Restaurant Fit Out in Glasgow
Glasgow restaurants and bars designed and built under one contract, open on your date. Start with a free cost plan.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 4 weeksto strip out and rebuild an 83 sq m restaurant, ready to open
- 10 weeksto refurbish a 300 sq m pub and hand it back ready to trade
- 60%of the labour on our sites is our own, so your opening date never waits on another firm
- £10Mliability cover on every venue, ISO and CHAS accredited
Opening a restaurant or bar in Glasgow? Your licence waits for the build.
Under the Licensing (Scotland) Act 2005, a full premises licence application needs your building standards certificate. A late fit-out means a late licence, and rent with no covers.
We plan the warrant, the licensing certificates and the build as one programme. Then one team designs, builds and certifies your venue, with around 60% of the labour our own.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Restaurant, bar and hospitality fit out in Glasgow, under one contract
Restaurants, bars and pubs designed, built and certified by one team that also runs the warrant and licensing paperwork. Also under the same contract: pubs, cafés and late-night bars. Our national restaurant fit out page shows the full service.
Concept, layout and covers
Dining room, bar and kitchen planned with your chef around covers, service flow and the licence you will apply for.
Kitchen, extract and gas
Canopy, ductwork, odour control, gas interlock and cold rooms, routed to suit the building and the flats above.
Bars and bespoke joinery
Back-bars, counters, booths and panelling made by our own joiners and fitted to the millimetre.
Sandstone and listed interiors
Stone, cornicing and high ceilings repaired and kept, worked into a modern venue with consent in place.
Services, lighting and fire
Fire alarm, emergency lighting and ventilation tested to the means-of-escape standards Glasgow building standards assess before your completion certificate.
Front of house and washrooms
Entrance, host stand and washrooms finished to the standard of the dining room.
How it works
How a Glasgow restaurant fit-out runs
01
Survey and brief
Your opening date and budget first. Then a survey of gas, drainage, power and the route for the kitchen flue.
02
Design and cost plan
Layout, kitchen and bar drawn by our team, then costed package by package by the people who will build it.
03
Warrant and licence
Building warrant drawings for Glasgow City Council, planning or listed building consent where needed, and the licensing certificates sequenced into the programme.
04
Build to your date
Strip-out, kitchen, bar and finishes run in parallel, with deliveries and noisy work timed around the flats and neighbours above your Glasgow unit.
05
Certify and open
Systems tested, completion certificate lodged, zero snags. The certificates your licence needs are in your hands before opening.
The Craftex Guide to Restaurant, Bar and Pub Fit Out
Not ready for a cost plan yet? Read how to sequence design, kitchen, approvals and build to your opening date.
Our promises
Six promises, written into your contract
The terms every Glasgow venue is built to, signed before work starts.
-
One contract, one name
Design, kitchen, bar, approvals and build sit with one team, run by the same directors from survey to opening night.
-
Your number holds
A fixed figure for a written scope. Any change is priced and agreed in writing before anyone starts it.
100% of projects on budget.
-
Doors open where they can
For a live venue, phased areas and out-of-hours work keep you serving where the layout allows.
Drake's, Savile Row: 120 m² flagship refitted in 8 weeks on site, open throughout.
-
Open on the date
Our own trades do around 60% of the work, so no week is lost waiting for others.
Medusa, Knightsbridge: four floors of spa and salon, designed and built in 17 weeks.
-
£10M cover, every job
Public and employers' liability of £10M each, professional indemnity on request. ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Nothing left to snag
We leave when the venue is right. Gas, electrical, fire and extract certificates and the health and safety file come to you.
Already have a quote? Send it to us. We'll beat it.
Send us the figures you were given for your restaurant or bar. We survey the venue, then price the same scope and show you a better number, with a programme built back from your opening date. Or talk the project through with our team first.
Compare your quotes
Restaurant shopfitters in Glasgow: where fit-outs go wrong, and what we do instead
Six places where a Glasgow venue loses time or money, set against how we run each one.
| Area | The usual risk | With Craftex |
|---|---|---|
| Who answers | A kitchen supplier, a shopfitter and a designer, each pointing elsewhere when the extract fails its test | One team designs, installs and tests every part, so one name answers for the result |
| The final bill | A figure given before anyone has lifted the floor of an old sandstone building | A survey of structure, drainage and the flue route first, then a cost plan built package by package |
| Rent before opening | Months of rent and wages paid on a unit that cannot trade yet | Our own trades working in parallel, on a programme counted back from your opening date |
| The licence date | The licence application stalls because nobody planned for the building standards certificate | Warrant, completion and licensing certificates mapped at the first visit and timed into the build |
| Compliance and sign-off | Gas, fire, emergency lighting and extract sign-offs left for you to chase | We run every approval and certificate you need to open, for the council, your landlord and your insurer |
| Handover | Opening night with snag tape on the bar and paperwork still missing | A finished venue with zero snags, the safety file and every test certificate handed over on day one |
Restaurant fit out cost in Glasgow, 2026
Our 2026 indications per sq m for a typical 150 sq m venue, ex VAT, fees and loose furniture.
