Skip to content
Request a callbackCallback

For businesses taking on a new space

What Does a Fit-Out Company Do? 10 Tips for Choosing One

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read

Treatment room at Medusa in Knightsbridge with jellyfish wallpaper, fitted out by Craftex

The short answer

A fit-out company turns an empty shell or tired space into a working interior: it surveys, designs, gets the approvals and builds the walls, ceilings, services, joinery and finishes, then hands the space over ready to use.

  1. It works inside an existing building, not on the structure or the outside.
  2. A design and build fit-out company does the drawings and the build under one contract.
  3. It usually acts as principal contractor and handles building control for the works.
  4. Check similar past projects, insurance and a written, itemised price before you hire.

You've signed for a new space, or your current one no longer works. Someone says you need a fit-out company. But what is a fit-out company, and what will it actually do?

This short guide explains what a fit-out company does, stage by stage. It shows how it differs from a builder and an interior designer, with one of our own projects as an example. It ends with ten quick checks before you hire one.

We write it from the contractor's side, as one of the fit out companies in London. Have a space in mind? Book a site visit and we'll tell you what it needs.

What a fit-out company is

A fit-out company makes the inside of a building ready to use. It takes a bare shell or a tired interior. It hands back a working office, shop, restaurant, clinic or studio.

The work happens inside an existing building. The structure, roof and outside walls usually stay as they are. Everything you see and use inside is the fit-out company's job: walls, ceilings, floors, lighting, power, heating, cooling, joinery and finishes.

Landlords often hand over a basic finished shell, called Cat A. The tenant's own layout and finishes are Cat B. Our guide to the different types of office fit-out explains each level.

What a fit-out company does, stage by stage

A good fit-out company runs the whole job, not just the build. These are the stages.

Empty open-plan office floor with a suspended ceiling grid, lighting panels and columns
  1. Survey. It measures the space and checks the services, floors and existing condition.
  2. Design. It plans the layout around how you'll use the space, then the services and finishes.
  3. Approvals. It handles building control and helps with the landlord's consent.
  4. Strip-out. It removes what won't stay and protects what will.
  5. Build. It installs partitions, ceilings, floors, services, joinery and decoration.
  6. Handover. It tests the systems, fixes snags and hands over manuals and certificates.

Two legal points matter here. Under the Building Regulations 2010, adding or extending services like electrics or ventilation counts as building work. So does materially altering the building. That usually means building control.

Under the CDM Regulations 2015, a project with more than one contractor needs a principal contractor, appointed in writing. On most fit-outs, the fit-out company takes that role. It then plans and manages health and safety on site.

The layout is where most value is won or lost. Our guide to the main types of office layout helps you decide before design starts.

Fit-out company, builder or interior designer

People often mix these up. Each covers a different part of the job.

Fit-out company compared with a builder and an interior designer
Fit-out companyGeneral builderInterior designer
Main jobInteriors and servicesStructure and buildingsLook and layout
Builds the workYesYesNo
Designs the workOften (design and build)RarelyYes
Typical projectsOffices, shops, venuesExtensions, new buildsAny interior

A design and build fit-out company does both the drawings and the build. One team answers for the result, and the price follows the design you approve. Our comparison of fit-out contractors and general contractors goes deeper.

The kinds of space fit-out companies work on

Most fit-out companies focus on a few types of space. Each has its own risks.

  1. Offices. Layout, acoustics, power and data, meeting rooms. See our office fit-out service in London.
  2. Shops and showrooms. Customer flow, display, lighting and signage.
  3. Restaurants, bars and hotels. Kitchens, extraction, servery and durable finishes.
  4. Clinics, salons and spas. Water, drainage, ventilation and hygienic finishes.
  5. Warehouses and industrial units. Offices inside the shell, mezzanines, staff areas.

Our commercial fit-out and refurbishment page covers the full range we take on.

I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

Rami Jusupova, Google reviewSee all reviews on Google

One fit-out from shell to opening: Medusa

Medusa is a spa and beauty clinic in Knightsbridge. We designed and built it across 180 sq m on four floors in 17 weeks. The project value was £460K.

Medusa treatment room with blue textured walls, a starry ceiling and a treatment bed
Medusa, Knightsbridge: 180 sq m over four floors, designed and built in 17 weeks.

We stripped out all four floors. Then we added new flooring, partitions, ceilings and plastering. We fitted new electrics, fire and intruder alarms, CCTV, air conditioning and ventilation. Jellyfish wallpaper and a water-like paint finish carried the theme, with bespoke mirrors to add depth.

We also refurbished the staircase and redecorated the shopfront. That is a fit-out in full: survey, design, services, finishes and handover, under one contract. Read the Medusa case study.

Ten quick checks before you hire a fit-out company

Use these as a first filter. Our guide to choosing the best commercial fit-out contractors in London explains each one.

Craftex started in 2016 as a carpentry and joinery company, and around 60% of our labour is still in-house. We carry £10,000,000 public liability insurance and take on projects from £100,000. If you're weighing up fit-out companies, book a site visit and judge us on what we find in your space.

Ten checks before you hire

  • Finished projects like yours, with photos and facts.
  • Case studies that show the brief, the timeline and the result.
  • Clear, quick answers to your questions.
  • A named project manager and a written programme.
  • Real references or reviews from past clients.
  • A written, itemised price after a site visit, with exclusions listed.
  • A tidy, organised site if you can visit one.
  • Insurance, health and safety and principal contractor experience.
  • Questions about how your team works, not just what you like.
  • An aftercare period after handover.

Frequently asked questions

What is a fit-out company?

A contractor that makes the inside of a building ready to use. It builds partitions, ceilings, floors, mechanical and electrical services, joinery and finishes, and often designs them too. It works inside an existing building rather than on its structure.

What is included in a commercial fit-out?

Usually layout design, strip-out, partitions, ceilings, flooring, power, data, lighting, heating, cooling and ventilation, plumbing, joinery, decoration and fire safety work. Furniture and equipment can be included or bought separately; agree this at the start.

Do I need building regulations approval for a fit-out?

Often, yes. Work that adds or extends controlled services, such as electrics, heating or ventilation, or that materially alters the building, counts as building work under the Building Regulations 2010. Your fit-out company should handle building control.

What is the difference between a fit-out company and a builder?

A fit-out company specialises in interiors and services inside an existing shell. A general builder or main contractor also takes on structure, extensions and new buildings. Many projects need both, which is why some firms do both.

Who is the principal contractor on a fit-out?

Under the CDM Regulations 2015, when more than one contractor works on a project the client must appoint a principal contractor in writing. On most fit-outs that is the fit-out company, which then plans and manages health and safety on site.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Ready to turn a shell into a working space?

Our design and build team surveys your space, designs it around how you'll use it and builds it under one contract. Book a site visit.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us