Skip to content
Request a callbackCallback
Contemporary brick apartment development with planted terraces beside a London park, the Shard behind

Property Development Partner

Your site taken from first appraisal to consent, built and let or sold, by one accountable partner who builds.

Our track record

100% of projects delivered ahead
of programme and on budget

Rob Barton, Development Director: his track record

  • 3,985homes delivered
  • 11,127homes through planning
  • £228Mof land acquired
  • £6Mscheme of flats Craftex found in a derelict club, Allitsen Road

A development partner who also builds

Craftex is a London property development company and development partner for landowners, investors and family offices across the UK. We appraise sites, take them through consent and build schemes from £3M to £150M GDV with our own construction team. For funding, we introduce you to the lenders we work with on our own projects. Your first step is a free site appraisal from a director.

Contemporary white apartment blocks beside the Battersea Power Station chimney under soft cloud, London
Aerial view of 74 Allitsen Road, St John's Wood: the corner building

You own a site, a vacant building or an asset that could earn more. We are a property development partner that works alongside you rather than buying you out. Depending on the stage we co-invest, take the risk ourselves, or act for you on agreed terms.

The difference is construction. Every appraisal is priced by the team that would build the scheme, before you commit. On Allitsen Road, a derelict club in St John's Wood, our feasibility study found a £6M scheme of flats. See how we work as a development partner for landowners or a construction partner for developers and investors.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Where is your project? Every development service, by stage

Start from where your site stands today: land you own, a scheme to consent, a deal to fund or a building to deliver.

Architect's timber massing model of a building with model trees on a studio table

Feasibility and site appraisal

What your site can carry, cost and be worth, every option costed unit by unit before you commit.

Aerial view straight down on a large residential development site with cranes and cleared ground between blocks

Sell, option or promotion

Keep the upside or take the cash: the land deal structured around your goals, explained in plain English.

Two people in business dress reviewing a document together at a white boardroom table, faces out of frame

Joint venture and partnership

Your site, our team and capital: profit shared on written terms, one party accountable for delivery.

Hand-drawn architectural massing sketches and plan studies on loose sheets across an oak desk

Planning and consent

Pre-application to decision, with affordable housing, CIL and conditions costed before anything is submitted.

Two concrete-frame residential blocks under construction with three tower cranes against a clear sky, London

Employer's agent & development management

We run the scheme for you: design team, lender reporting, procurement and programme, one director answerable. For funding, see property development finance.

Brick Victorian warehouse building with modern residential additions in front of the City skyline, London

Conversion and airspace

Offices, warehouses and clubs turned into homes; roof storeys added above existing London buildings.

How it works

How does a scheme run with us?

01

Free site appraisal

A director looks at the site, the planning history and the street, and tells you whether it is worth pursuing. No charge.

02

Feasibility study

Design options drawn and priced by our build team, GDV tested against local sales, risks owned, programme issued.

03

Deal and consent

Sale, option, promotion, partnership or fee basis agreed in writing, then the preferred scheme taken through planning.

04

Build

Our own team delivers the scheme to the number and the date in the contract, with changes priced before the work.

05

Let, sell, aftercare

Handed over let-ready or sale-ready with every certificate, then we stay on hand for the next scheme.

Cover of the free Craftex Development Feasibility Checklist

The Craftex Development Feasibility Checklist

Test a London site before you buy or apply. The checklist covers title and planning checks, GDV and residual land value logic, cost drivers and statutory periods. It ends with a go or no-go scorecard.

Our promises

Six promises, written into your contract

Not marketing lines. These go into your contract on every scheme.

  1. One partner from appraisal to keys

    Feasibility, planning, design, construction and handover under one appointment, so nothing falls between consultants.

    Four options to a deliverable programme in one study

  2. Builder's numbers at feasibility

    Every cost plan comes from our own construction team, worst case included.

    Around 60% of our labour is in-house

  3. We will advise against our own upside

    If the biggest scheme is not the best one, we say so.

    The most expensive option rejected on our advice

  4. Ahead of the date you need

    Programme set at feasibility and beaten on site.

    100% of our projects finished ahead of programme

  5. Your building keeps earning

    Works phased around tenants and trading.

    Portsoken House, seven months of fit-out around occupied tenants

  6. A finished building and a complete file at handover

    Every certificate in the file, backed by £10M cover.

    ISO 9001, 14001, 45001, CHAS, £10M public and employers' liability

Example development quotation from another firm with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Send the appraisal, land offer or tender you have been given. A director reads it line by line. Then we beat it: a better deal for your land or building, or a lower figure for the same build.

Compare your quotes

Where does property development usually go wrong?

Hold any quote up against this. The risks are the same on every project; who carries them is not.

AreaThe usual riskWith Craftex
ResponsibilityA planner, an architect, a QS and a contractor, each paid separately, none accountable for the result.One appointment and one director accountable for the scheme from the first appraisal to the keys.
The final billAn appraisal built on benchmark rates, then real tender prices after you have bought the site.Cost plans priced unit by unit by the people who build, before you commit.
The dateA planning timetable nobody controls and a build programme taken from the contractor's tender.Statutory periods, lead times and sequencing in one programme, issued with the feasibility and tracked weekly.
DisruptionWorks start and the income from the building stops with them.Phased floors, out-of-hours shifts and protected access agreed before anyone arrives on site.
ComplianceAffordable housing, CIL, conditions, Building Regulations and the lender's pack discovered late.Every obligation modelled per option before submission and every approval and certificate run by us.
HandoverA snag list that delays completion, the valuation and the first letting.A clean building on the day, O&M manuals and the health and safety file ready for the valuer.

