Warehouse refurbishment in Edinburgh: the city skyline from Calton Hill

Warehouse Refurbishment in Edinburgh

Offices, mezzanines and welfare built into your Edinburgh unit while dispatch carries on, ready to use by your date.

Our track record

100% of our projects finished ahead
of programme and within budget

What our clients get

  • 148 sq mof new rooms built in eight weeks inside a 2,500 sq m Banbury warehouse that kept operating
  • 4 weeksto redesign, install and test every engineering system in a 120 m² Hackney unit
  • 8 weeksto design and build a 500 sq m railway-arch warehouse in Bethnal Green
  • £10Mpublic liability cover, plus £10M employers' liability, ISO 9001, 14001, 45001 and CHAS

Few spare units in Edinburgh, so the one you hold has to work harder

Ryden's 2025 study for the city council puts industrial vacancy at 5%, with only four units of up to 2,000 sq ft available.

It also found a notable share of the city's 11.8 million sq ft older and of basic quality, while occupiers expect better energy efficiency.

So upgrading the unit you hold often beats moving. Start with a free warrant and layout check, and keep trading while we build.

An Edinburgh warehouse after refurbishment, with LED high-bays and a new office front

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Warehouse fit out in Edinburgh, from welfare to mezzanine decks

Whatever the unit needs next, one contractor designs it, builds it, tests it and takes it through building standards. Loading doors, fire alarms and emergency lighting sit in the same contract. See our warehouse refurbishment and fit-out across the UK, or self storage construction for whole storage buildings.

Glazed offices along a steel-framed walkway under a skylight

Offices inside the shell

Heated, lit and fire-separated offices or a studio, built into floor space you already rent. Proof: Drake's fitted offices, a studio and dispatch into one railway arch.

Steel platform with staircase and handrail on a steel frame

Mezzanine decks

More floor area inside the height you already pay for, with stairs, guarding and fire protection to suit the use. Warrant drawings are part of our package.

Staff changing room with lockers and a bench

Welfare for every shift

Changing rooms, lockers, showers, WCs and a canteen sized to the people on each shift. Proof: at Banbury, a changing room with lockers, a bench and a custom-made sink.

Clean warehouse with white steel racking and stacked cartons on a sealed floor

Racking and secure storage

Pallet racking, lockable storage rooms and safety barriers, laid out so aisles and escape routes stay clear. Proof: Banbury gained a double-door store, racking and steel barriers.

Electrical consumer unit with circuit breakers and wiring

Power, lighting and HV

Distribution boards, three-phase power, LED high-bays and high-voltage connections, inspected and tested before use. Proof: in Hackney every electrical system went to a high-voltage panel, then a full test.

Warehouse layout with racking, high-bay lighting and services overhead

Heating, extraction and floors

Even heat in a tall shed, extraction for process fumes, resin floors and drainage where water has no fall. Proof: Hackney's fume vent rises 12 m above the roof.

How it works

Your Edinburgh warehouse refit in five steps

01

Free warrant and layout check

Send a floor plan, photos and your date. A director reads them, then calls about warrant needs, cost drivers and timing.

02

Survey, then a figure

We inspect the shell, slab, roof and incoming power. Only after that do you receive a written figure and programme.

03

Warrant and licence

Warrant drawings go to the council's building standards team, licence drawings to your landlord. Work starts once the warrant is granted.

04

Zoned build

Our trades work one area at a time around shifts, deliveries and collections, with escape routes kept clear every day.

05

Completion and keys

Systems tested, the completion certificate submitted to the council, and manuals and certificates in your hands.

Free Craftex guide to warehouse fit out for Edinburgh businesses

The Craftex Guide to Warehouse Fit Out

Running a unit in Edinburgh? The guide covers layout, budget and approvals, plus the checklist we use to protect a go-live date.

Our promises

Six promises behind every Edinburgh warehouse refit

Each one is written into the contract and holds until you take the keys.

  1. One contractor answers for it all

    Design, structure, services and approvals stay with us, so nothing falls between separate firms.

    Drake's Finance and Operations Director: "It's got to be a 10."

  2. The figure you approve stands

    No change is built until you have seen its cost and agreed it in writing.

    The Banbury client hired us again after their Kensington office.

  3. Orders keep moving

    Zones, quiet hours and delivery slots are agreed with you in a written phasing plan before work begins.

  4. Ready on your date

    About 60% of our site labour is in-house, so the programme never waits on another firm.

    Drake's 500 sq m arch, handed over early.

  5. Insured and accredited

    Professional indemnity is available on request, on top of our liability cover. We hold SafeContractor and Constructionline accreditation as well.

  6. Usable from day one

    Test certificates, O&M manuals and the completion certificate submission are ready before we leave site, so nothing is left to chase.

Sample quotation for an Edinburgh warehouse refurbishment with the total ringed

Already have a quote? Send it to us. We'll beat it.

Holding a price for your Edinburgh unit? Send it to us. A director checks the scope, a survey follows, and only then do we put our figure in writing.

