Warehouse refurbishment in Basingstoke: a clear-span industrial hall under roof lights

Warehouse Refurbishment in Basingstoke

Your Basingstoke unit gains offices, a mezzanine or welfare while lorries keep loading, with sign-off and keys by your date.

Our track record

100% of projects finished ahead
of programme and within budget

What our clients get

  • 8 weekson site at Banbury, adding offices, welfare and racked storage while the 2,500 sq m warehouse kept working
  • 500 sq mdesigned, sent to building control and fitted out for Drake's in eight weeks
  • 60%of the labour on our sites is our own, so the programme never waits on another firm
  • £10Mpublic liability, matched by £10M employers' cover, with ISO 9001, 14001, 45001 and CHAS

Basingstoke needs more industrial space than it has, so get more from your unit

Basingstoke and Deane's draft Local Plan Update, consulted on in 2024, backs the intensification of existing employment sites so firms can expand.

The council's 2023 Economic Needs Assessment found a need for 99,000 sq m of new logistics floorspace and 24,000 sq m of industrial space.

New sites take years to arrive. Offices, a mezzanine or welfare inside your current shell can be ready far sooner, and our free check shows how.

Tired industrial hall before refurbishment: concrete columns, worn floor and roof lights along the ridge

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Warehouse fit out in Basingstoke: what we build inside your unit

From the first drawing to racking and final certificates, one contractor designs, builds and signs off the work. Drainage, extraction, fire alarms and emergency lighting come under the same contract. For units elsewhere in the country, see our warehouse refurbishment and fit-out service.

Glass-walled office built inside a Basingstoke warehouse

Warehouse office conversion

Part of the floor turned into offices, a reception or a training room, fire-separated from racking and stock. Proof: Drake's fitted offices and a studio into one 500 sq m arch.

Long steel-framed hall with raised steel walkways along both sides under a glazed roof

Mezzanine floors

Steel decks for picking, storage or offices, drawn with their stairs, guarding and fire protection, then sent to building control as full plans.

Staff lockers in a refurbished warehouse changing room

Welfare and changing rooms

Showers, lockers, WCs and a mess room sized for your busiest shift. Proof: at Banbury we added a changing room, lockers and a custom-made sink while staff worked on.

LED high-bay lighting over racking in a refitted industrial unit

Power, lighting and HV

Three-phase supplies, new boards, LED high-bays and high-voltage connections, each inspected and tested before use. Proof: every system in our Hackney unit runs from one high-voltage panel.

Roller shutter on a refurbished brick industrial unit

Shell, roof and EPC upgrades

Roof lights, insulation, cladding repairs, heating and controls: the measures an energy assessor recommends to lift a unit's rating before it is let.

Pallet-racking aisle with a clear route through a refitted warehouse

Strip-out, racking and loading

Old fit-out removed, then racking runs, barriers, marked aisles and dock doors planned around your vehicles. Proof: Banbury gained pallet racking and steel safety barriers.

How it works

Industrial unit refurbishment in Basingstoke: how a project runs

01

Free phasing check

Send us a floor plan, photos and your go-live date. A director reads them, then calls about phasing, approvals and cost drivers.

02

Survey before figures

We inspect the slab, roof, exits and incoming supply on site. Your written figure and programme come after the survey, not before.

03

Full plans submitted

Basingstoke's building control takes commercial work as full plans only. We prepare those drawings, the landlord's licence drawings and any planning application.

04

Zoned build

Each zone is screened, finished and handed back before the next opens. Dock doors and forklift routes stay clear every working day.

05

Certificates and keys

Every system tested and completion notified to building control. You get the test certificates and O&M manuals on handover day.

Free Craftex guide to warehouse fit out for Basingstoke occupiers

The Craftex Guide to Warehouse Fit Out

Our guide walks through layout, budgets and approvals for a unit that has to keep shipping. It ends with a checklist for protecting your go-live date.

Our promises

Six commitments in every Basingstoke contract

Agreed in writing before the first trade arrives, and kept until the final certificate.

  1. One firm answers

    Design, steelwork, services and approvals sit under one contract, so no fault is passed between trades.

    Drake's Finance and Operations Director: "I can't fault you guys."

  2. The agreed figure stands

    Changes are priced and signed off by you in writing before anyone builds them.

    Banbury came to us after we completed the same client's Kensington office.

  3. Loading carries on

    Zones, quiet hours and delivery windows are fixed with you in a written phasing plan before work starts.

    Portsoken House was built around occupied tenants, working nights and weekends.

  4. Your date holds

    Around 60% of our site labour is employed directly, so nothing stalls while we wait for outside crews.

    Drake's arch was handed over early.

  5. Insured and accredited

    Professional indemnity is available on request, alongside our liability cover. SafeContractor and Constructionline accreditation sit beside our ISO certificates.

  6. Nothing left to chase

    Test certificates, O&M manuals and the building control completion are dealt with before we leave site.

Sample quotation for a Basingstoke warehouse refurbishment

Holding another quote for your unit? Send it to us. We'll beat it.

A director compares its scope with your brief. We then survey the unit, and only after that is our figure put in writing.

Compare your quotes

Where Basingstoke warehouse refits slip, and how we prevent it

Six common failure points on an industrial refit, each matched with what we do instead.

