Macmillan Cancer Care Centre - Healthcare Interior Fit-Out
A purpose-built healthcare environment designed to support comfort, dignity, and care. The Macmillan Cancer Care Centre fit-out delivered welcoming patient spaces, clinical areas, and support facilities, creating a calm and functional setting for both patients and healthcare professionals.
4Weeks
Project Timeline
100%
On Budget
86sqm
Gym Area
0 Days
Delays
Craftex was appointed to deliver the interior of a cancer care centre — a project where design carries an emotional weight most fit-outs never have to. The space had to feel calm, warm and human for people facing the hardest days of their lives, while meeting the hygiene, accessibility and durability standards healthcare environments demand. We managed the project end to end, treating the human experience and the technical compliance as equally non-negotiable.

Sensitive delivery, single point of contact.

A calming space, engineered for care.

Project Overview
A care environment can't tolerate the noise, dust and disruption of a normal building site. Craftex managed every trade directly and worked to protect the people around the project, delivering a demanding technical fit-out with the sensitivity the setting required.

Everything a patient sees was chosen to lower stress — soft lighting, warm materials, natural tones and a layout that feels open rather than clinical. Everything they don't see was engineered for healthcare: wipe-clean, infection-conscious surfaces, accessible circulation, and finishes built to survive constant, rigorous use.

BRIEF. BUILD. DELIVER.
Book Your Site Audit
How It Works
Brief. Build. Deliver.
Step Three
Handover & Aftercare
Aftercare support to keep the environment performing to standard
Single accountable team from brief to completion
Healthcare standards met and verified
Clean, compliant, fully commissioned handover
03
Step Two
The Build
Every trade directly managed by Craftex for a consistent standard
Accessible circulation and compliant detailing built in
Hygienic, wipe-clean surfaces installed throughout
Works delivered clean, contained and considerate of a live setting
02
Step One
The Brief & Design
Sequencing, dust and access plan completed in pre-construction
Healthcare-compliant finishes specified before works began
Warm material, lighting and layout palette agreed up front
Patient experience designed first, clinical compliance layered in
01
Book a Consultation
The brief asked for two things that usually pull against each other: a space that feels soft and human, and one that meets the unforgiving standards of a clinical environment. We led with the patient — warm tones, considered lighting, natural materials and an open, non-institutional layout — then engineered the compliance invisibly underneath: hygienic, durable surfaces, accessible routes, and detailing that holds up to infection-control cleaning without looking like a hospital.

Designing for reassurance and compliance at once

A care setting demands a pre-construction plan most projects never need. We specified healthcare-compliant materials, sequenced the works to minimise disruption, and put dust, noise and access controls in place to protect everyone near the project. Procurement was planned so compliant, long-lead items arrived on time and the programme never pressured the standards.

Planning a build around vulnerable people

Craftex managed every trade directly and delivered the works with the discipline a care environment requires — clean, contained and considerate. Holding finish quality and compliance together, under the constraints of a sensitive setting, was the core of the job, and direct control of the trades is what made it achievable.

Executing a sensitive fit-out

The finished centre does what the brief asked: it reassures. It reads as a warm, dignified, human space, while meeting the healthcare standards that protect the people who use it. Our aftercare support continued beyond handover to keep the environment performing.

The result, and what happened after

Our gallery
Your members deserve a world-class facility.
Ready to get started?
Whether you're starting from a shell unit or refurbishing an existing gym, we'll deliver a fit-out that performs as hard as your members do.
Call us Now
Discuss Your Project

Case studies

  • Banbury Warehouse I Oxfordshire
    View case study
  • Warehouse Fit-out - Hackney, London
    View case study
  • Portsoken House I Aldgate, London
    View case study
  • Beaumont House I West Kensington, London
    View case study
Challenges & Solutions
01
Solutions
We led with warmth — soft lighting, natural tones, an open layout — and engineered the clinical compliance invisibly beneath it.
Patient-first design
04
Challenges
Compliant long-lead items were ordered early so standards were never traded away under programme pressure.
Planned procurement
03
Dust, noise and access controls plus careful phasing shielded everyone near the project from the realities of the build.
Protective sequencing
02
Wipe-clean, hard-wearing, hygienic materials were specified throughout so the space meets standard and survives daily clinical use.
Infection-conscious specification
04
Healthcare-grade finishes carry strict specifications and longer procurement, with no room to compromise on standard.
Compliant, long-lead materials
03
Noise, dust and site traffic that a normal build accepts were simply not acceptable around vulnerable people.
A setting intolerant of disruption
02
Every surface had to withstand rigorous infection-control cleaning and constant use without looking institutional.
Hygiene and durability standards
01
The space needed to reassure people on the hardest days of their lives while still meeting the standards of a healthcare environment.
A clinical brief that had to feel human
Every commercial fit-out has its constraints. Here's how this one was solved.

Our team

in
in
Sviatoslav Jerdetchii
CEO & FOUNDER
He skillfully assembles small, specialized teams for construction projects...
in
Joe Crawford
OPERATIONS DIRECTOR
Joe has 37 years of experience working on both the commercial and operational side...
in
Martin Hickey
PRECONSTRUCTION DIRECTOR
Martin has over 50 years of experience in construction having started as a labourer...
in
in
Konstantin Jegorovs
PROJECTS DIRECTOR
Konstantin brings a wealth of experience, insights and knowledge to his role...