Office Fit Out in Knightsbridge
Your Knightsbridge office finished to a prime standard before your lease date, starting with a free consents check.
Our track record
100% of Craftex projects finished early against the programmeand within budget
What our clients get
- 3 weeksfor a full office refit in nearby Kensington, where the client's lease had five weeks left
- 12 weeksof nights and weekends to rebuild a 70 sq m reception at Portsoken House, every tenant at work
- 1,550 sq mof premium offices at Portsoken House, Aldgate, delivered in seven months with the rest of the building at work
- £10Mpublic liability insurance, with a further £10M for employers' liability
In Knightsbridge, the address sets the standard for the office
Savills found that financial firms took 68% of the office space let across Knightsbridge, Kensington and Chelsea in 2023.
Their visitors judge the room before the meeting starts. Many of these floors sit in period buildings, inside conservation areas, on either side of a borough boundary.
We take the consents, the interior fit-out and the build under one contract. The first step is a free check of what your address needs.
An address is enough to start. No drawings are needed for the consents check.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What an office fit out in Knightsbridge covers
Six parts, one contract and one team, whether you are moving into a new floor or refitting the one you have.
Space planning and design
Narrow plans, split levels and period rooms laid out so every team, meeting and visitor has its place. Proof: our own designers drew Portsoken House.
Strip-out and Cat B fit-out
Old partitions and ceilings out, then new rooms, floors, lighting and finishes built to the agreed plan. Proof: Beaumont House, opened up with frosted-glass rooms for private meetings.
Reception, boardroom and joinery
The rooms your clients see first, in stone, glass and joinery made to measure. Proof: Portsoken House, where we remodelled the entrance hall.
Services in period buildings
Power, air conditioning, ventilation, fire alarms and data threaded through old structures, then tested and certified. Proof: four floors re-serviced at Medusa, Knightsbridge.
Furniture and relocation
Desks, chairs and storage ordered to the programme, with your move planned alongside the build. Proof: Beaumont House, where we moved more than 150 staff.
Office refurbishment around your team
Zones handed back one by one, so the rest of the office keeps working and clients still visit. Proof: Portsoken House, its other floors let and working through seven months on site.
How it works
How we run a Knightsbridge office fit-out
01
Free consents check
Send the address, the floor size and your lease dates. A director checks the borough, the listing and the conservation area, then calls you.
02
Opening-up survey
We open up where we can, then agree the layout, the finishes and a timetable that works back from your lease date.
03
Approvals lodged
A licence pack for your landlord, estate consent where the freehold needs it, building control and any listed building application, all tracked by us.
04
Build to local rules
Most of the work is done by our own trades. Noisy tasks follow the council's permitted hours, and quieter fitting-out continues around them.
05
Signed-off handover
Systems commissioned, the snag list closed before you arrive, and a compliance file ready for your landlord and insurer.
The Craftex Guide to Office Fit-Out
Planning an office in Knightsbridge? The free guide sets out each stage of a fit-out, the decisions that shift the budget and a checklist to protect your date.
Our promises
Six promises for a Knightsbridge office, set out in the contract
Each one is a clause you can point to, not a line from a brochure.
-
A single accountable team
Design, approvals and construction sit with us under one contract, so blame has nowhere to go.
Portsoken House, drawn and built by Craftex.
-
The figure you sign holds
Any change is priced and agreed with you in writing before a single trade starts on it.
Every project to date finished within budget.
-
Your firm keeps working
Areas come back to you in sequence, and visiting clients never walk through a building site.
Portsoken House kept its tenants in the building through seven months on site.
-
Your lease date is protected
About 60% of the people on site work for Craftex, so the programme never waits on another firm's crew.
Beaumont House, where other contractors needed at least 12 weeks.
-
Accredited and insured
CHAS, SafeContractor and Constructionline accredited, with professional indemnity cover available on request.
-
Nothing left to chase
We hand over complete, with every test certificate, manual and as-built drawing together in one file.
Already have a quote? Send it to us. We'll beat it.
Been quoted for a Knightsbridge office already? Pass it to us. A director checks the scope and the timetable and tells you what he finds. A survey comes before our figure.
Compare your quotes
What derails a Knightsbridge office fit-out, and how we stop it
Six places where a Knightsbridge office fit-out goes wrong, and what we do about each.
| Area | The usual risk | With Craftex |
|---|---|---|
| Who answers | Architect, heritage adviser and builder hired separately, each defending their own part when a detail fails. | The design, the consents and the build sit in one contract, so the answer always comes from us. |
| The bill | Old wiring, uneven floors and hidden damage found after the ceilings come down, then priced as extras. | An intrusive survey comes before our figure, and nothing extra is built until you approve its cost. |
| Neighbours and noise | A plan to catch up at weekends, until the council points out that its rules forbid it. | Loud work is scheduled inside each borough's permitted hours from the start, so the programme already allows for them. |
| The date | Weeks lost while other firms' trades are booked, rebooked and turn up late. | Most of the labour is ours, so a gap in someone else's diary cannot stop the site. |
| Approvals | Listing, conservation area and estate questions raised only after the design is fixed. | We confirm the council, the listing and any estate consent first, then run building control, fire alarm and electrical sign-off. |
| The keys | A finishing list still open when clients start visiting the new office. | Snags closed, with O&M manuals, test results and record drawings handed over before your first meeting there. |
Office fit out cost in Knightsbridge, 2026
Guide rates per sq ft for a typical 5,000 sq ft Knightsbridge floor, before VAT and fees. No central London uplift is added; a survey sets your figure.