AreaThe usual riskWith Craftex
Who answersSeparate contracts for the deck, the racking and the electrics, so every defect turns into an argument.Design, structure and services sit in one contract, and any fault is ours to put right.
The billA price set before anyone opened up the slab, the roof or the incoming supply.We survey first, then price each package before you sign anything.
Your loadingDocks blocked, dust on stock and drivers turned away.Screened zones and agreed delivery windows are written into the programme.
The dateTrades queuing for one another while go-live drifts.A single programme for all trades, planned backwards from your go-live date.
Building controlA deck or office built before full plans approval, so nobody may use it.Full plans go in early, and each inspection is booked into the programme.
HandoverOpen snags and manuals promised "to follow".Tested, documented and snag-free on the day you take the keys.

Warehouse refurbishment cost in Basingstoke, 2026

Indicative rates for a typical unit of 5,000 sq ft, excluding VAT and fees. Basingstoke is priced at national levels, with no London uplift.

ItemWhat it coversLow to high spec
Light refurbishmentRedecoration, LED lights, floor repairs, minor electrics and fire alarm updates£9–27/sq ft (£97–291/m²)
Standard fit-outUpgraded power, heating and ventilation, lighting design, WCs, welfare and loading doors£27–58.50/sq ft (£291–630/m²)
Fit-out with offices and welfareOffices, a kitchen, changing rooms and services renewed across the unit£37–85.50/sq ft (£400–920/m²)
Mezzanine floorSteel structure and deck only; stairs, guarding and anything built on the deck cost extra£72–180/m² of deck
Projects we take onFree check through to handover£100,000 to £10M+

Racking, sprinklers, extra incoming power and asbestos removal are priced per unit. A worn roof, a weak slab or a long cable route will move the figure.

Send us your floor area and go-live date. We survey first, and your written figure follows the survey. Dated 30 Oct 2026.

Free cost calculator

Work out a budget range for your Basingstoke unit

Type in your floor area and choose the closest scope to see an indicative range.

Add
Your estimateEnter your spaceex VAT and fees Get a free phasing and approvals check

Indicative, ex VAT and fees, for a sound shell with adequate power. Racking, sprinklers and mezzanines cost extra. Basingstoke is outside Greater London, so no London factor applies.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Warehouse refurbishment in Basingstoke: your questions answered

Are you warehouse refurbishment contractors for Basingstoke?

Yes, for selected projects in Basingstoke and the rest of north Hampshire. Craftex is a design and build contractor based in London, and every unit is surveyed in person before we price it. We have not yet completed a warehouse in Hampshire; our warehouse projects are in London and Oxfordshire.

Do mezzanine floors in Basingstoke need planning permission?

Not usually, if the deck sits entirely inside the building. Purely internal works are not development under planning law. The exceptions are more than 200 m² of added floor space in a retail building selling goods, and conditions on your existing consent. External changes or a change of use go to Basingstoke and Deane Borough Council.

Can our warehouse keep loading during the works?

In most units, yes. We screen off one zone at a time, keep dock doors and forklift routes clear, and move noisy tasks away from your peak hours. Read how our Banbury warehouse fit-out ran while the client's team kept working.

How much does warehouse refurbishment cost in Basingstoke?

Light refurbishment starts at about £9 per sq ft. A full fit-out with offices and welfare reaches about £85.50 per sq ft, ex VAT. Mezzanines are priced per m² of deck, and we take on projects from £100,000.

What is the free phasing and approvals check?

You send us your floor plan, some photos and the date the space must go live. A director reads them, then phones you about phasing around loading, which approvals apply and what will drive the cost. It is free and commits you to nothing. A written figure comes only after a survey.

Does a warehouse fit-out in Basingstoke need Building Regulations approval?

Usually, yes, if you add a mezzanine or offices or change escape routes. Basingstoke and Deane's building control team accepts commercial work only as a full plans application. A registered building control approver is the alternative. We prepare the drawings and book every inspection.

Will a new mezzanine raise our business rates?

It may. The Valuation Office Agency values mezzanine space as a separate line within a rateable value, so a new deck can increase it. Give your rating adviser the deck area before the design is fixed.

How long does a warehouse fit out in Basingstoke take?

Scope, the state of the shell and approvals set the length. Our Hackney fit-out took four weeks on site; Banbury's 2,500 sq m warehouse and Drake's took eight. The council says its completion certificate should follow within two weeks of completion. We fix the end date in the contract once the survey is done.

Can we let a Basingstoke unit with an EPC below E?

No, unless a valid exemption is on the PRS Exemptions Register. Since April 2023 the E minimum has covered every privately rented commercial property, including existing lets. We build the improvements your energy assessor recommends; we do not issue EPCs.

Which parts of Basingstoke and Hampshire do you cover?

All of Basingstoke and Deane, from Daneshill and Houndmills to Kingsland, Viables, Chineham and Basing View, served by junctions 6 and 7 of the M3. We also cover warehouse refurbishment in Surrey and commercial fit-out in Reading.

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Got a Basingstoke unit that needs more from its floor space?

Tell us the estate, roughly how much floor you have and when it must be ready. A director reviews it personally, then phones you.