Compare your quotes

Where Edinburgh warehouse refits go wrong, and what we do instead

Six places where an Edinburgh refit loses time or money, each paired with what we do instead.

AreaThe usual riskWith Craftex
Who answersA racking firm, an electrician and a deck supplier, each blaming the others when something fails.One contract covers design, structure and services, so any fault is ours to put right.
The billA price fixed before anyone checked the slab, the roof or the incoming supply.We inspect the shell and services first, then price each package before you commit.
Your operationBays blocked, dust on stock and a shift sent home early.Work fenced into zones, with deliveries and collections written into the programme.
The dateTrades waiting on one another while the go-live date slips.One programme for every trade, counted back from the day you need the space.
Warrant and sign-offOffices or a deck finished with no accepted completion certificate, so nobody may use them.The warrant is planned from day one, and the completion certificate goes in with the test certificates it needs.
The keysSnags still open and manuals promised for later.Everything tested and documented first, so the full file arrives with the keys.

Warehouse refurbishment cost in Edinburgh, 2026

Guide rates for a 5,000 sq ft unit, the most common size let in Edinburgh. Ex VAT and fees, at national rates with no London uplift.

ItemWhat it coversLow to high spec
Light refurbishmentDecoration, LED lighting, floor repairs, small electrical and fire alarm work£9–27/sq ft (£97–291/m²)
Standard fit-outPower, heating and ventilation upgrades, designed lighting, WCs and welfare, loading doors£27–58.50/sq ft (£291–630/m²)
Fit-out with offices and welfareOffices, kitchen, changing rooms and full services in one unit£37–85.50/sq ft (£400–920/m²)
Mezzanine floorStructure and deck only; stairs, balustrades and fit-out on the deck are extra£72–180/m² of deck
Projects we take onFrom the free check to handover£100,000 to £10M+

Racking, sprinklers, a new power supply and asbestos removal are priced for each unit. A tired roof, a weak slab or a long cable run moves the figure.

Send us the floor plan and the date you need the space. A survey comes first; your written figure follows it. Dated 30 Oct 2026.

Free cost calculator

Work out a range for your Edinburgh unit

Enter the floor area, pick the scope closest to yours, and the range updates as you go.

Add
Your estimateEnter your spaceex VAT and fees Get a free warrant and layout check

Indicative, ex VAT and fees, for a sound shell with enough incoming power. Racking, sprinklers and mezzanines are extra. Travel and access are costed after the survey.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Warehouse refurbishment in Edinburgh: questions we are asked

Do you take on warehouse refurbishment in Edinburgh?

Yes, on selected projects. We are a London-based design and build contractor working across the UK, and we survey every unit in person before pricing. Our warehouse projects so far are in London and Oxfordshire; none is in Scotland yet.

Does a mezzanine floor need a building warrant or planning permission?

A building warrant, yes: a mezzanine adds floor area, so the Schedule 3 exemption does not cover it. Planning permission is usually not needed for works that affect only the interior. We check both for your unit before the design is fixed.

Can our warehouse keep running during the work?

In most units, yes. We split the floor into zones, keep the loudest tasks for quiet shifts and fix delivery slots in advance. See how we worked around a busy team at our Banbury warehouse project.

How much does warehouse refurbishment cost in Edinburgh?

From about £9 per sq ft for a light refresh to £85.50 for a unit with offices and welfare, before VAT. Mezzanine decks are priced per m² of deck. We take on projects from £100,000 to well over £10M.

What is the free warrant and layout check?

A director reads the floor plan, photos and date you send. They then call about which works need a warrant, what drives the cost and where the timing risk sits. It is free and commits you to nothing; a written figure and programme come only after a survey.

Do I need a building warrant to refurbish a warehouse in Scotland?

For most works, yes. Under the Building (Scotland) Act 2003, starting work that needs a warrant without one is an offence. Some internal work in an industrial building closed to the public is exempt, but not work that adds floor area or alters the structure. We confirm which applies at survey.

When can we start using the new space?

Once the council has accepted the completion certificate. Using a new building or an extension sooner is an offence, unless the council grants temporary occupation. Edinburgh acknowledges a submitted certificate within 14 days, then a surveyor inspects, so we build that into the programme.

How long does a warehouse fit out take in Edinburgh?

That depends on the scope, the state of the shell and the warrant. The council aims to respond to warrant applications within 20 working days. Your completion date goes into the contract once the survey is done.

Can part of a warehouse be converted into offices?

Yes. Plan fire separation, escape routes, heating and daylight before the layout is fixed, and allow for the building warrant. In Aldgate we fitted out 1,550 sq m of offices over two floors from scratch.

Which parts of Edinburgh and the Lothians do you cover?

Sighthill, South Gyle, Newbridge, Leith and the city's other industrial estates, plus Loanhead and Straiton in Midlothian. For a city-centre office or shop, see commercial fit out in Edinburgh. We also cover warehouse refurbishment in Glasgow.

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning works on an Edinburgh warehouse?

Tell us where the unit is, roughly how big, and when the space must be ready. A director reads it and calls you back.