Restaurant Fit Out in Leicester
Your Leicester restaurant or bar, built by one team and ready for opening night. First step: a free cost plan.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 4 weeksfrom strip-out to a restaurant ready to open, 83 sq m
- 10 weeksto refurbish a 300 sq m pub, handed back snag-free
- 60%of the labour on our sites is our own, so your opening date never waits on another firm
- £10Mpublic and employers' liability cover, ISO and CHAS accredited
Opening in Leicester? Your licence and your build run on one clock.
A new premises licence in Leicester is open to objections for 28 days. The plan you submit has to match the room that gets built.
So we draw the licence plan, the building control package and the build from one set of drawings. Our own trades then carry around 60% of the work.
Send us the floor plan and the date you want to open. Free, with no obligation.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Hospitality Fit Out Leicester: every trade, one contract
A single team designs, builds and certifies your venue, and handles the licence plan and consents alongside. Pubs, cafés and late-night bars come under the same contract too. See the full restaurant and hospitality fit out service.
Concept and covers
Dining room, bar and kitchen laid out with your chef for covers, service speed and the licence plan.
Kitchen, extract and gas
Canopy, odour control, gas interlock and cold rooms, with a flue route that planners and neighbours accept.
Bars and joinery
Counters, back-bars and booths made by our own joiners around the way your team serves.
Period and listed units
Georgian and Victorian buildings around St Martin's and Market Street, repaired and reused with consent in place.
Services, fire and lighting
Power, ventilation, fire alarm and emergency lighting, tested and passed by building control.
Shopfront and washrooms
Shopfront, entrance, host stand and accessible washrooms, finished to match the dining room.
How it works
Restaurant Refurbishment Leicester: five steps to opening night
01
Survey and brief
We start with your opening date and budget. Then we survey gas, drainage, power and where a kitchen flue can rise.
02
Design and cost plan
Our team draws the layout, kitchen and bar. The people who will build it then price each package.
03
Consents and licence plan
Building control package, planning or listed consent where needed, and a licence plan that matches the build.
04
On site
Strip-out, kitchen, bar and finishes run side by side by our own trades. Noisy work is kept away from neighbours' quiet hours.
05
Sign-off and handover
Every system tested, completion certificate secured, nothing left to snag. Your insurer, landlord and licensing file get every certificate.
The Craftex Guide to Restaurant, Bar and Pub Fit Out
How to line up design, kitchen, consents and build so your venue is ready before the first booking.
Our promises
Six promises in every Leicester contract
Agreed in writing before the first wall comes down.
-
One team, start to finish
Design, kitchen, bar, consents and build answer to one director, from the first survey to the last certificate.
Medusa, Knightsbridge: four floors stripped out and rebuilt in 17 weeks.
-
The agreed figure stands
A fixed figure for a written scope. Changes are costed and signed off in writing before work starts.
100% of projects on budget.
-
Trading where it can
Phased areas and night work keep a live venue serving where the layout allows.
Sloane Place, a project we took part in, beside a members' club that stayed open.
-
Ready for opening night
Our own trades carry around 60% of the work, so the programme never waits on strangers.
Kensington Olympia: 400 sq m refurbished in 12 weeks.
-
£10M cover on every venue
£10M public and £10M employers' liability, professional indemnity on request. Accredited to ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Nothing to snag
We hand over a finished venue. Gas, electrical, fire, emergency lighting and extract certificates arrive with the health and safety file.
Kensington Olympia: handed over without a single snag or defect.
Already priced elsewhere? Send us the quote and we'll beat it.
Send us the quote for your Leicester venue. We survey the venue, then reply with a better figure for the same scope and a programme back from your opening date.
Compare your quotes
Restaurant Shopfitters Leicester: the usual risks, our answer
| Area | The usual risk | With Craftex |
|---|---|---|
| Who answers | Designer, shopfitter and kitchen supplier each blaming the others when the extract fails | One team designs, fits and commissions every part, and answers for all of it |
| The final bill | A number given before anyone has opened up the old floors and walls | We open up and survey before we price, so the cost plan fits the building you actually have |
| Rent before opening | Weeks of rent and wages on a unit that cannot take a booking | A programme that starts from your opening night and works backwards, with our trades in parallel |
| The licence | A licence plan that no longer matches the room, discovered at the hearing | Licence plan, building control drawings and build all come from one drawing set, so they agree |
| Compliance and sign-off | Gas, fire and extract sign-offs left for you to follow up | Every approval and certificate your council, landlord and insurer ask for, handled by us |
| Handover | Opening week lost to snag lists and missing paperwork | Day one: a venue with no snags and the complete certificate file in your hands |
Restaurant Fit Out Leicester: 2026 cost guide
Our 2026 indications, per sq m, for a typical Leicester venue of 150 sq m, ex VAT, fees and loose furniture.
| Scope | Indication |
|---|---|
| Restaurant, bar or pub refurbishment | £1,225–1,710/m² (£114–159/sq ft) |
| Commercial kitchen with equipment | £2,430–2,880/m² of kitchen |
| New-build restaurant or pub | £2,295–2,700/m² (£213–251/sq ft) |
| Projects we take on | £100,000 to £10M+ |
Based on a sound building. A new flue, steelwork, listed fabric or licence conditions are added after the survey.
