SERVICES
OFFICES & WORKSPACES
WAREHOUSING & INDUSTRIAL
CONVERSIONS & REDEVELOPMENT
RESIDENTIAL PROJECTS
HOSPITALITY & LEISURE
DATA CENTER & TECH INFRASTRUCTURE
RENEWABLE ENERGY
PLANNING & DEVELOPMENT
INVESTOR & DEVELOPER SERVICES
PROJECT MANAGEMENT SERVICES
SERVICES
PLANNING & DEVELOPMENT
LAND VALUE UPLIFT & PLANNING GAIN
white background

Your Strategic Partner for Commercial Fit Out Excellence in London

Craftex creates workspaces that boost productivity, cut operational costs, and elevate your brand image - whether you’re expanding, relocating, or upgrading.

Trusted by Leading Businesses

Got a Quote? We’ll Beat It.
Send us any like-for-like quote — we’ll do it faster, better, and at a sharper price.

Curious About Our Fit-Out and Refurbishment Expertise?

At Craftex Design & Construction, we help businesses cut fit-out costs, move in faster, and get a quicker return, by building smart, efficient offices that fit more people, cost less to run, and finish ahead of schedule, with additional strengths in home renovation and refurbishment.
Proven by hundreds of satisfied clients and 150+ projects across London. We’ve built our reputation on speed, precision, and value where every project we deliver reflects that.
  • Tailored Design and Build Solutions

    Tailored Design and Build Solutions

    We plan, design, and deliver workspaces built for long-term performance. The initial stage includes your budget, timeline, and operational goals in mind. From step one of planning to final handover, we coordinate well to ensure efficient delivery, less disruption, and measurable value.
  • CAT A and B Fit-Out

    CAT A & B Fit-Out

    Starting from structural preparation (CAT A) to full interior completion (CAT B), we take care of everything. We employ a team of professionals who install lighting, ceilings, and M&E systems built for reliability and efficiency. The perfection of work ensures your space is ready for use from day one.
  • Commercial Refurbishment

    Commercial Refurbishment

    Expect us to upgrade your workspaces with precision and speed. Our refurbishment approach minimises downtime and makes your space brighter, and better organised. We update everything to suit modern, flexible ways of working, like hybrids, so that professionals can work smarter.  
  • Smart Space Optimization

    Smart Space Optimization

    The smart storage solutions we offer help you make the most of your space. The additions like modular racks, mezzanines, and custom-built storage gives you more space without moving. Every setup is built to last, easy to use, and fully compliant, keeping your workspace neat and efficient.
  • Fire Strategy & Compliance

    Fire Strategy & Compliance

    We make fire safety and compliance simple and reliable. Every project includes a clear safety plan with proper escape routes and systems that meet UK standards. We work closely with building control to avoid delays and keep your workspace safe for the long term.
  • Sustainability & Energy Efficiency

    Sustainability & Energy Efficiency

    Our sustainable designs help you save money and reduce environmental impact. We use energy-efficient lighting, low-VOC materials, and smart systems to cut costs and create a comfortable, eco-friendly workspace built for the future.

The Craftex Design-to-Delivery Framework

Free Commercial Fit Out Guide

Access a short guide covering budgets, timelines, layouts, and compliance to plan your commercial fit-out smoothly.

Case studies

  • Portsoken House I Aldgate, London
    View case study
  • Portsoken House Reception I Aldgate London
    View case study
  • Medusa - Beauchamp Place I Knightsbridge, London
    View case study
  • Banbury Warehouse I Oxfordshire
    View case study

Why 150+ Businesses Chose Craftex and Keep Coming Back?

Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Independently Certified Contractor for Quality, Safety & Reliability

Commercial fit-out in London: one contractor for offices, retail, hospitality and warehouses

A commercial fit-out in London rarely happens on an empty site with no neighbours. Shops keep trading, hotels and restaurants sit next to occupied buildings, offices are on leased floors with strict building rules, and warehouses stay operational. Craftex is a design & build contractor, so one team takes your project from site audit and design through to handover, with around 70% of the labour in-house and a lump-sum price against a clear scope.

Office fit-out and refurbishment

From Cat A infrastructure to a fully finished Cat B workplace, including M&E, partitions, ceilings, lighting, joinery and furniture. At Portsoken House in Aldgate we delivered a £2.2M, 1,550 sq m warehouse-to-office conversion with full M&E around occupied tenants. See our dedicated office fit-out London page for what to plan before you start.

Retail fit-out in live trading environments

Prime London retail cannot afford to close. For Drake's flagship on Savile Row in Mayfair we completed a £410K, 120 sq m refit – new shopfront, bespoke timber fixtures and lighting – in 12 weeks while the shop kept trading. Planning a shop or flagship store? Read our retail fit-out in London guide on landlord consents, shopfront planning and live-trading refits.

Restaurant, bar and hotel fit-out

Hospitality projects combine kitchens and extraction, guest areas, rooms and services, often in older buildings. Craftex took part in Sloane Place in Chelsea, where a five-storey Victorian building was remodelled into a 27-key boutique hotel with restaurant and bar (£1.29M, 28 weeks) next to a members' club that stayed open. More on our restaurant & hospitality fit-out service.

Warehouse and industrial fit-out

Changing rooms, welfare, racking, mezzanines and safety barriers installed inside live operations. At Banbury Warehouse we delivered changing rooms, lockers, racked storage and safety barriers (£380K, 4 weeks) without stopping the warehouse. See warehouse fit-out & refurbishment.

What makes London commercial fit-outs different

Most London projects need landlord consent (usually a Licence for Alterations) and have to follow the building's own fit-out rules on working hours, noisy works, deliveries and access. Building Regulations approval and the fire strategy have to be agreed before work starts, and projects run under the CDM 2015 regulations. Central London sites also mean limited loading, restricted delivery times and close neighbours. We plan programmes around all of this with night shifts, weekend working and tailored programmes, so your business, your tenants and your neighbours are not disrupted.

Planning a commercial fit-out in London?

Book a free site audit. We will review your space, the building's requirements and your timeline, then give you a clear design & build proposal.

Get a free consultation See all case studies

Frequently Asked Questions

It depends on the category of fit-out (Cat A or Cat B), the specification of finishes, M&E requirements and the condition of the existing space. We don't give guesswork figures: after a site audit we prepare a detailed, itemised cost plan for your space, so you can see exactly where every pound goes.