REQUEST A CALLBACK
SERVICES
OFFICES & WORKSPACES
WAREHOUSING & INDUSTRIAL
CONVERSIONS & REDEVELOPMENT
RESIDENTIAL PROJECTS
HOSPITALITY & LEISURE
DATA CENTER & TECH INFRASTRUCTURE
RENEWABLE ENERGY
INVESTOR & DEVELOPER SERVICES
SERVICES
white background

High-End Interior Designers in London for Your Dream Home

At Craftex Design & Commercial Construction London, we have been working with clients who yearn for high-end interior design and realise their vision of a dream home.

Trusted by Leading Businesses

What Our Customers Say
Got a Quote? We’ll Beat It.
Send us any like-for-like quote — we’ll do it faster, better, and at a sharper price.

Our Expertise in Luxury Interior Designs London

Transform your home or office space with Craftex Design & Construction, where luxury meets functionality and every design detail is crafted to perfection.
  • Bespoke Interior Designs

    We create tailor-made interiors that reflect your personal style and elevate your lifestyle, ensuring every design detail is customized to your needs.
  • Premium Materials & Finishes

    Using only the finest materials and finishes, we guarantee that every element of your space exudes luxury and stands the test of time.
  • Innovative Design Concepts

    Our designs seamlessly combine the latest trends with classic, timeless elegance, ensuring your space feels modern yet enduring.
  • Complete Project Management

    From initial design concepts to final installation, we oversee every stage of the project, ensuring a hassle-free, seamless experience and flawless execution.
  • Client-Centered Approach

    Your vision and requirements guide our design process, ensuring the final result is a space that truly reflects your personality, needs, and desires.
  • Lighting & Ambience Design

    We craft bespoke lighting schemes that enhance mood, highlight architectural features, and elevate the overall atmosphere—bringing depth, warmth, and true luxury to every space.

How We Work (Process)

Case studies

  • Banbury Gym  I  Oxfordshire
    View case study
  • Medusa - Beauchamp Place  I  Knightsbridge, London
    View case study
  • Banbury Warehouse  I  Oxfordshire
    View case study
  • Portsoken House I Aldgate, London
    View case study

Why 150+ Businesses Chose Craftex and Keep Coming Back?

Green Line
preparation and briefing

Fixed Price + Delay Penalties

02 >>
Green Line
spatial coordination

Design & Build Under One Roof

04 >>
Green Line
technical design

Snag-Free Handover — Backed by Clients

05 >>
Green Line
manufacturing and construction

Built-In Reliability: Processes, Guarantees, Proof

06 >>
Green Line
concept design

Faster Turnarounds Than Competitors

03 >>
Green Line
strategic definition

Zero Downtime Fit-Outs

01 >>
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Design & Build Under One Roof

04 >>
Green Line

Snag-Free Handover — Backed by Clients

05 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

06 >>
Green Line

Faster Turnarounds Than Competitors

03 >>
Green Line

Zero Downtime Fit-Outs

01 >>
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
Independently Certified Contractor for Quality, Safety & Reliability
Get a High-End Interior Designer Quote in 24 Hours
Email at: info@craftex.co.uk

Frequently Asked Questions

High-end interior design is the practice of creating luxury and sophisticated spaces. This type of design is all about creating unique, luxurious, and high end residential that make a statement. It is all about attention to detail, incorporating custom pieces, and using quality materials that add to the overall beauty and sophistication of the space.

High-end interior design is a great way to elevate your home's look and feel.