Office Fit Out Company in London

Whole floors and headquarters, finished before your lease date.

Our own trades

60% of the labour on site
is our own team

Office floors we have delivered

  • 3 weeksto refurbish 750 sq m at Beaumont House, where others quoted 12
  • 1,550 sq mof premium offices at Portsoken House, with every other floor at work
  • 0snags at handover
  • £10Minsurance cover on every job, ISO and CHAS accredited

One office fit out contractor, from Cat A shell to opening day

Craftex is an office fit out company and design-and-build contractor based in London. Unlike office fit out companies that hand the build to subcontractors, we design and build with our own team, on office floors across the UK. We fit out whole floors, headquarters and Grade A buildings, from Cat A shell to a finished Cat B workplace, and refurbish offices you already occupy. One team designs, prices and builds it around your lease date, so your people move in on the day agreed.

The same directors run your floor from the first test fit to the morning your staff arrive. Our designers draw it, our estimators price it as it is drawn, and our own trades build it, so the scheme your board signs off is the one that gets built.

We build for companies taking a whole Grade A floor or a headquarters building in central London, where a missed date means paying two rents with a team that has nowhere to sit. So the programme is planned back from that date before a single line is drawn.

Boardroom with a timber table and glass walls in the Portsoken House offices, Aldgate

Why move into a fitted floor, not a building site?

Corner of a high-floor open-plan office with oak desks, mesh task chairs and floor-to-ceiling glazing over the London rooftops

You sign one contract and get one programme, set back from your lease date. We handle the landlord's licence, keep the building's other tenants happy, and move your people over a weekend, so on Monday they sit down at finished desks instead of walking round dust sheets. See how we work as a fit-out and construction partner for businesses.

Read more

An office fit out makes an empty or tired floor ready for a business to use: layout, ceilings, floors, mechanical and electrical services, rooms, kitchens and finishes. An office refurbishment upgrades space you already occupy, often floor by floor while people keep working. On most London projects the two overlap, and we run both.

The categories describe how far the floor has gone. Cat A is the landlord's finished but empty floor: raised floor, suspended ceiling, lighting, air conditioning and WCs. Cat B is everything that turns it into your office: rooms, kitchen, finishes, brand and furniture. Cat A+ sits between, a floor with meeting rooms, a tea point and furniture already in, ready for a tenant to move straight in.

Almost every leased floor needs the landlord's licence to alter before work starts. We prepare the drawings and specification your landlord's surveyor asks for, and agree them in parallel with the design so the licence never holds up the programme.

Whether you call it office refurbishment in London, commercial office refurbishment, a commercial office fit out or a workplace fit out, the work is the same: one team accountable from the empty floor to the keys.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Office fit out services, from Cat A to Cat B

From a single Grade A floor to a multi-floor headquarters: six workstreams on one contract, each priced and programmed before you sign. Mechanical and electrical work runs under the same contract through our mechanical and electrical integration team, along with bespoke joinery and managing the move itself.

Biophilic collaboration area with trees in timber planter seats, green chairs and a full-height glazed atrium

Workplace strategy and test fit

How your teams work, meet and grow, tested as layouts on the floor you are considering.

Open Cat A office floor with exposed ductwork at Portsoken House, Aldgate

Cat A: ceilings, raised floors, services

Shell to usable floor: ceilings, raised access floors, lighting, heating, cooling, fire alarm and data.

Finished open-plan office floor with oak-veneer desks, planters, linear pendant lighting and a curved glass meeting pod

Cat B: rooms, finishes, brand

Partitions, flooring, joinery and finishes that make a Grade A floor unmistakably yours.

Boardroom with a long table, tinted glass partition wall, window bench and floor-to-ceiling glazing

Boardrooms and glass meeting suites

Glazed meeting rooms, acoustic booths and boardrooms, wired for video and ready on day one.

Glazed office lobby with white drum-topped columns, a polished reflective floor and a curved glass wall

Receptions and front of house

The first room a client sees: stone, joinery and lighting built to the standard of the address.

Staff kitchen with pendant lights and timber worktop at Beaumont House

Kitchens, breakout and showers

Staff kitchens, breakout floors, showers and lockers for people who cycle or run in.

How it works

How does an office fit out run, lease to keys?

01

Survey and test fit

We walk the floor with you, measure it, and test your headcount and rooms against it.

02

Design and fixed programme

Layout, specification and a fixed figure, with a programme set from your lease date.

03

Landlord licence and Building Regulations

Licence drawings, fire strategy and building control, prepared by us and run alongside the design.

04

Build around your team

Nights, weekends and phased floors, so a working building stays quiet by day.

