Skip to content
Request a callbackCallback
Multi-storey concrete frame under construction with props and steel stud walls against a blue sky

Turnkey Construction: Design and Build Contractor in London

Planning, design, engineering and construction by one team, under one contract and one price.

Our track record

100% of projects delivered ahead
of programme and on budget

What a turnkey client gets

  • 60%of the labour in-house, managed by our project managers
  • 17 weeksMedusa, Knightsbridge: designed and built across four floors
  • 0snags at handover, checked weekly by our project managers
  • £10Mpublic and employers' liability cover each, ISO and CHAS

From brief to handover, under one contract

One contract, one team, one price: we design your project, get it approved, build it and hand you the keys. We are a turnkey design and build contractor for commercial and residential projects in London, from £100,000 to £10M+.

Turnkey means you hand us the brief and we hand you back the keys. As main contractor we run the design, approvals, procurement and build, and stay your single point of contact throughout. For new builds and whole buildings, see our commercial construction services. On the residential side, see the Kensington Olympia penthouse, 400 sq m designed and refurbished in 12 weeks. Weighing up the routes? Our guide to design and build procurement sets the two side by side.

Bedroom in the Kensington Olympia penthouse, London, designed and refurbished by Craftex

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Our expertise in design and build

  • Brief and feasibility

    Requirements confirmed, site checked, budget tested before design begins.

  • Design

    Concept, spatial coordination and technical design by our in-house team.

  • Approvals

    Planning, landlord consent and Building Regulations. See our commercial design services in London.

  • Procurement

    Materials and long-lead items ordered early so the programme holds.

  • Construction

    Around 60% of the labour in-house, managed by our project managers.

  • Handover and aftercare

    Snags closed before handover, then support as your needs change.

Compare the routes

Design and build or an architect plus a builder?

Both routes can work. This is what changes for you when one team designs and builds.

AreaArchitect, then a separate builderDesign and build with Craftex
ContractsOne for the designer, one for the builder, often more.One contract covers design and construction.
Gaps in the drawingsDesigner and builder can each blame the other.Design is our job too, so any gap is ours to fix.
When you know the priceOnly after full drawings go out to tender.Early: our quantity surveyor prices the design as it is drawn, then you get one lump sum.
Start on siteWhen the design is finished and a builder is chosen.Sooner: we order long-lead items and plan the site while the last drawings are done.
Your timeYou manage the designer and the builder yourself.One project manager is your contact from brief to keys.

Who is on your design and build team

Combined team experience: 834 design projects and 561 major construction projects delivered.

  • Architects

    Draw the scheme and take it through planning.

  • Interior designers

    Plan layouts, finishes, lighting and joinery that can be built.

  • Engineers

    Work out structure, services and fire safety with the architects.

  • Quantity surveyor

    Our in-house RICS-qualified quantity surveyor keeps design and cost in step.

  • Project managers

    Run the site and check the quality of the work every week.

  • Our own trades

    About 60% of the labour is ours, so fewer hand-offs.

How it works

How a turnkey project runs

01

Strategic definition and brief

We confirm what the project has to achieve and agree the brief with you, so design can begin.

02

Concept and technical design

Architectural and engineering design brought together and signed off before construction.

03

Lump-sum price

One price against a clear scope, so the design you approve is the cost you pay.

04

Construction

We manage every trade on site as your single point of contact, with weekly quality checks. Medusa in Knightsbridge was designed and built in 17 weeks across four floors.

05

Handover

The finished space handed over ready to use, every snag closed.

Got a quote? We’ll beat it.

Already have a quote? Send it to us and we will aim to beat it.

Design and build contracts, in plain words

Most design and build jobs in the UK use the JCT Design and Build Contract. The 2024 edition is the current one. You write down what you need: the employer's requirements. We answer with our design and our price: the contractor's proposals.

Single-stage means one fixed price on a finished brief. Two-stage means we join early, shape the design with you, then agree the fixed price before work starts. We tell you which one suits your programme.

Our guide to the JCT design and build contract explains the main terms. Want to compare firms first? See our list of the best design and build contractors in London.

Why clients choose Craftex for design and build

  1. One contract, one contact

    Design and build under one roof, total accountability.

  2. Fixed price

    Lump-sum contract against a clear scope.

  3. Ahead of programme, on budget

    Every project we have delivered has finished ahead of programme and on budget.

  4. Around 60% in-house labour

    Less waiting, tighter control of quality and programme.

  5. Zero-snag handovers

    Weekly quality checks by our project managers.

  6. Insured and certified

    ISO and CHAS. Public and employers' liability cover of £10M each.

Cover of the free Craftex guide to office fit-out

Free Office Fit-Out Guide

A simple checklist covering budget, timelines, design and compliance, to help you avoid mistakes and stay on track.

Our team

  • in

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Design and build: your questions

What is a turnkey contract in construction?

One contractor takes responsibility for the whole project, from brief and design through construction to handover, and gives you the finished building ready to use. You deal with one team and one contract.

What is the difference between turnkey and design and build?

They overlap. Under design and build the contractor designs and builds to your requirements; turnkey usually goes further, covering everything until the space is ready to use, including fit-out and furniture. We offer both.

Why not hire an architect and a builder separately?

You can, but the gap between them is where cost and time leak: a design the builder prices higher than expected, or questions no one owns on site. With one team, design and price are checked against each other from day one.

What size of project do you take on?

Design and build projects from £100,000 to £10M+. Recent examples include Medusa (£460K, 17 weeks) and Portsoken House (£2.2M, 7 months).

Do you work on commercial and residential projects?

Both. Commercial work includes offices, clinics and warehouses; on the residential side we were main contractor for the Kensington Olympia penthouse from concept to completion.

Who manages the project?

Our own project managers, as your single point of contact. Prefer a client-side manager over your own contractors? See construction project management.

How long does a design and build project take?

It depends on size and approvals. From our own jobs: the Drake's shop on Savile Row took 12 weeks (4 weeks of design, 8 on site, £187K), and Medusa in Knightsbridge took 17 weeks from concept to handover (£460K).

Is design and build cheaper than the traditional route?

We will not promise that. What you do get is a fixed lump-sum price sooner, one team that checks every drawing against cost, and nobody else to blame if something is missed.

Which contract do you use for design and build?

Usually the JCT Design and Build Contract, with your requirements and our proposals attached to it. If your lender or adviser asks for another standard form, we can work with that.

Can you build a design another architect has started?

Yes. We take the drawings you already have, check them for cost and the rules, complete the technical design and then build it. You still sign one contract with us.

Do you work outside London?

Yes. We are based in Victoria and work across London and the UK. In Banbury, Oxfordshire we designed and fitted out a whole 2,500 sq m warehouse in 8 weeks for £350K, and the site kept running.

How do I start a design and build project?

Send us the address, a short brief and your budget range. We visit, look at the space and show you how we would run it. We reply within one hour, Monday to Saturday, 8am to 6pm.

Free site audit for your project

Tell us what you want to build. We will visit, look at the space and the brief, and show you what a design and build route would look like.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us