How do you pay for each stage?

How we are paid depends on the stage you are at. We co-invest, take the full risk, or act on a fee or partnership basis agreed project by project.

ServiceWhat it coversBasis
Free site appraisalA director's view of what the site could support and whether it is worth pursuingNo charge
Feasibility and costing studyDesign options, unit-by-unit cost plans, GDV appraisal, risk register, programmeAgreed project by project, enquire
PlanningPre-application, submission and management to decisionAgreed project by project, enquire
Development managementThe whole scheme run for you, design team to handoverAgreed project by project, enquire
ConstructionDesign and build of the consented scheme by our own teamLump sum from the cost plan once the design is fixed

We never publish fees or percentages; terms are set per scheme and written into the contract.

Commercial property development

Commercial development is where an office, shop or mixed-use building stops earning and needs a new plan. We look at three routes and price each one in-house.

Sunlit Portland stone facade of a period London office building with tall windows and carved detailing

Reposition and refurbish

Keep the commercial use and bring the building back to the standard tenants now expect. See commercial fit-out and refurbishment.

Change the use

Move offices, shops or pubs into the use the site supports best, with the consent route tested first. See change of use planning permission.

Convert to homes

Turn a commercial building into flats, consented, built and ready to sell or let. See commercial to residential conversion.

What earlier schemes teach about the risks: lessons from commercial property redevelopment and repurposing.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Property development: your questions

What does a property development company do, and why choose one who builds?

A property development company takes a site or building through appraisal, consent, construction and sale or letting. Many hire a contractor at the end and discover the real prices then. We price every option with our own build team at feasibility, so you see real build costs before you commit.

How does a development partnership or joint venture work?

You bring the site, we bring the team and, where agreed, the capital. Profit is shared on written terms and one party is accountable for delivery. The agreement fixes who funds what, who decides what, and how each side exits. Our guide to how a joint venture agreement works covers the key clauses.

What size of scheme do you take on, and where?

Development schemes from £3M to £150M GDV, and construction from £100,000 to £10M and above. Typical work is a derelict or underused building turned into flats, a whole-building conversion or a rooftop addition. London is our core market, with selected projects in the South East and major UK cities.

How long does it take from site to finished building?

It depends on the site and the consent route, and we programme each stage from the start. A council has 8 weeks to decide a planning application, or 13 for major development, unless a longer period is agreed in writing. On Allitsen Road, four costed options were issued in four weeks. The target from technical design to keys was 17 months, issued with the study.

Do you work with investors, family offices and build to rent?

Yes. For investors and family offices we act as the operating partner: one director accountable from appraisal to keys. Build to rent schemes are appraised on rental yield rather than sales values, with the management model designed in from the start.

Do you develop outside London, for example in Kent or Essex?

Yes, when the scheme fits our range of £3M to £150M GDV. London comes first, and we take on selected sites across the South East and in major UK cities. Send the address and a director will tell you whether we are the right team for it. For landowners and investors we have pages on property developers in Kent and property developers in Essex.

Can you help fund my development?

We do not lend and we do not set terms. Our introductions are to lenders we already work with on our own projects. We prepare the appraisal, cost plan and programme that lenders generally ask for. On the right scheme we can also co-invest or take the risk as your partner. See property development finance.

I own a site or building in London. What can I build on it?

Usually more than the current use suggests: an extra storey, a change of use, a conversion to flats, or a new building. The answer sits in the planning history, the street's precedents and the policy for your borough. Read what you can build on your land, then book a free appraisal.

Should I sell my land, or sign an option or promotion agreement?

Sell if you want certainty now. An option gives a developer the right to buy later, usually after planning, at an agreed basis. A promotion agreement has the promoter fund planning and share the sale proceeds. Each suits a different goal; we set them out plainly and you take independent legal advice.

How do you work out what my site is worth?

By residual value: the gross development value of the finished scheme less build cost, fees, finance and the developer's margin. The build cost comes from a unit-by-unit cost plan, not a rate per square metre. Our explainer on development appraisal and residual land value shows the arithmetic.

How are you paid as a development partner?

It depends on the stage and the risk. We can co-invest, take the whole risk, or work on a fee or profit-share basis. Terms are agreed per scheme and written into the contract before anything starts. We do not publish percentages because no two sites carry the same risk.

I already have planning permission. Can you just build it?

Yes, as design and build contractor. We re-check the consent and conditions, price the scheme unit by unit, fix the programme and deliver it with our own team. If the approved scheme leaves value on the table, we will tell you before you build it.

How do I invest in a property development?

The common routes are a joint venture with a developer, lending to a scheme, or a pooled fund. You can also buy a site and appoint a partner to deliver it. Before you commit money, check the developer's finished schemes, who carries the risk and what security you hold. Learn the warning signs in property development investment scams and read about buying property through a company or SPV. This is not financial advice; take independent regulated advice before you invest.

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Tell us about your site

Send the address, what you own and what you would like it to become. A director will review the planning history, and we call you back within one hour, Monday to Saturday, 8am to 6pm.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us