05

Move-in weekend and aftercare

Systems tested, furniture placed, your team in on Monday, and our support after handover.

Cover of the free Craftex Guide to Office Fit-Out

The Craftex Guide to Office Fit-Out

Everything to settle before you sign a lease or a contract: the terms your agent and landlord will use, what moves cost and programme, and the checklist that protects your move date. Free, and a ten-minute read.

Our promises

Six promises, written into your contract

Not marketing lines. These are the terms we build to on every office floor: one team from design to keys, an agreed price that stands, a business that keeps working, our own trades on site, £10M cover and zero snags at handover.

  1. One team, design to keys

    One contract and one point of contact, led by the same directors from first sketch to handover.

  2. The agreed price stands

    Lump sum, clear scope, programme written into the contract. Changes only in writing, priced before work starts.

  3. Your business never stops

    Nights, weekends and phased areas, so your team keeps working.

    Portsoken House: 7 months around live tenants

  4. Built faster

    Most of the work is done by our own trades, so nobody waits for a subcontractor to turn up.

    Beaumont House: on site in two weeks, finished in three

  5. £10M cover on every job

    Public and employers' liability cover of £10M each. ISO 9001, 14001 and 45001, CHAS and SafeContractor.

  6. Zero snags at handover

    We don't leave site until it's right. Certificates and the health and safety file in your hands on day one.

Example quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Holding a fit-out quote from another contractor, or a design-and-build tender for a new floor? Send it to us. We will come back with how we beat it for the same scope, and a programme that meets your lease date.

Compare your quotes

Where do office fit outs overrun?

Check any programme against these points. They decide whether a move date holds or slips. Most overruns start before the first wall goes up: in the lease, the licence and the survey. Fix those early and the build itself rarely moves.

AreaThe usual riskWith Craftex
Landlord's licenceThe licence arrives weeks after the build should have startedLicence drawings go to the landlord's surveyor while the design is still being finished
The old officeDilapidations at the old lease are left until the last monthWe price and programme the reinstatement of the old floor with the new one
Above the ceilingTired ductwork and wiring found once the ceiling tiles come downServices surveyed before the price is fixed, so surprises are found on paper
Furniture and glassLong-lead desks and glazing ordered after the build startsLong-lead items ordered as soon as the layout is signed
Moving inStaff moved onto a floor that is still being snaggedThe floor is finished, tested and signed off before anyone moves in
Sign-offBuilding control and fire certificates chased after the moveEvery certificate and the health and safety file handed over at the keys

What sets the budget of an office floor?

Six things decide what a floor costs. We settle each one with you before you sign, so the figure you approve is the figure you pay.

What moves the budgetWhat we fix before you sign
The Cat A condition of the floorA survey of ceilings, floors and services, so you know what the landlord hands over
Headcount and room countA test fit with desks, meeting rooms and support space counted
Changes to cooling, fresh air and power to desksAn engineer's check of capacity against your layout
Finishes and joineryA specification with samples, agreed before anything is ordered
AV and ITScreens, conferencing and data points planned with the layout
Landlord and Building Regulations worksThe licence conditions and fire strategy priced into the figure

Our office design and fit-out cost guide explains each of these in more detail, and the calculator below gives a first range for your floor.

Free cost calculator

Estimate your office fit out budget

Enter your floor area or headcount and choose a specification. You get an indicative range straight away, based on our 2026 London rates, ex VAT and fees, for a Cat A floor in good order.

I know my
Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

Headcount uses about 100 sq ft per person. Your fixed figure follows a survey of the floor and an agreed layout.

An office refurbishment company for London's Grade A buildings

View from an office window across the Thames to St Paul's Cathedral and the City of London

The City, Aldgate and Kensington. Occupied buildings where the other tenants must not hear us. At Portsoken House in Aldgate we built two office floors while the rest of the building worked, and at Beaumont House in Kensington the other offices carried on throughout.

Period office buildings on the corner of St James's Street and Pall Mall, London

Mayfair, St James's and King's Cross. Headquarters floors, boardrooms and receptions for firms whose clients judge them by the address. We work to the building's rules for hours, lifts and deliveries, and to the finish a landmark entrance needs. We also take on offices beyond the capital, from Surrey to Leeds.

Office fit out companies vs contractors with their own trades

Fitted office with oak-lined walls and ceiling, lit joinery shelves, a stone tea point and white desks, with a glazed meeting room beyond

Our own people on your floor

An office fit out specialist should be able to name the people who will build your floor. Around 60% of the people on our sites work for Craftex, not for a subcontractor. When a date is at risk, we move our own team onto it instead of waiting for another firm to find a gap in its diary.

