SERVICES
OFFICES & WORKSPACES
WAREHOUSING & INDUSTRIAL
CONVERSIONS & REDEVELOPMENT
RESIDENTIAL PROJECTS
HOSPITALITY & LEISURE
DATA CENTER & TECH INFRASTRUCTURE
RENEWABLE ENERGY
INVESTOR & DEVELOPER SERVICES
PROJECT MANAGEMENT SERVICES
SERVICES
LOCATIONS
WAREHOUSE REFURBISHMENT
RESTAURANT & HOSPITALITY
COMMERCIAL FIT-OUT
OFFICE FIT-OUT
LOCATIONS
white background

London’s Trusted Partner for Data Centre Construction & Fit-Out

From design and build to power, cooling, and security systems, Craftex’s expert data centre builders ensure your facility meets uptime, efficiency, and compliance standards.

Trusted by Leading Businesses

Got a Quote? We’ll Beat It.
Send us any like-for-like quote — we’ll do it faster, better, and at a sharper price.

Our Expertise in Fit-Out & Design

At Craftex, we specialise in delivering fully integrated data centre fit-out and infrastructure solutions in London. From concept to completion, our expert data centre builders ensure every component is meticulously planned and executed.
  • White Space Planning & Fit-Out

    White Space Planning & Fit-Out

    We create optimised environments with hot/cold aisle containment, anti-static flooring, overhead/underfloor cable trays, and rack layouts for peak airflow and efficiency.
  • Power & Cooling Systems

    Power & Cooling Systems

    From UPS, PDUs, and generators to precision CRAC/CRAH units and redundant cooling loops (N+1, 2N), we ensure consistent uptime and thermal performance.
  • Structured Cabling & Connectivity

    Structured Cabling & Connectivity

    High-performance copper and fibre optic infrastructure laid to industry standards, with proper labelling, patching, and traceability for fast troubleshooting.
  • Security & Monitoring Systems

    Security & Monitoring Systems

    Installation of biometric access, CCTV surveillance, motion detection, and environmental sensors integrated with DCIM or BMS platforms for full visibility.
  • Compliance, Testing & Handover

    Compliance, Testing & Handover

    Every project undergoes Factory Acceptance Testing (FAT), Integrated Systems Testing (IST), and full documentation for Uptime Institute or ISO compliance.
  • Lighting & Ambience Design

    Lighting & Ambience Design

    We create bespoke lighting concepts that enhance mood, highlight architectural features, and elevate the dining and hospitality experience—striking the perfect balance between comfort, luxury, and brand identity.

Free Data Centre Construction & Fit-Out Guide

Get a clear, step-by-step guide to data centre construction and fit-outs, including planning, design, budgeting, and compliance essentials to keep your project on track.

How We Work (Process)

Case studies

  • Beaumont House I West Kensington, London
    View case study
  • Portsoken House Reception I Aldgate London
    View case study
  • Portsoken House I Aldgate, London
    View case study
  • Medusa - Beauchamp Place I Knightsbridge, London
    View case study

Why 150+ Businesses Chose Craftex and Keep Coming Back?

Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Design & Build Under One Roof

04 >>
Green Line

Snag-Free Handover — Backed by Clients

05 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

06 >>
Green Line

Faster Turnarounds Than Competitors

03 >>
Green Line

Zero Downtime Fit-Outs

01 >>
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
Green Line
preparation and briefing

Skilled Team

02 >>
Green Line
spatial coordination

Client-Centric Approach

04 >>
Green Line
technical design

Sustainability Commitment

05 >>
Green Line
manufacturing and construction

Tailored Solutions

06 >>
Green Line
concept design

Proven Track Record

03 >>
Green Line
strategic definition

Comprehensive Services

01 >>
Custom solutions aligned with your needs, goals, and budget for exceptional results.
Specializing in residential, commercial, and industrial projects.
Experienced architects, designers, and craftsmen ensure high-quality execution.
Successful projects in prestigious London areas like Chelsea and Knightsbridge.
Clear communication and a stress-free process for all clients.
Eco-friendly materials and high health and safety standards.
Green Line

Skilled Team

02 >>
Green Line

Client-Centric Approach

04 >>
Green Line

Sustainability Commitment

05 >>
Green Line

Tailored Solutions

06 >>
Green Line

Proven Track Record

03 >>
Green Line

Comprehensive Services

01 >>
Custom solutions aligned with your needs, goals, and budget for exceptional results.
Specializing in residential, commercial, and industrial projects.

Experienced architects, designers, and craftsmen ensure high-quality execution.

Successful projects in prestigious London areas like Chelsea and Knightsbridge.

Clear communication and a stress-free process for all clients.

Eco-friendly materials and high health and safety standards.

Independently Certified Contractor for Quality, Safety & Reliability

Frequently Asked Questions

When planning a data centre fit-out & infrastructure project, businesses need to consider several critical factors, including security, scalability, and energy efficiency. A mission-critical build & systems solution ensures the facility is future-ready, with integrated capabilities that align with long-term business goals. We assist businesses by delivering tailored, high-performance spaces that support evolving operational demands.