The short answer

Office space planning works out how much floor you need and where people, rooms and services go, before you sign a lease or build anything. Office design then decides how it looks and feels.

  1. Plan for your busiest day, not average attendance.
  2. Allow about 10 m² per person for general workspace, the British Council for Offices standard.
  3. Test the brief on the real floor plan, then check what the landlord allows.
  4. Fix power, data and air to the layout before the design is priced.

Office space planning works out how much space your business needs and where desks, rooms, routes and services go. It comes before office design, which decides how the space looks and feels. Get the plan right and the build is simpler, cheaper and quicker.

Get it wrong and you pay twice: for space you don't use, then to rebuild a layout that doesn't work. This guide covers the UK space numbers, the five steps we follow and the checks to run before anything is built.

It draws on offices we have planned and built through our office design and space planning service in London. Moving or refitting soon? Book a free design consultation and we'll test your team on the real floor.

What office space planning covers

Office space planning decides who sits where and what goes where. Desks, meeting rooms, quiet rooms, kitchen, reception, storage, print and comms rooms, and the routes between them.

It also fixes the less visible things that are expensive to move later. Where power and data come up through the floor. Where each room gets its air and light.

A good plan balances the three key considerations in space planning:

  • your people and what they need to do their jobs;
  • how the business works from day to day;
  • what the building allows: columns, windows, cores, ceiling heights and the landlord's rules.

Office space per person: the UK numbers

There is one legal minimum and one industry standard worth knowing.

Office space per person, UK
MeasureFigureSource
Legal minimum room volume11 m³ per person (about 3.7 m² with a 3 m ceiling)HSE guidance
Recommended design standard10 m² per person for general workspaceBritish Council for Offices
Former high-density allowance8 m² per person, now a special caseBritish Council for Offices

HSE says the 11 m³ figure is a minimum. It may not be enough once furniture fills the room, and it doesn't apply to meeting rooms.

So a team of 40 needs about 400 m² at the British Council for Offices standard. That covers desks, meeting rooms, kitchen, storage and circulation. The right density for you depends on how your team works. Plan for your busiest day, not the average one.

How to plan an office in five steps

These are the five steps we follow on every office. Each one ends with something you can check before the next begins.

  1. Brief: headcount, growth, teams and the busiest day.
  2. Space budget: square metres by function.
  3. Test fit: the brief drawn on the real floor.
  4. Layout: who sits next to whom, and the routes.
  5. Services and furniture: power, data, air and desks to suit.

I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

John Smith, Google reviewSee all reviews on Google

Step 1 of 5

Agree the brief

Write down headcount today and in two to five years. Then add how many people are in on a typical day and on the busiest one.

List the teams that must sit together and the rooms you can't do without. A short staff survey shows what is missing from your current office. People who helped shape a layout are far more likely to use it well.

Step 2 of 5

Set a space budget

Turn the brief into square metres by function: workstations, meeting rooms, support space and circulation. This tells you whether a building is big enough before you sign anything.

It also tells you what you can trade. Fewer desks can buy more meeting rooms. A smaller floor can fund better finishes.

Circulation is the line most often forgotten. Corridors, escape routes and the space around desks all take area that nobody sits in.

Step 3 of 5

Test the brief on the real floor

Draw a first layout onto the actual floor plan. This test fit proves the brief fits, or shows that it doesn't. Do it on two or three buildings while you are still choosing.

Empty office floor at Portsoken House with exposed ducts, timber doors and floor markings before the layout is built
Portsoken House, Aldgate: the floor before the plan becomes walls.

In London, also get the building's fit-out guide from the landlord or managing agent. It sets what you can change, when noisy work can happen and how new services connect. Know too whether the floor is Cat A or a bare shell. Our guide to Cat A, Cat A+ and Cat B explains the difference.

Step 4 of 5

Fix the layout and adjacencies

Now decide who sits next to whom. Group teams that work together. Put quiet rooms by windows or away from busy routes. Keep walkways clear for movement and fire escape.

The layout type changes the build too. Open plan, cellular, team zones or a hybrid each fit a different number of desks on the same floor. Our guide to the main types of office layout draws all ten.

Step 5 of 5

Coordinate services and furniture

Set where power, data, lighting, heating and ventilation must go to serve the layout. Then choose furniture that fits it.

Sit-stand desks, chairs that support posture and modular tables make it easier to adapt as your team changes. When this step is done, the plan can be priced properly. Our office fit-out cost guide shows what drives the figure.

Office space planning guidelines and standards

Run every layout past these before it is fixed.

  • Keep desks away from entrances and main routes.
  • Keep meeting rooms away from loud zones such as kitchens and breakout areas.
  • Give each person enough desk width, usually 1.2 to 1.8 m.
  • Leave room between desks so chairs don't collide and people can pass.
  • Plan power and data to where desks will be, not where the old ones were.
  • Check every layout against the building's fire strategy and escape routes.