Design and build under one contract

Many office fit out companies design the floor and pass the build to subcontractors. As a design-and-build contractor we carry both under one contract, so every design change arrives with its price and its effect on the programme.

Glass-walled meeting room on an office floor, with a long table, black chairs and a city view through full-height windows

Five questions for any office fit out company

Comparing office fit out companies in London, or office refurbishment companies for a floor you occupy? Ask every bidder the same five questions. Which office floors of our size have you finished, and in how many weeks? How much of the site team works for you? Who draws the licence package for the landlord? Is the programme set back from our lease date and written into the contract? Who answers when the date is at risk?

Our answers are in the projects below: Beaumont House, finished well inside the time other contractors quoted, and Portsoken House, two floors built while the building stayed occupied. The licence package is drawn by our team, the date is in the contract, and a director answers the phone. For a longer checklist, see how to choose an office fit out company in London.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Office fit out and refurbishment: your questions

What is the difference between an office fit out and an office refurbishment?

A fit out makes a floor ready for a business that is moving in. A refurbishment upgrades an office you already occupy, often in phases while people keep working. Many projects are a bit of both, and we deliver either under one contract.

When should we bring in a fit out contractor?

Before you sign the lease, ideally while you are still comparing buildings. A test fit shows whether your team fits the floor, and a survey shows what the landlord hands over before you commit.

How can an office fit out be more sustainable?

Keep what still works: ceilings, raised floors, partitions and furniture that can be reused. Then choose efficient lighting and controls and lower-carbon materials. Our site work runs under ISO 14001, and if your landlord asks for a SKA or BREEAM rating, tell us at the start because it shapes the specification.

What is Cat A, Cat B and Cat A+?

Cat A is the landlord's empty floor with ceilings, raised floor, lighting and air conditioning. Cat B adds your rooms, kitchen, finishes and furniture. Cat A+ is a floor fitted with basic rooms and furniture before a tenant arrives. More in our Cat A and Cat B guide.

Do you handle the landlord's licence to alter?

Yes. Our team produces the licence package for your landlord and gets it approved while the design is finished, so consent never holds up the start on site. See licence for alterations explained.

Will the landlord pay towards our fit-out?

Often, as a capital contribution or a rent-free period agreed with the lease. We can price the scope early so you negotiate with real numbers. See landlord fit-out contributions.

Do you design as well as build?

Yes. Office design and build is our standard way of working: our designers draw the floor and our own trades build it. Design on its own: office design and space planning. Building Regulations for the works are covered in Building Regulations for an office fit-out.

Do you work outside London?

Yes. Our office projects are mostly in central London, and we take on schemes from £100,000 to £10M+ across the rest of the UK too.

What is included in an office fit out?

Usually the layout, ceilings, floors, lighting, heating and cooling, power and data, meeting rooms and glass, kitchens, finishes, furniture and AV. On a Cat A floor part of that is already in, so we survey the floor first and price only what it still needs.

Can you design the floor for hybrid working?

Yes. We plan from how many people are in on a busy day, not the total headcount. Then we set the mix of desks, meeting rooms, booths and quiet space, and show it on your floor in the test fit.

How much does an office fit out cost per square foot in London?

It depends on the six things in the budget table above, most of all the condition of the floor and how far the cooling and power must change. The calculator on this page gives a first range for your floor, and we fix the price after the survey and the test fit.

Can you fit out our floor while the rest of the building is occupied?

Yes. We agree the building's rules for hours, noise and lifts, then do noisy work at night and at weekends. That is how we built two floors and a reception at Portsoken House with every tenant in. More on refurbishing an occupied office. For smaller urgent jobs (partitions, electrics, making good) see urgent office alterations and glass partitions.

How long does an office fit out take for a whole floor?

It depends on the floor's condition and the scope. A refurbishment of a ready floor can take weeks; a shell floor with new services takes months. We fix the programme from your lease date before you sign.

What drives the cost of an office fit out?

The floor's Cat A condition, your headcount and room count, changes to cooling and power, the finishes, AV and the landlord's conditions. Our office fit-out cost guide and the calculator above give a first range.

Which parts of London do you cover?

All of London. Our office projects so far are in Aldgate and Kensington, and we work across the City, Westminster, Mayfair and St James's, Knightsbridge, King's Cross and Canary Wharf. Local pages: office fit out in Knightsbridge, office refurbishment in Mayfair.

How fast do you reply?

Within one hour, Monday to Saturday, 8am to 6pm. Tell us the building, the floor size and your move date, and we reply with what happens next.

What our clients say

See all reviews on Google
  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.