SERVICES
OFFICES & WORKSPACES
WAREHOUSING & INDUSTRIAL
CONVERSIONS & REDEVELOPMENT
RESIDENTIAL PROJECTS
HOSPITALITY & LEISURE
DATA CENTER & TECH INFRASTRUCTURE
RENEWABLE ENERGY
INVESTOR & DEVELOPER SERVICES
PROJECT MANAGEMENT SERVICES
SERVICES
white background
Francis Holland School - Swimming Pool Refurbishment
A specialist swimming pool and facilities refurbishment in a live school — moisture- and safety-rated throughout, delivered safely and on schedule, ready for pupils in time for the new term.
4Weeks
Project Timeline
100%
On Budget
86sqm
Gym Area
0 Days
Delays
Craftex was appointed to refurbish the swimming pool and surrounding facilities at an independent London school — a specialist environment with its own technical demands and a non-negotiable deadline: the new term. A pool refurbishment combines difficult conditions, strict safety requirements and a fixed calendar, and we managed all three end to end, delivering a facility ready for pupils on day one.

Education-aware delivery, single point of contact.

A specialist facility, refurbished to standard.

Project Overview
Working in a school means safety and the calendar come first. Craftex managed every trade directly, worked to the constraints of an education setting, and sequenced the project around term dates so the school could plan with confidence.

A swimming pool environment is one of the more technically demanding spaces to refurbish — moisture, ventilation, durable surfaces and safety standards all have to be right. We delivered a refurbishment that meets those technical requirements while giving the school a bright, welcoming facility pupils want to use.

BRIEF. BUILD. DELIVER.
Book Your Site Audit
How It Works
Brief. Build. Deliver.
Step Three
Handover & Aftercare
Aftercare support to keep a demanding environment performing
Single accountable team from brief to handover
Completed within the fixed calendar window
Safe, compliant, ready-to-use facility delivered for term
03
Step Two
The Build
Every trade directly managed to protect schedule and safety
Pool, surrounds and facilities refurbished to standard
Environment-rated surfaces and finishes installed throughout
Specialist works delivered safely on a live school site
02
Step One
The Brief & Design
Survey, sequencing and procurement built around the term calendar
Safety provisions designed for a live education setting
Moisture- and safety-appropriate finishes specified before works
Scope agreed around the school's needs and pool technical standards
01
Book a Consultation
A swimming pool is a hostile environment for materials — constant moisture, chemicals and heavy use punish anything that isn't specified correctly. We designed the refurbishment around finishes and provisions built for those conditions, while making the space bright, safe and genuinely welcoming for pupils. The technical requirements and the experience were treated as one brief, not a trade-off.

Designing a pool environment that performs

In an education setting the deadline is immovable: the facility has to be ready for term. Our pre-construction phase surveyed the existing pool and facilities, specified moisture- and safety-appropriate materials, and built a sequenced programme to fit the available window — typically the pressured gap that school works have to land in. Safety planning for a live school site was locked in before any works began.

Planning around the school calendar

Craftex managed every trade directly and delivered the specialist works to programme, with safety in a school environment as the constant priority. A pool refurbishment leaves little room for error or overrun, and direct control of the trades is what kept both the standard and the schedule intact.

Executing safely in an education setting

The refurbished pool opened ready for pupils — safe, compliant, bright and built to handle the demands of daily school use. Our aftercare support continued beyond handover to keep the facility performing.

The result, and what happened after

Our gallery
Your members deserve a world-class facility.
Ready to get started?
Whether you're starting from a shell unit or refurbishing an existing gym, we'll deliver a fit-out that performs as hard as your members do.
Call us Now
Discuss Your Project

Case studies

  • Banbury Warehouse I Oxfordshire
    View case study
  • Warehouse Fit-out - Hackney, London
    View case study
  • Portsoken House I Aldgate, London
    View case study
  • Beaumont House I West Kensington, London
    View case study
Challenges & Solutions
01
Solutions
Moisture-, chemical- and safety-appropriate materials were specified throughout so the refurbishment performs under real pool conditions.
Environment-rated specification
04
Challenges
A bright, inviting finish was delivered alongside the technical refurbishment, giving pupils a facility they actually want to use.
Welcoming by design
03
Education-specific safety measures were locked in before works began, with direct trade control maintaining them on site.
School-setting safety planning
02
The works were sequenced to land safely inside the available window, protecting the term deadline.
Calendar-built programme
04
Beyond the technical fix, the space had to feel bright, safe and genuinely welcoming, not merely functional.
A facility pupils want to use
03
Working safely in an education setting put pupil and staff safety above everything else throughout the works.
A live school site
02
The facility had to be ready for the new term; the date could not move under any circumstances.
A non-negotiable deadline
01
A pool space punishes anything specified incorrectly, with constant moisture, chemicals and heavy use attacking every surface.
A technically hostile environment
Every commercial fit-out has its constraints. Here's how this one was solved.

Our team

in
in
Sviatoslav Jerdetchii
CEO & FOUNDER
He skillfully assembles small, specialized teams for construction projects...
in
Joe Crawford
OPERATIONS DIRECTOR
Joe has 37 years of experience working on both the commercial and operational side...
in
Martin Hickey
PRECONSTRUCTION DIRECTOR
Martin has over 50 years of experience in construction having started as a labourer...
in
in
Konstantin Jegorovs
PROJECTS DIRECTOR
Konstantin brings a wealth of experience, insights and knowledge to his role...
Contacts
WRITE TO TELEGRAM