SERVICES
OFFICES & WORKSPACES
WAREHOUSING & INDUSTRIAL
CONVERSIONS & REDEVELOPMENT
RESIDENTIAL PROJECTS
HOSPITALITY & LEISURE
DATA CENTER & TECH INFRASTRUCTURE
RENEWABLE ENERGY
INVESTOR & DEVELOPER SERVICES
PROJECT MANAGEMENT SERVICES
SERVICES
LOCATIONS
WAREHOUSE REFURBISHMENT
RESTAURANT & HOSPITALITY
COMMERCIAL FIT-OUT
OFFICE FIT-OUT
LOCATIONS
white background

Your One-Stop Office Design & Space Planning Partner

Looking to make better use of your office space in London? Our office design consultants create smarter workplaces that save space, cut costs, improve efficiency, and support flexibility.

Trusted by Leading Businesses

Got a Quote? We’ll Beat It.
Send us any like-for-like quote — we’ll do it faster, better, and at a sharper price.

Our Expertise in Office Design & Space Planning

Every workspace should be functional, not just attractive. At Craftex, we design London offices that help teams work better, move efficiently, and make the most of every square metre. Our layouts reduce wasted space, improve flow, and support the way your team operates daily.

  • Office Design

    Office Design & Plan Solutions

    We create efficient office designs that maximise usable space, reduce operating costs, and align with your business goals. This helps us in delivering smart, functional layouts that support productivity and long-term growth.
  • Employee-Centric Layouts That Drive Performance

    Employee-Centric Layouts That Drive Performance

    Our layouts prioritise people and performance. We design ergonomic, collaborative, and quiet zones that improve comfort, teamwork, and focus, helping teams work better while optimising every inch of workspace.
  • End-to-End Project Delivery, Done Right

    End-to-End Project Delivery, Done Right

    From design to completion, we manage the entire office fit-out. Our expert process ensures seamless coordination, reduced downtime, cost control, and consistent delivery, all handled under one roof.
  • Integrated M&E Systems That Perform

    Integrated M&E Systems That Perform

    Our in-house M&E team designs reliable, compliant systems that cut energy use and maintenance costs. We handle everything, including mechanical, electrical, and plumbing, ensuring efficiency from day one.
  • Designed for People, Built for Growth

    Designed for People, Built for Growth

    Workplaces should be able to inspire more than impress and that is what we are expert at doing. Our commercial space planning balances creativity and comfort. This helps you to get an environment that focuses on long-term growth.
  • Sustainable by Design

    Sustainable by Design

    Sustainability isn’t an afterthought for us, it’s built into everything we do. From recycled materials to low-energy lighting, we design offices that are as responsible as they are beautiful.

Craftex’s End-to-End Office Transformation Process

Free Office Design & Space Planning Guide

Download a simple checklist to plan efficient layouts, improve workflow, and design a productive office space.

Case studies

  • Portsoken House Reception I Aldgate London
    View case study
  • Beaumont House I West Kensington, London
    View case study
  • Portsoken House I Aldgate, London
    View case study
  • Banbury Warehouse I Oxfordshire
    View case study

Why 150+ Businesses Chose Craftex and Keep Coming Back?

Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Green Line

Fixed Price + Delay Penalties

02 >>
Green Line

Faster Turnarounds Than Competitors

04 >>
Green Line

Built-In Reliability: Processes, Guarantees, Proof

05 >>
Green Line

Snag-Free Handover — Backed by Clients

06 >>
Green Line

Zero Downtime Fit-Outs

03 >>
Green Line

Design & Build Under One Roof

01 >>
🧠 Quality-first = No time or cost wasted on rework.
We don’t leave site until everything is done right. Our PMs run weekly QA checks and all snags are fixed before you even notice them.
🧠 One point of contact = Total accountability.
One team from concept to handover — no gaps, no miscommunication, no finger-pointing.
🧠 Predictable spend = Easier sign-off + no stress.
We work on lump-sum contracts with clear scope. Most of our projects finish ahead of schedule — and that’s not just talk: our 5-star reviews prove it.
🧠 No shutdowns = No lost revenue.
We build around your operations — night shifts, weekends, and tailored programmes to avoid disruption.
🧠 Speed = Faster ROI on your space.
70% of our labour is in-house. That means less waiting, tighter control, and faster delivery than typical subcontractor models.
🧠 Built-in reliability = Lower risk, zero surprises.
QA checkpoints, warranties, and full insurance — backed by 150+ repeat clients. Our standards are documented and reproducible, not just slogans.
Independently Certified Contractor for Quality, Safety & Reliability

Frequently Asked Questions


A great office space should be comfortable, functional, and well-organised. It should have sufficient lighting and plenty of space to move around and work in. The design should be modern, with the right furniture and equipment to make sure everyone is productive.

A great office space should also allow for collaboration and friendly interactions, with plenty of areas to gather, discuss, and brainstorm. It should also be an inviting and inspiring environment, to help people stay motivated and creative.