Internal changes usually don't need planning permission. A listed building needs listed building consent for significant works. In a leased building the landlord approves the drawings through a licence for alterations before work starts.

Office space planning vs office design

Once the plan is fixed, design gives the office its character. It works inside the layout, not against it. Design covers finishes, lighting, furniture, acoustics and brand.

Office space planning vs office design
Office space planningOffice design
Question it answersHow does the office work?How does it look and feel?
DecidesArea, rooms, routes, servicesFinishes, lighting, furniture, brand
WhenBefore the lease, before pricingOnce the layout is fixed
Changes laterWalls, doors and services: costlyFinishes and furniture: cheaper
Main risk if skippedPaying for space that doesn't workAn office nobody enjoys using

The order matters because each step fixes the next. A wall position sets the lighting and the ventilation. The lighting sets the ceiling. Choosing finishes before the plan is fixed means paying for some of them twice.

Good design makes people want to come in. But it can't fix a layout that doesn't work. A beautiful meeting room in the wrong place stays empty. Pricing well also starts with choosing the right commercial contractor.

When you need only one of the two

  1. Only design: the layout still works, but the office looks tired or off-brand.
  2. Only planning: you are testing whether a new building fits, before you choose it.
  3. Both: you are moving, growing, shrinking or changing how people work.

What we have learned planning offices in London

Three lessons from our own projects.

Long timber table with orange chairs beside a planted wall and frosted glass meeting rooms at Beaumont House
Beaumont House, Kensington: 750 m², built in three weeks.

The deadline can be the brief

At Beaumont House in Kensington, the client had five weeks left on their lease. More than 150 staff had to move. The plan for the 750 m² floor was simple on purpose.

We demolished walls to make one open-plan office. Frosted glass partitions created smaller rooms for private meetings. Data ran under the floor to every desk, so there are no trip hazards. A neutral, monochrome palette kept the design inside the plan, and the office was built in three weeks.

The building can rule out the obvious plan

At Drake's, the 500 sq m workspace sits inside a railway arch in Bethnal Green. Nothing could be drilled into the arch.

Studio, offices, production and dispatch were mapped around how the teams actually work. Partitions, ceilings and services stand on their own frames. It was designed and built in eight weeks.

Good planning pays for itself

One office client wrote in a Google review:

"With their architect they came up with a very smart design for our office to fit more desks…"

Another said they spent around two weeks agreeing all the details before the work started. That time is what makes the build quick.

From a plan to a priced office

Space planning is not about making an office fancy. It is about making it work every day: clear routes, daylight, control of noise and the right rooms in the right places.

For why this matters before you sign a lease, read our guide to commercial space planning.

Want the plan, the design and the build from one team? See our space planning and office design service, then the office fit out in London that follows. If you have a floor in mind, book a free design consultation and we'll show you what fits.

Office space planning checklist

  • Plan for the busiest day, not average attendance.
  • Allow for growth over the length of the lease.
  • Test the brief on the real floor before you sign.
  • Fix the layout before you choose finishes.
  • Put power and data where the desks will be.
  • Get the landlord's approval before work starts.

Frequently asked questions

What is office space planning?

It is deciding how much space your business needs and how to arrange it: desks, meeting rooms, quiet rooms, kitchen, storage, reception and the routes between them. It also fixes where power and data come up, which is costly to move later.

Do I need space planning or office design first?

Space planning first. The layout decides where walls, doors and services go. Design then chooses finishes, lighting, furniture and colours for that layout. Choosing finishes before the plan is fixed usually means paying for some of them twice.

How much space does each person need in a UK office?

HSE guidance sets a legal minimum of 11 cubic metres of room volume per person, about 3.7 m² of floor with a 3 m ceiling, and says this may not be enough once furniture is in. The British Council for Offices recommends 10 m² per person for general workspace.

How long does office space planning take?

The drawing is usually the quick part; agreeing the brief takes longest. One office client told us they spent around two weeks agreeing every detail before work started. In London, add the landlord's review of your drawings.

Who should be involved in planning an office?

The person who owns the budget, team leads, a few staff who will use the space and whoever runs IT and facilities. On the delivery side, the designer and the contractor, ideally as one team, plus the landlord, who must approve the drawings.

Can office design be updated without changing the layout?

Yes. Finishes, lighting, furniture and branding can change while walls and services stay put. It is the cheaper route when the layout still works. If teams have grown or the way you work has changed, test the plan first.

What does office space planning cost?

It depends on the floor area, how many options are tested and whether it is bought on its own or within a design and build fit-out. When we plan and build, the planning sits inside one fixed figure for the whole project. Get the scope written out so you can compare like for like.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Moving office or refitting the one you have?

We measure the floor, agree the brief with you and turn it into a layout, a design and one fixed figure, all with one team. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us