Five-star finish, single point of contact.
One property, three experiences.
A hotel restaurant, a hotel bar and a guestroom are three different design problems — energy and turnover downstairs, calm and comfort upstairs. We designed each to its own purpose while holding a consistent material thread through all of them, so a guest moves between buzz and rest without the property ever feeling disjointed.