Hackney, London

Craftex proudly delivered a full engineering system overhaul for a 120 m² warehouse with 6m ceilings, ensuring efficiency, safety, and modern standards.


We carried out a full-scale redesign and implementation of all engineering systems in a (1,292 sq ft) warehouse with a 646 ft ceiling height. The client provided an initial electrical layout, which we substantially enhanced and optimized as part of our warehouse fit outs.

We also developed new specifications and installed an electric heating system, ensuring uniform heat distribution throughout the facility. A bespoke lighting solution was also designed and installed to support operational efficiency in all work zones.

Electrical System Enhancements

Services
Design and reconstruction
location
Hackney,
London
Total size
120 m²
Timeframe
4 weeks
Green Line
Green Line
Design and reconstruction


SERVICES
To overcome the challenge of no natural wastewater outflow, we installed pipework for a sink and an emergency safety shower.

A pump system was designed to redirect wastewater to a remote location, requiring careful planning and seamless integration.

Plumbing and Drainage Solutions

At the Banbury warehouse, We installed air outlets for effective circulation and fume extraction. For the electrolytic workstation, a dedicated ventilation system was built, venting 12 meters above roof level to maintain safety and regulatory compliance.

Ventilation and Air Quality Systems

All electrical systems were connected to a high-voltage panel and integrated with the existing consumer unit.

A full inspection and testing process confirmed safety, compliance, and reliable performance of every system installed.

System Integration and Testing

Our gallery
The team worked on the project

Our team

in
Sviatoslav Jerdetchii
CEO & FOUNDER
He skillfully assembles small, specialized teams for construction projects...
Robert Barton
DEVELOPMENT DIRECTOR
Former Regional MD at Berkeley Homes. Leads our development partnerships with landowners and investors...
Joe Crawford
OPERATIONS DIRECTOR
Joe has 37 years of experience working on both the commercial and operational side...
Martin Hickey
PRECONSTRUCTION DIRECTOR
Martin has over 50 years of experience in construction having started as a labourer...
Konstantin Jegorovs
PROJECTS DIRECTOR
Konstantin brings a wealth of experience, insights and knowledge to his role...
Like our project
Leave an application and we will make a project for you