Send us the floor plan and opening date for a costed plan and programme.
Free cost calculator
What will your Leicester restaurant or bar cost to fit out?
Enter the floor area, pick a scope and see an instant 2026 range.
Prime interiors we have delivered
- Knightsbridge, London Medusa, Knightsbridge: a four-floor spa and salon, taken back to shell and rebuilt in 17 weeks View case study
- Kensington, London Kensington Olympia: a 400 sq m penthouse refurbished and handed over with no snags View case study
- Chelsea, London Sloane Place, Chelsea: a project we took part in, with restaurant, bar and guestrooms next to a working members' club View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Bar Fit Out Leicester: your questions answered
Do you fit out restaurants and bars in Leicester?
Yes. We take on restaurant, bar and pub fit-outs in Leicester and Leicestershire as a UK design-and-build contractor. Our completed venues to date are in London, and we say so openly. A director surveys your unit in person and stays with it until opening night.
Does a restaurant fit-out in Leicester need building control approval?
Usually, yes. New drainage, ventilation, structural openings, escape routes and accessible toilets normally fall under the Building Regulations. Approval comes from the council's building control team or a registered building control approver. A full plans application must be decided within five weeks, or two months if you agree. We prepare the package and obtain the completion certificate.
Can you fit out a restaurant in a listed building in St Martin's or the Cultural Quarter?
Yes. St Martin's lies in the Greyfriars conservation area and includes listed 18th-century buildings. Under the Planning (Listed Buildings and Conservation Areas) Act 1990, work affecting a listed building's character needs listed building consent first. In the Cultural Quarter and around Market Street, we check each building's status at the survey. The kitchen, bar and services are then planned around the original fabric.
How much does a restaurant fit-out in Leicester cost?
Our 2026 indications for a refurbishment run from £1,225 to £1,710 per sq m, ex VAT. A new commercial kitchen adds £2,700–3,200 for each sq m of kitchen. Venues start at £100,000 and run up to £10M+. An external flue, listed fabric or licence conditions are priced once we have surveyed.
Can you refurbish a Leicester restaurant while it keeps trading?
Often, yes, where the layout allows. We split the work into zones, run noisy trades out of hours and keep one area serving while another is built. On Drake's flagship on Savile Row, 8 weeks of works on site ran while the shop traded. The phasing is agreed at the survey, before any price is fixed.
What licence does a restaurant or bar in Leicester need?
A premises licence from Leicester City Council under the Licensing Act 2003, to sell alcohol or serve hot food after 11pm. The application carries a plan of the venue and is open to objections for 28 days. A valid objection usually means a hearing, which can move your opening. Alcohol sales also need a designated premises supervisor with a personal licence.
Do I need planning permission for a kitchen extract in Leicester city centre?
Usually, yes, when the flue runs up the outside of the building. Planners weigh smell, noise and appearance, and flats above often decide the case. In a conservation area the look of the duct counts for even more. We design the route, filters and fan silencing, then prepare the application. Turning a shop into a bar needs planning consent too.
How long does a restaurant fit-out in Leicester take?
On site, 17 weeks for the four-floor Medusa spa and salon and 12 weeks for the 400 sq m Kensington Olympia penthouse, both in London. Before that, allow for building control, any planning or listed consent, and kitchen equipment lead times. Register the food business with Leicester City Council at least 28 days before you open. After the survey, your opening date is written into the contract.
What is in the free restaurant fit-out cost plan?
Your venue priced by package: strip-out, kitchen with extract, bar joinery, services, finishes. A draft programme runs back from your opening date, beside a list of the consents the unit needs. Send the floor plan, a few photos and the date you want to open.
Which towns around Leicester do you cover?
The whole city, from St Martin's, the Cultural Quarter and Highcross to the Golden Mile on Belgrave Road. Around it: Oadby, Wigston, Loughborough, Hinckley, Market Harborough and Melton Mowbray. In Leicester we took part in Leicester One, a city-centre student residence. For the full service, see our restaurant fit out across the UK.
Read before you start
Start with our kitchen and extract guide, then licence for alterations explained and what drives a hospitality fit-out budget. Nearby: Birmingham and our Glasgow restaurant fit out.
What our clients say
See all reviews on Google-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Taking a restaurant unit in Leicester?
Tell us the address, send the floor plan and name your opening date. We survey the unit, then come back with the consents it needs and a costed plan.



























