How Commercial Refurbishment Works?

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read

Stripped-out office floor with bare concrete, a ceiling grid and full-height windows

The short answer

Commercial refurbishment works in six stages: brief and survey, design and costing, approvals, strip-out and build, services and finishes, then testing and handover. Most problems start in the first two stages, not on site.

  1. Survey the building, including asbestos, before the design is fixed.
  2. Price the design before you order anything, so you can still make changes.
  3. Settle the landlord's licence and building control before the strip-out.
  4. Plan phasing early if staff or tenants stay in the building.

A commercial refurbishment can look like one big job. In practice it is six smaller ones, done in a fixed order. Skip a step or rush it, and the problem turns up later, usually on site and usually at a cost.

This guide explains how commercial refurbishment works, stage by stage. It covers what happens, who decides what, and where the time and money really go. It uses offices we have refurbished in London as part of our commercial fit out and refurbishment work. Planning one? Book a site visit and we'll walk the space with you.

How commercial refurbishment works, in six stages

The six stages of a commercial refurbishment
StageWhat happensWhat you get
1. Brief and surveyGoals, budget, dates; survey of the buildingA clear brief and known risks
2. Design and costingLayout, finishes, services; priced in detailA design and a price you can sign off
3. ApprovalsLandlord's licence, building control, CDMConsent to start
4. Strip-out and buildOld fit-out removed; walls, ceilings, structureThe new layout in place
5. Services and finishesMechanical, electrical, data, floors, decorationA working, finished space
6. Testing and handoverCommissioning, snagging, certificatesKeys, manuals and warranties

The rest of this guide takes each stage in turn.

Stage 1: the brief and the survey set the risks

It starts with a conversation about what the space must do. More meeting rooms, better light, room for hybrid working, a stronger brand? Our guide to office workspace design covers the factors to brief on.

Then comes the survey. The team checks the structure, partitions, ceiling height, ventilation, fire routes, floors and services.

Stage 2: design and price before you order anything

The design turns the brief into drawings: layout, finishes, lighting and services. It is then priced in detail, so you can trade items off on paper. Changing a drawing is cheap. Changing a wall that is already built is not.

Empty room with a new suspended ceiling, LED panels, white walls and dark carpet tiles
The aim of stage 2: every finish decided before the trades arrive.

Prices also move with the market. Our article on the cost of construction materials explains why a fixed design and an early order protect the budget.

The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

Alaa Betar, Google reviewSee all reviews on Google

Stage 3: approvals before the strip-out

Three sets of approvals usually apply to a commercial refurbishment.

  1. The landlord: most leases need written consent for alterations. Allow time for the landlord's surveyor to review drawings.
  2. Building control: new partitions, services and structural changes are building work under the Building Regulations. Works that only affect the inside are not development, so planning is rarely needed.
  3. CDM 2015: with more than one contractor, you appoint a principal designer and a principal contractor. A construction phase plan must exist before work starts.

Larger projects must be notified to HSE. That applies when work lasts more than 30 working days with more than 20 workers at once, or exceeds 500 person days.

Stage 4: strip-out and the build

The old carpets, partitions, ceilings and fittings come out first. The space goes back to a clean shell. Then the new layout goes in: partitions, ceilings and any structural changes.

Building site seen from above, with hoarding, scaffold towers, pallets of materials and workers in hi-vis
Good site logistics keep deliveries, waste and people apart.

This is where the survey pays off. Hidden defects found now cost time. Defects found at survey were already in the price.

Stage 5: services, then finishes

Modern offices depend on their services. In this stage, engineers install or move:

  • heating, cooling and ventilation;
  • electrical wiring and lighting;
  • data cabling and wireless coverage;
  • plumbing for kitchens and WCs;
  • fire alarm and emergency lighting.

Then the finishes follow: floors, decoration, doors, joinery and the kitchen. Furniture and IT come last. Landlords should also check the energy rating here. Let commercial property needs an EPC rating of E or better.

Stage 6: testing, snagging and handover

Every system is tested and commissioned before handover. The team walks the space and fixes the small defects, called snags. You then receive the certificates, manuals and warranties.

A good handover has no snag list left. Our aim is a zero-snag handover on every project.

Beaumont House: 750 sq m refurbished in three weeks

At Beaumont House in Kensington, the client had five weeks before their lease ended. They had more than 150 staff to move. Other contractors quoted at least 12 weeks.

£350KProject value
750 sq mOffice refurbished
3 weeksOn site
2 weeksFrom first contact to start

We removed walls to open up the floor and built frosted glass meeting rooms. Lighting and wiring were replaced, and data cabling runs under the floor to every desk. CCTV and access control went in. At the end, we moved the furniture and equipment into the new office.

Refurbishing an occupied building takes a different plan

Many businesses can't move out. Then the works are phased by zone, and noisy jobs move to nights and weekends.

At Portsoken House in Aldgate, the other floors were already let. We refurbished 1,550 sq m of offices over seven months around the tenants. The reception was rebuilt overnight in 12 weeks, so tenants were never interrupted.

Phasing costs more per day of work. But it can cost far less than closing the business.

Choose a team that runs all six stages

Most refurbishment problems happen in the gaps: between designer and builder, or between builder and services engineer. A design and build team closes those gaps. One team owns the brief, the price and the programme.

When you compare choosing fit-out companies, ask who does the work. About 60% of our labour is in-house. You can also compare us with other commercial construction companies in London.

Our office refurbishment team works across London, and we take on construction projects from £100,000. Ready to start? Book a site visit and we'll take you through the six stages for your building.

Frequently asked questions

What are the stages of a commercial refurbishment?

Brief and survey, design and costing, approvals, strip-out and construction, services and finishes, then testing, snagging and handover. Strong projects spend more time on the first two stages, so fewer decisions are left to the site.

How long does an office refurbishment take?

It depends on size, scope and whether the space is occupied. Our Beaumont House refurbishment in Kensington took three weeks on site for 750 sq m. At Portsoken House in Aldgate, 1,550 sq m of offices took seven months around occupied tenants.

Can we keep working during a refurbishment?

Often, yes. The works are phased by zone, noisy tasks move to nights and weekends, and each area is cleaned and handed back before the next one closes. It costs more per day, but keeps the business running.

What is the difference between refurbishment and a fit-out?

A refurbishment improves an existing space that already works. A fit-out makes a space ready for a specific occupier, often from a shell or Cat A floor. Many projects combine both.

Do I need planning permission to refurbish an office?

Works that only affect the inside of a building are not development, so they usually don't need planning permission. External changes or a change of use may. New partitions, services and structural changes still need building control, and most leases need the landlord's consent.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Ready to refurbish your workspace?

Our design and build team surveys the building, designs and prices the work and runs it to handover as one team. Book a site visit.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us