density for general workspace in new offices. 8 m² is now a special case. That is a design guide, not a rule for your lease.

The legal floor is lower. HSE says a workroom needs at least 11 cubic metres per person, counted to 3 m high. With a 2.4 m ceiling that is 4.6 m² of floor per person, before any furniture.

Floor area per desk on our 720 m² test floor
LayoutDesksm² per desk
Benching1285.6
Open plan848.6
Private offices789.2
Hybrid6211.6
Screened workstations5014.4
Team clusters4815.0
Cellular1645.0

A worked example for 60 people

Say you have 60 staff, and 48 are in on your busiest day. At 10 m² each, that busiest day needs about 480 m². On our 720 m² test floor, open plan seats everyone with room left for more meeting rooms.

A hybrid fits all 60 with two offices and phone booths. Cellular would house 16. If your team needs quiet and privacy, the answer is usually a hybrid with more focus rooms, not a floor of single offices.

Divide your own usable floor area by the headcount on your busiest day, then compare it with the table. Every extra enclosed room takes area from the open floor.

I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

John Smith, Google reviewSee all reviews on Google

From layout type to an office layout plan

Choosing a type is the first step. An office layout plan turns it into drawings for your floor, in three steps.

  1. Space plan. Your headcount, how often each team is in and the real floor plan set how many desks and rooms fit.
  2. Test fit. Layout options drawn on your floor, with desk and room numbers for each, so you compare them before you commit.
  3. Priced design. The look, materials and services, with the cost checked as it is drawn, then one fixed figure before work starts.

For the thinking behind the plan, read three considerations in space planning. To see what the build costs, try our office fit-out cost calculator.

Two layouts we've built, and why

Both projects started with the same question: how will people actually use the floor?

750 sq mBeaumont House floor
3 weeksBeaumont House programme
1,550 sq mPortsoken House offices
2 floorsPortsoken House, in a let building

Beaumont House: a hybrid built in three weeks

More than 150 staff had to move before their old lease ran out. They had five weeks to go when they first called us. The answer was a hybrid. We demolished walls to open up most of the 750 sq m floor for teamwork.

Frosted glass partitions created smaller rooms for private meetings. Confidential calls had somewhere to go without walling off the daylight. Data cabling runs under the floor to every desk, so a dense open layout stays tidy and free of trip hazards.

It was handed over in three weeks with zero snags. The same client later hired us for a second refurbishment in the building, valued at £1.3 million. Read the full Beaumont House case study.

Portsoken House: light as the layout tool

At Portsoken House in Aldgate, we fitted out 1,550 sq m of offices over two floors. The rest of the building stayed let. The brief was a light, bright, professional workspace. Overhead lighting played a key role in the design, alongside a new entrance, kitchen and WCs.

Turning your layout into a plan you can build

To turn your answer into a plan, read what office space planning is. Or hand it to our office layout and space planning team, then build it as your office fit-out in London.

If you have a floor in mind, book a free design consultation. We'll show you what fits and what each layout means for the build. Moving? Our office relocation checklist puts the layout decision on your timeline.

Frequently asked questions

What are the main types of office layout?

Open plan, low-partition or benching, team clusters, screened workstations, private offices, cellular offices, activity-based working, hot-desking, hybrid and the home office. They fall into three families: open, enclosed and flexible.

What is the most common office layout in London?

A hybrid: open desks for most people, plus meeting rooms, a few private offices or focus rooms and a breakout area. It fits the open Cat A floors most London landlords hand over, and suits teams that do more than one kind of work.

How much office space do I need per person?

The British Council for Offices recommends 10 m² per person as the design density for general workspace in new office buildings. By law, a workroom needs at least 11 cubic metres per person when empty, a minimum that can be too little. Cellular layouts need far more area per head than benching or hot-desking.

What is a traditional office layout?

A traditional office layout, also called cellular, gives each person or pair a room off a corridor. It brings privacy and quiet, but fits fewer people per floor and costs more to build, because every room needs walls, a door, lighting and ventilation. On our test floor it fitted 16 desks where open plan fitted 84.

What is an open plan office layout?

One shared floor with desks in groups or rows, and meeting rooms, kitchen and breakout space around the core. It is the cheapest layout to build and the easiest to change. It needs acoustic treatment and a few closed rooms for calls.

What is the best office layout?

There is no single best layout, because it depends on how your team works. For most London businesses it is a hybrid: open desks for most people, a few meeting and focus rooms and a breakout area. Plan for your busiest day, then test the layout on your real floor.

What is the physical layout of an office?

The physical layout is the part that gets built: walls, doors, corridors, zones and the routes of power, data and air. The furniture plan sits on top of it and is much easier to change later.

Which office layout is cheapest to fit out?

Open plan, because most of the cost is furniture, power and data rather than walls. Every enclosed room adds partitions, a door, lighting, ventilation and fire alarm changes, so cellular layouts cost the most per person.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Choosing a layout for a new office or a refit?

Send us the floor plan and your headcount. We test the layouts that fit your team on your floor, then price the one you choose. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us