For businesses choosing or refitting premises
Commercial Space Planning: Why Your Business Can’t Ignore It
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
Commercial space planning fits what your business does into a specific building before you commit to it. It quietly decides three expensive things.
- How much floor area you pay rent, rates and service charge on.
- What the fit-out costs and how long it takes.
- Which consents you need: building control, the landlord and sometimes planning.
Commercial space planning usually gets bought as a design service. A floor plan, some furniture, a few 3D views. That undersells it. By the time a contractor prices your office fit-out, most of the budget is already fixed on paper. It was fixed by the plan.
The plan decides how much space you rent, what the build costs and which consents you need. This guide shows how, with examples from our own office space planning in London and fit-out projects. Weighing up a building? Book a site visit and we'll test your brief on the real floor.
Commercial space planning sets three big costs
Most people think the plan is about where desks go. On commercial jobs, it decides three things that cost far more than furniture.
Get any of them wrong and you pay twice. Once on paper, and again to put it right on site.
How to plan a commercial space, step by step
The same six steps work for an office, a shop or a converted building. Each one is explained in the sections below.
- Write the brief. Headcount now and in two to three years, your busiest day, the rooms and the equipment you need.
- Set a space budget. Start from about 10 m² per person for general workspace, then adjust it to how your team works.
- Test fit the real floor. Draw the plan on two or three shortlisted buildings before you sign anything.
- Check the consents. Building control, the landlord's licence for alterations and, for new ductwork or a shopfront, planning.
- Price the plan. Ask a contractor to price the layout and the programme while lines are still cheap to move.
- Fix the layout, then build. Review it again at every lease break or renewal.
The first decision is how much space you take
Rent, rates and service charge are paid on area, year after year. The fit-out is a one-off. So getting the area wrong is the costliest planning mistake. And it is made before the lease is signed.
A plan drawn on the actual floor is called a test fit. It tells you four things:
- Whether you fit at all. Count desks, meeting rooms, storage, kitchen, plant and the routes between them.
- How much of the quoted area works. Columns, cores, deep floors and awkward corners all eat into it.
- What the building costs to run. Service charge, rates and energy follow the area you take, not the area you use.
- How much room you have to grow before you must move again.
Two buildings with the same area can seat different numbers of people. Test two or three shortlisted buildings this way. The choice usually makes itself.
How much space each person needs
There is one legal minimum and one industry benchmark. HSE guidance says each person needs at least 11 m³ of room volume. Any part of a room over 3.0 m high counts as 3.0 m. HSE is clear this is a minimum, and it doesn't cover meeting rooms.
The British Council for Offices recommends 10 m² per person for general workspace. It used to allow 8 m². Real density depends on how your team works, so plan for your busiest day, not the average one.
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
The second decision is what the fit-out costs
The plan sets the scope. The scope sets the price and the programme (see our office fit-out cost per sq ft guide). These plan choices move the most money.
- Walls. Every enclosed room adds partitions, doors, lighting, ventilation and fire alarm changes. On a Cat A floor, small rooms mean reworking a ceiling grid built for open plan. See our guide to Cat A and Cat B fit-out.
- Wet areas. Kitchens, tea points and WCs far from the existing drainage need new runs, pumps or floor works.
- Plant and extraction. In a restaurant, the extract route fixes the kitchen. Everything else is planned around it.
- Phasing. In an occupied building, the plan decides what can be built while people keep working.
At Portsoken House reception in Aldgate, the plan for 70 m² included structural changes. We rebuilt the lift surrounds and added a shop window for daylight. The offices above stayed occupied. So the plan also had to work at night and at weekends. We rebuilt it in 12 weeks with no disruption to tenants.
The plan set the programme, and the programme set the cost.
The third decision is which consents you need
A layout is not just furniture. It has to work for everyone who signs it off.
- Building control. New partitions, WCs and services are usually building work. Escape routes (Part B) and access for disabled people (Part M) both follow the plan.
- The landlord. Almost any alteration in a leased building needs a licence for alterations. A clear plan early makes it a formality.
- Planning. Works that affect only the interior are not development. But new ductwork, plant or a new shopfront can need permission.
The use class matters too. Offices, shops, cafés, restaurants, gyms and clinics all sit in Use Class E. Moving between them generally needs no planning permission for the use. Pubs, bars and takeaways sit outside it.
Check all three before the plan is fixed. Otherwise you find out during the build, when changes cost the most.
Each building type plans around something different
The principle is the same everywhere. What you plan around is not.
| Building | Plan around first | Our example |
|---|---|---|
| Office | People, rooms and noise | Beaumont House, 750 m² |
| Occupied building | Tenants on the other floors | Portsoken House, 1,550 m² |
| Railway arch or warehouse | What you can't fix to | Drake's, 500 m² |
| Workshop or light industrial unit | Power, heating and the fume extract | Hackney warehouse, 120 m² |
| Small multi-floor unit | Stairs and light | Medusa, four floors |
Offices: plan for the busiest day
At Beaumont House in Kensington, the client had five weeks left on their lease. More than 150 staff had to move. We demolished walls to make one open-plan floor of 750 m². Frosted glass partitions created smaller rooms for private meetings. Data ran under the floor to every desk. It was built in three weeks.
Compare the main types of office layout before you choose one. For style ideas, see our office design trends for 2026.
Existing buildings: the structure leads
At Portsoken House, we fitted out 1,550 m² of offices over two floors. The rest of the building stayed let. The plan worked with the existing floors, which we levelled. It added a new entrance, kitchen and WCs.
Railway arches and warehouses: plan around what you can't touch
At Drake's, nothing could be drilled into the railway arch. So we designed a self-supported internal build. Every zone was mapped to how the teams work: offices, kitchen, photo studio, production, storage and dispatch. The smaller, better-planned space cut rent, utilities and running costs.
Planning too late costs a redesign
Medusa in Knightsbridge came to us at RIBA Stage 2. The concept and 3D visuals existed. The cost of building them had not been tested. Because design and construction sit in one team, we could price the concept early. We then adapted the design so it fitted the client's budget.
It worked. But it was rework that an earlier plan, with cost in the room, would have avoided.
Who should do your space planning
You can sketch a first layout yourself, using our guide to what office space planning is. For a small office move, that may be enough. Once the plan touches the lease, the structure, the services or the consents, you need more.
You need someone who knows what each line costs to build. That is a core part of what a commercial contractor does.
That is why we plan and build as one team. The person drawing the layout talks to the person pricing it before it reaches you. See our workplace planning and design service, or commercial fit-out and refurbishment for other building types.
Five checks before you commit to a building
Every one of these can be checked on site. Bad answers are far cheaper to hear before you sign than after. Send us the address or the floor plan and book a site visit. We'll tell you what fits and what it will involve.
Before you sign
- Have you tested your brief on the actual floor plan?
- Have you planned for your busiest day, not the average?
- Do kitchens and WCs sit near existing drainage?
- Have you checked escape routes, access and the landlord's rules?
- Does the fit-out cost and programme still work with your move date?