| Scope | Indication |
|---|---|
| Restaurant, bar or pub refurbishment | £1,225–1,710/m² (£114–159/sq ft) |
| Commercial kitchen with equipment | £2,430–2,880/m² of kitchen |
| New-build restaurant or pub | £2,295–2,700/m² (£213–251/sq ft) |
| Projects we take on | £100,000 to £10M+ |
Assumes a sound building with gas, power and drainage available. External flues, structural openings, listed fabric and licensing conditions are priced per project. No London or regional factor is applied.
Send us the floor plan and your opening date; we return a cost plan and a programme.
Free cost calculator
What will your Glasgow restaurant or bar fit-out cost?
Enter the floor area and choose a scope for an instant range, based on our 2026 indications.
Prime interiors from our portfolio
-
Knightsbridge, London Medusa: a four-floor spa and salon, concept to handover in 17 weeks View case study
-
Kensington, London Kensington Olympia: a 400 sq m penthouse refurbished in 12 weeks as main contractor View case study
-
Design visual: Chelsea, London Sloane Place, Chelsea: restaurant, bar and guestrooms beside a members' club that stayed open, a project we took part in View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Restaurant fit-out in Glasgow: your questions
Do you fit out restaurants in Glasgow?
Yes. We take on selected restaurant, bar and pub projects in Glasgow as a UK design and build contractor. Our finished venues so far are in London, and we say so plainly. The same directors survey your unit in person and run it to opening night.
How long does a building warrant take in Glasgow?
Glasgow City Council's building warrants guidance says it aims to respond within 20 days; the real time depends on how complete the submission is. Where some details come later, a staged warrant can be used. We submit full drawings so the first report raises as few questions as possible.
Can you fit out a restaurant in a listed Merchant City building?
Yes. Listed buildings need listed building consent from Glasgow City Council under the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997, alongside the warrant. We survey the fabric first. Then the kitchen, bar and services are designed around the stone, cornicing and original openings.
How long does a restaurant fit-out in Glasgow take?
Our 83 sq m London restaurant took 4 weeks on site, and a 300 sq m pub took 10. Before site, allow time for the warrant, any planning or listed consent and long-lead kitchen equipment. Your opening date goes into the contract once we have surveyed.
What is in the free restaurant fit-out cost plan?
A costed outline of your venue by package: strip-out, kitchen and extract, bar and joinery, services and finishes. It comes with a draft programme to your opening date and the consents your unit needs. Send us the floor plan, a few photos and your target date.
Does a restaurant fit-out in Glasgow need a building warrant?
Usually, yes. Under the Building (Scotland) Act 2003, changes to layout, drainage, ventilation or escape routes need a Glasgow City Council warrant before work begins. When the work is done, a completion certificate has to be accepted before the venue can be occupied. We draw the warrant package and lodge the completion certificate for you.
What licences does a restaurant or bar in Glasgow need?
To sell alcohol, a premises licence from the Glasgow Licensing Board under the Licensing (Scotland) Act 2005. The application needs a planning certificate, a building standards certificate and, if you serve food, a food hygiene certificate. Glasgow expects the building standards certificate in hand before a full application, so the fit-out sets your licence date. A provisional licence can be sought earlier.Register the food business with Glasgow City Council at least 28 days before opening, as Food Standards Scotland guidance asks.
Can a kitchen extract run through a Glasgow tenement?
Often, and it is the item that decides whether a unit works. Hot-food flues on rear elevations go to Glasgow City Council planning as their own applications. We design the route, filtration and fan attenuation to meet that test, and prepare the application. Where the duct crosses common parts, the other owners may need to agree.
How much does a restaurant fit-out or refurbishment in Glasgow cost?
Most refurbishments come in between £1,225 and £1,710 per sq m ex VAT, with a new commercial kitchen at £2,430–2,880 per sq m of kitchen. We take on projects from £100,000 to £10M+. A flue, listed fabric or licence conditions add cost, which we price after the survey.
Which areas of Glasgow do you cover?
The whole city: the Merchant City and city centre, Finnieston and the West End, the Southside and the towns around Glasgow. Further east, see our Edinburgh page. Planning an office here instead? See our office fit out in Glasgow.
Read before you start
Restaurant kitchen fit-out, what drives a hospitality fit-out budget and licence for alterations explained. Our restaurant fit out across the UK service covers the rest. Nearby: Glasgow and Edinburgh.
What our clients say
See all reviews on Google-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Opening a restaurant or bar in Glasgow?
Send us the address, the floor plan and your target date. We survey the unit, then reply with the approvals it needs and a cost plan to open on time.



























