SERVICES
OFFICES & WORKSPACES
WAREHOUSING & INDUSTRIAL
CONVERSIONS & REDEVELOPMENT
RESIDENTIAL PROJECTS
HOSPITALITY & LEISURE
DATA CENTER & TECH INFRASTRUCTURE
RENEWABLE ENERGY
PLANNING & DEVELOPMENT
INVESTOR & DEVELOPER SERVICES
PROJECT MANAGEMENT SERVICES
SERVICES
PLANNING & DEVELOPMENT
LAND VALUE UPLIFT & PLANNING GAIN
white background

Warehouse Refurbishment & Fit-Out Services in London

From shell to fully functional workspace in 6–10 weeks. We handle design, build, M&E, and compliance.

Trusted by Leading Businesses

Got a Quote? We’ll Beat It.
Send us any like-for-like quote — we’ll do it faster, better, and at a sharper price.

Our Expertise in Warehouse Fit-Out & Design

At Craftex Design & Construction, we specialize in end-to-end commercial fit-out refurbishment services that transform empty spaces into functional, brand-aligned workplaces.
  • Bespoke Design

    Bespoke Design & Planning

    We don’t believe in one-size-fits-all solutions. Every warehouse is carefully assessed and planned to maximise space, improve flow, and align with your operational needs.
  • End-to-End Delivery

    End-to-End Delivery

    From strip-out to final finishes, we manage the entire process—including CAT A and CAT B fit-outs—so you don’t have to juggle multiple contractors.
  • Functional, Future-Ready Warehouse Fit-Outs

    Functional, Future-Ready Warehouse Fit-Outs

    Whether it's integrating office pods, installing mezzanines, or fitting breakout zones, we deliver spaces that support productivity and growth.
  • Integrated M&E Services

    Integrated M&E Services

    Our in-house team covers everything from lighting and fire alarms to HVAC and power—designed to meet regulations and built to last.
  • Refurbishment with a Purpose

    Refurbishment with a Purpose

    Whether you’re upgrading an ageing unit or preparing a clean, marketable space for tenants, we create spaces that perform and impress.
  • Smart Storage & Space Optimization

    Smart Storage & Space Optimization

    We design intelligent racking, shelving, and storage systems that maximize vertical space, streamline logistics, and improve overall warehouse efficiency.

Warehouse fit out contractors: refurbishment of existing warehouses

This service is for businesses that already have a warehouse or industrial unit and need it upgraded: new offices and welfare inside the shed, better layout and storage, new lighting and power, floors, fire safety and finishes. If you need a new warehouse built from the ground up, see warehouse construction.

Fit-outMezzanine-level and ground-floor offices, welfare, changing rooms, canteens, racking zones and loading areas.
RefurbishmentFloors, roof lights, cladding repairs, insulation, LED lighting, heating and ventilation upgrades.
Live sitesPhased works around your deliveries and shifts, so the warehouse keeps operating.

What is usually included

  • Survey of the building, services and floor, and a layout plan for your operation.
  • Partitions, offices and welfare built inside the shell, including high-bay areas.
  • Electrical upgrades, LED high-bay lighting, power for equipment and chargers, data.
  • Heating, ventilation and cooling for offices and work areas.
  • Floor repairs, coatings and line marking; racking zones with safety barriers.
  • Fire alarm, emergency lighting and compliance sign-off.

Our warehouse projects

ProjectScopeSizeProgramme
Banbury Warehouse, OxfordshireNew welfare and storage inside a live warehouse, £380K148 m²4 weeks
Drake's warehouse, LondonRailway-arch warehouse converted into offices, studio, production and dispatch, £200K500 m²8 weeks
Hackney warehouse, LondonFull engineering systems overhaul, 6 m ceilings120 m²4 weeks

More detail: what is a warehouse fit-out and fit-out vs renovation.

Warehouse fit-out FAQs

Can you fit out a warehouse while it is still operating?

Yes. Most of our warehouse projects are live sites. On the Banbury warehouse we built new welfare and storage in 4 weeks around continuing operations.

What is the difference between a warehouse fit-out and a refurbishment?

A fit-out adds what your operation needs inside the building — offices, welfare, racking, power. A refurbishment repairs and upgrades the building itself — floors, roof, lighting, heating. Most projects combine both.

How long does a warehouse fit-out take?

Smaller fit-outs of 100–500 m² typically take 4–8 weeks on site. Larger or phased projects take longer. You get a fixed programme with your cost plan.

Do you work outside London?

Yes. We are based in London and deliver warehouse projects across the South East and the Midlands, such as Banbury in Oxfordshire.

What is the minimum project size?

Craftex takes on construction projects from £100k.

Need your warehouse upgraded without stopping operations? Tell us the size and what you need. We survey the unit and give you a fixed programme and a line-by-line cost plan.

Request a callback07403 928666

How We Work (Process)

Free Warehouse Refurbishment & Fit-Out Guide

Refurbish or upgrade your warehouse with confidence. Use our simple checklist covering layout planning, budgeting, compliance, and fit-out essentials—so your project stays on track from start to finish.

Warehouse Conversion Guide

Case studies

  • Banbury Warehouse I Oxfordshire
    View case study
  • Warehouse Fit-out - Hackney, London
    View case study
  • Portsoken House I Aldgate, London
    View case study
  • Beaumont House I West Kensington, London
    View case study

Why 150+ Businesses Chose Craftex and Keep Coming Back?

Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Independently Certified Contractor for Quality, Safety & Reliability

Frequently Asked Questions

We offer a complete, end-to-end service that includes structural refurbishments, CAT A & CAT B fit-outs, office and mezzanine installations, M&E works (lighting, HVAC, power), flooring, partitions, fire safety systems, and more—designed to suit your operational needs.