Services · Planning
Planning decides what a building or plot can become — and therefore what it is worth. Craftex helps owners, investors and developers find the right planning route, secure consent and then build the approved scheme, with one team responsible from the first assessment to handover.
Most planning consultants stop at the decision notice. We are also a London design and build contractor, so every scheme we take to planning is designed to be buildable and costed with real contractor rates — no surprises between consent and construction.
The right route depends on the building, its location and what you want to do. Choosing the wrong one wastes months. These are the routes we assess for every site:
We check the planning history, conservation status, listings and Article 4 directions for your address before recommending a route.
Large parts of central and west London sit in conservation areas or include listed buildings, and many boroughs — including Westminster, Kensington and Chelsea and Camden — have detailed policies on basements, roof extensions and changes of use. Estate landlords such as Grosvenor, Cadogan, Howard de Walden and Portman add their own consent processes. We plan for these from the start so that the planning strategy, landlord approvals and programme line up.
Not sure which route your site needs? Send us the address. We check the planning history, constraints and likely route, and tell you honestly whether it is worth pursuing.
Ask for a free assessmentIt depends on the building, its use, its location and any Article 4 directions. We check this for your address; where PD applies we can apply for a Lawful Development Certificate so you have proof.
The statutory target is 8 weeks for minor applications and 13 weeks for major ones, and 56 days for many prior approvals. Preparation, pre-application advice and negotiation add to this, so we give you a realistic timeline at the start.
It is a permitted development right allowing certain commercial, business and service buildings to change to residential, subject to prior approval of matters such as transport, noise, natural light and flooding. Some London areas restrict it through Article 4 directions.
Possibly — through Class AA prior approval for some buildings, or through full planning. Structure, access, neighbours and design all matter; our airspace study tests this before you spend on design.
Yes, if the works affect the character of a listed building — listed building consent covers interiors as well as the exterior.
We review the reasons, amend the scheme where sensible and resubmit, or advise on whether an appeal is worthwhile.
Yes. Craftex is a design and build contractor, so we can take the consented scheme through technical design and construction.
Fees depend on the size and complexity of the project and the reports needed. We start with a free Development Potential Assessment and then quote a clear fee for the planning stage.
We take on planning and development projects across London and selected UK cities. Local guides:
Send us the address and a short description. We will check the planning position and come back with an honest view of what is possible.
Get a free Development Potential Assessment info@craftex.co.uk