| Item | What it covers | Low to high spec |
|---|---|---|
| Cat B construction | Strip-out, partitions, ceilings, flooring, kitchen, finishes and alterations to building services | £63–108/sq ft (£678–1,165/m²) |
| Furniture | Desks, seating, boardroom tables and soft furniture | £18–54/sq ft |
| AV and IT | Boardroom screens, video calling, data and Wi-Fi points | £4.50–13.50/sq ft |
| Total | Build, furniture, AV and IT in one figure | £85.50–176/sq ft (£920–1,890/m²) |
| Project size | From a single townhouse floor to a whole building | £100,000 to £10M+ |
Period buildings often need more work behind the walls. Listed fabric, estate conditions and restricted working hours are priced once we have surveyed.
Dated 29 Oct 2026.
Free cost calculator
Estimate a Knightsbridge office fit out
Put in the square footage or the number of people, choose a finish level, and the range updates instantly.
Office work near Knightsbridge and across London
- Beaumont House, Kensington A fast-track office rebuild, after which the same client gave us a £1.3M second refurbishment in the building. View case study
- Portsoken House, Aldgate A full office fit-out: 1,550 sq m of premium offices over two floors, designed in-house. View case study
- Portsoken House Reception, Aldgate Structural remodelling, new shopfront glazing, Italian stone and joinery by a master craftsman. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Office fit out in Knightsbridge: what clients ask us
Have you worked in Knightsbridge before?
Yes. We designed and built the Medusa spa and beauty clinic here from concept. We also refurbished a 400 sq m penthouse at Kensington Olympia in 12 weeks, in a building that stayed occupied. Our office on Buckingham Palace Road is a short trip away.
Does a listed building or conservation area affect an office fit-out?
Yes, sometimes a great deal. Listed building consent covers interior work too, such as partitions, cornices and fireplaces, and working without it is an offence. In a conservation area, outside changes like plant, windows and signage get the closest scrutiny.
How much does an office fit out in Knightsbridge cost?
Cat B construction typically sits between £63 and £108 per sq ft before VAT, with furniture, AV and IT on top. Period buildings can add to that. We take on projects of £100,000 up to £10M and beyond. More on what drives office fit-out costs.
Do we need consent from our landlord or the estate?
Usually yes, and sometimes from both. Your lease will call for a licence for alterations, and an estate that owns the freehold may want to approve too. We prepare one set of drawings and specifications for all of them. Here is what a licence for alterations involves.
What does the free consents check include?
A director looks up your address against the listing register, the conservation area maps and the borough boundary, asks about your lease, then calls you. You pay nothing and sign nothing. Written advice follows a site survey.
Which council approves an office fit-out in Knightsbridge?
That depends on which side of the borough boundary you are on. Hans Town, around Sloane Street and Hans Place, is in Kensington and Chelsea. Albert Gate and Knightsbridge Green are in Westminster. We confirm it for your address first.
Can noisy work be done in the evenings or at weekends?
Not on the Kensington and Chelsea side. There, work audible beyond the site is limited to 8am to 6pm on weekdays, and never on Saturdays. Westminster sets its own rules, and we confirm them for your address before we programme the works. Read about keeping your office open during a refurbishment.
How long does an office fit out in Knightsbridge take?
Your date is written into the contract once we have surveyed the building. Consents and the landlord's licence can take longer than the works, so we start them early. Time is costly here: Knight Frank puts prime rent at £102.50 per sq ft. On a 5,000 sq ft floor, that is close to £10,000 a week.
Does an office fit-out need building regulations approval?
In most cases, yes. Because offices are covered by the Fire Safety Order, the rules call for full plans rather than a building notice. We prepare the application for the council or a registered approver. See the building regulations guide for office fit-outs.
Do you also refurbish homes, spas, shops and restaurants in Knightsbridge?
Yes, through our other services; this page covers offices only. See prime home refurbishment, high-end interior design, spa and salon fit-out, shop fit-out in London and restaurant and bar fit-out.
Read before you start
Cat A, Cat A+ and Cat B: the differences, fit-out contributions from your landlord, dilapidations when you leave an office and mistakes to avoid in office design and fit-out. Related service: Office fit out across London and the UK.
Nearby, we also fit out offices in Belgravia, Chelsea, South Kensington, Kensington and Mayfair.
What our clients say
See all reviews on Google-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Planning an office in Knightsbridge?
Send the address and your lease dates. A director checks what consents apply and rings you back.



























