Top 3 Trends in UK Data Centre Construction for 2025 and Beyond

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read

Yellow fibre optic cables patched into a network rack

The short answer

Three data centre construction trends shape UK projects in 2026: AI is pushing up scale and power demand, data centres are now regulated as national infrastructure, and more capacity is being built as smaller, faster rooms inside existing buildings.

  1. The government forecasts at least 6GW of AI-capable capacity will be needed by 2030.
  2. Power and grid connection, not floor space, now decide where and how fast you can build.
  3. Data centres of 1MW and above are set to be regulated by Ofcom under a new cyber bill.
  4. In London, most projects are server rooms and data halls inside offices and basements.

Data centre construction in the UK has changed fast since 2025. AI has turned data centres into national infrastructure, with government targets and new rules. For building owners and IT teams, the questions are now about power, resilience and speed. Our London data centre build for a FinTech client took 10 weeks of construction and has 99.98% uptime capacity.

This guide covers the three data centre construction trends that matter most for UK projects. Each one is based on government policy, with its date. Each ends with what it means when you build. Planning data space in London? Book a site visit and we'll check what your building can take.

Trend 1: AI is driving scale, density and power demand

AI needs far more computing power than ordinary business IT. The government's UK Compute Roadmap, published in July 2025, puts a number on it. The UK will need at least 6GW of AI-capable data centre capacity by 2030. That is about three times what is available today.

Server racks lit in green in a dark data room

Much of it will sit in large new campuses. The roadmap aims for a core group of national sites, each serving at least 500MW by 2030. At least one AI Growth Zone should pass 1GW.

Power is now the limit, not floor space

Land and buildings can be found. Grid connections are harder. The roadmap names access to power and grid upgrades as key requirements. AI Growth Zones get priority grid connections. Developers there may build their own high-voltage lines and substations rather than wait for the network.

Planning is speeding up too. In November 2025 the government said new planning guidance gives AI infrastructure priority. The aim is to cut waits from over four years to as little as two.

Trend 2: Data centres are now regulated as national infrastructure

On 12 September 2024 the government designated data centres as Critical National Infrastructure. They now sit alongside energy and water. The sector gets more government support in anticipating and recovering from serious incidents.

Regulation is following. The Cyber Security and Resilience Bill brings data centres under Ofcom as regulator. Data centres with a rated IT load of 1MW or more are in scope. Enterprise data centres, run only for their owner, are in scope from 10MW.

In-scope operators will have to manage risks to their systems and report significant incidents. Ofcom will be able to inspect premises and issue penalties. The detail comes through secondary legislation after Royal Assent.

Resilience is designed in, not added later

These rules shape the building, not just the IT. Physical security, monitored access and fire suppression become audit items. So do dual power paths and monitoring of temperature, humidity and leaks. Every one needs a clear record from commissioning onwards.

  • Access control and CCTV on every data zone
  • Fire suppression suited to live equipment
  • Power with no single point of failure
  • Environmental monitoring linked to the building systems
  • Commissioning records kept for audit

Trend 3: Smaller, faster builds inside existing buildings

Not every data centre is a campus. Many firms need a secure server room or small data hall close to their people. In London, that usually means an existing office floor or basement.

Rows of circuit breakers in electrical switchgear

These projects are fast and tightly sequenced. Prefabricated and modular parts help. Racks, containment, cabling and power units can be made off-site and installed with less work on site. That cuts disruption in a building that stays occupied.

How a data room is built around live offices

A typical project turns an unused basement or part of an office floor into a data room while the rest of the building keeps working. Noisy and dusty works are staged around the offices next door. Critical systems are commissioned out of hours, often over a weekend, in step with the client's network maintenance window.

Ask for hot and cold aisle containment and environmental monitoring linked to the building management system. Raised floors and a modular layout leave room for future upgrades.

Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

Hainro Eybers, Google reviewSee all reviews on Google

Why one design and build team suits data rooms

A data room depends on electricians, mechanical engineers, fire specialists and builders working to one plan. Gaps between packages are where downtime risk hides. One team that designs and builds the whole room closes those gaps.

Craftex started in 2016 and keeps around 60% of its labour in-house. We plan power, cooling, security and finishes as one programme. See our data centre fit-out and infrastructure service. Thinking about a server room or data hall? Book a site visit and we'll survey what your building can support.

Before you plan a data room in an existing building

  • Is there enough incoming power, and how long would an upgrade take?
  • Can the floor carry loaded racks, batteries and cooling units?
  • Where will heat go, and is there a route for pipework or ductwork?
  • What fire protection suits live equipment in this building?
  • How will access be controlled and recorded?
  • When can live systems be switched over with least disruption?

Frequently asked questions

What are the main trends in data centre construction?

Bigger and denser facilities driven by AI, power and grid capacity as the main constraint, tighter rules on resilience and security, and faster delivery through modular parts and smaller rooms inside existing buildings.

How much data centre capacity will the UK need?

The government's UK Compute Roadmap, published in July 2025, forecasts the UK will need at least 6GW of AI-capable data centre capacity by 2030. That is about three times the capacity available today.

Are data centres critical national infrastructure in the UK?

Yes. The government designated data centres as Critical National Infrastructure on 12 September 2024. That gives the sector more government support in anticipating and recovering from serious incidents.

Which data centres will Ofcom regulate?

Under the Cyber Security and Resilience Bill, data centres with a rated IT load of 1MW or more are in scope, and enterprise data centres from 10MW. The duties take effect through secondary legislation after Royal Assent.

Can you build a data centre inside an existing London building?

Often, yes. Basements and office floors can take server rooms and small data halls if the power supply, floor loading, cooling routes, fire protection and access can be made to work. A site survey answers that first.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Need more data capacity without a new building?

Our design and build team surveys your building, plans the power, cooling and security and builds the room around your live systems. Book a site visit.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us