Cat A Fit Out Cost in 2026: Price per sq ft, What It Includes and What Moves It

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read

Empty open-plan office floor with a suspended ceiling grid, recessed LED panels, white columns and a polished tiled floor

The short answer

A Cat A fit out of an office floor costs about £483 to £1,040 per m² (£45 to £97 per sq ft) with Craftex, from reinstatement with services kept to a full floor with new air conditioning (our 2026 rates, ex VAT and fees). Knight Frank prices Central London office floors at £110 per sq ft, and £175 to £300+ once common parts and plant are included.

  1. Air conditioning and ventilation is £50 of the £110; stripping out the old fit-out is £10.
  2. £175 adds the common parts, £275 adds the main plant and £300+ includes EPC upgrades.
  3. Outside London the same works cost 10% to 30% less, but a small building can carry a premium.

Knight Frank prices a Central London Cat A fit out at about £110 per sq ft for the office floors in 2026. That excludes VAT and professional fees. Add the common parts and main plant and a landlord's refurbishment runs from £175 to £300+ per sq ft.

This guide is for the landlord, asset manager or developer budgeting a vacant floor to let. It also helps a tenant planning an office fit-out check what the landlord should hand over. The figures are published benchmarks from Knight Frank and Laxton's, not Craftex rates.

We deliver Cat A fit out for landlords across London. Pricing a floor now? Send us the plans for a free schedule costing.

Cat A fit out cost per sq ft in 2026

Knight Frank's Landlord Refurbishment Cost Guide for Spring 2026 prices the office floors of a Central London refurbishment at £110 per sq ft. Its programme page describes that scope as "Cat A" to office floors.

Cat A office floor cost per sq ft, Central London, Spring 2026 (Knight Frank, excluding VAT and fees)
Element£ per sq ft
Strip out existing fit-out£10
Raised access floor (refurbish)£5
Suspended ceiling or soffit treatment£12
Decorations£3
Joinery and window treatment£5
LED lighting, power and fire alarms£25
Air conditioning and mechanical ventilation£50
Total office floors£110

Contractor preliminaries, overheads, profit and risk are included. VAT, professional fees, section 106, community infrastructure levy, rights of light and utility upgrades are not.

Laxton's Building Price Book 2026 gives a cross-check, per m2 across the UK. Basic office refurbishment is £1,000 to £1,650, about £93 to £153 per sq ft.

High quality refurbishment including air conditioning is £1,200 to £1,800, about £111 to £167 per sq ft. Knight Frank's £110 sits at the bottom of that range. The guides use different bases, so treat them as a check, not a match.

What sits inside a Cat A price

A Cat A fit out is the landlord's work that makes an empty floor lettable. No law defines it. The industry reference for office specification is the BCO Guide to Specification, so always check the landlord's own schedule.

Here is what each Knight Frank line pays for:

  1. Strip out, £10. Taking the previous occupier's fit-out back to the base floor. See office strip-out costs and process.
  2. Raised access floor, £5. Refurbishing the floor void that carries power and data.
  3. Ceiling, £12. A suspended ceiling, or treatment of the soffit where the ceiling is left open.
  4. Decorations and joinery, £8. Paint, joinery and window treatment such as blinds.
  5. Lighting, power and fire alarms, £25. LED lighting, small power and the alarm.
  6. Air conditioning and ventilation, £50. Heating, cooling and fresh air, nearly half the total.

Cat A leaves out the rooms, the kitchen, the furniture, the IT and the branding. That is Cat B, built by the tenant. Our Cat A vs Cat B fit out guide shows where the line falls. For the occupier's side of the budget, see office fit out cost per sq ft.

Knowing the number is the first step. Our Cat A fit out for landlords team prices your floor element by element, free, from your plans.

Floors only, or the whole building: three budget levels

The £110 covers the office floors only. A landlord refurbishing a whole building adds the common parts the next tenant walks through, and then the plant behind them. Knight Frank prices three schemes.

Glazed office lobby with white drum-topped columns, a polished reflective floor and a curved glass wall
Three landlord refurbishment budget levels, Central London, Spring 2026 (Knight Frank; last row our 2026 rates; excluding VAT and fees)
Scheme£ per sq ftWhat it covers
Floors and common parts£175Office floors £110 plus common parts £65
Plus main plant£275The £175 scheme plus plant £100
With EPC upgrades£300+The £275 scheme with sustainability and EPC upgrades included
Our 2026 rates, Cat A office floor£45 to £97Craftex: reinstatement with services kept to a full floor with new air conditioning, office floors only
£110per sq ft, office floors only
£175per sq ft, floors plus common parts
£300+per sq ft, with plant and EPC upgrades

Common parts are £65. WCs are £25, remedial works to the fabric including scaffold £15, reception £10, amenity space £10 and staircases and lift lobby £5. An incoming tenant judges the WCs and reception first.

Main plant is £100. The largest items are lifts, air conditioning plant and main electrical plant at £20 each. Air source heat pumps and sprinkler tanks and pumps are £10 each. Controls, security, the fire alarm panel and boilers make up the rest.

Options sit on top. Core alterations are £25 to £50 per sq ft, a new facade or windows £20 to £100 and a communal terrace £10 to £25.

What pushes a Cat A fit out cost up or down

The benchmark is an average. Six things move your own number, and a survey of the floor settles each one.

  1. Services retained or replaced. Air conditioning and ventilation is £50 of the £110. Keeping sound plant moves the total more than any other decision.
  2. Condition of the floor. Knight Frank prices the raised floor as a refurbishment at £5. A floor that needs replacing, or a ceiling that must be rebuilt, costs more.
  3. Size of the building. Buildings below 50,000 sq ft may carry a cost premium.
  4. Occupied building and working hours. Other tenants set the hours for noisy work. At Portsoken House the remaining floors were let, so the noisy work ran at nights and weekends.
  5. Region. Knight Frank takes 10% off the South East and 20% off the Midlands and East Anglia. The North West, North East and Scotland are 25% lower, and Wales 30%.
  6. EPC target. A let non-domestic floor needs at least EPC E unless an exemption is registered. A floor that falls short needs the upgrades priced into the £300+ scheme.

Our guide to MEES and EPC rules for commercial landlords explains what the rating requires. Check the fees, section 106, CIL and utility upgrades, too. Every benchmark here excludes them.

I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

Artur Dvorak, Google reviewSee all reviews on Google

Cat A, Cat A+ or straight to Cat B

Cat A leaves the next tenant a blank floor. Cat A+ adds desks, a few meeting rooms and a tea point, so a small team can move in within weeks. Cat B is built to one occupier's layout.

Knight Frank lists a turnkey Cat B fit out including furniture as an option in a landlord's refurbishment, at £100 to £200 per sq ft. That is on top of the Cat A. A landlord who builds it carries the risk that the layout does not suit the tenant who signs.

A common answer is to build the Cat A and offer a contribution to the tenant's Cat B. Our landlord fit-out contribution guide covers how that is agreed. The licence for alterations then governs what the tenant may build.

Budgeting a vacant floor in five steps

A budget the agent can quote needs a floor behind it. These five steps get there.

  1. Gather the plans and the schedule. Floor plans, the last Cat A specification and the current EPC.
  2. Survey the floor. Check the raised floor, ceiling, plant and fire systems against the specification.
  3. Cost by element. Price each line of the table above for your building, not an average.
  4. Fit the programme to the marketing date. Count back from the date you want to show the floor.
  5. Decide the level. Floors only, floors with common parts, or the whole building with plant and EPC works.

The programme matters as much as the number. Knight Frank's programme for a whole-building scheme up to 50,000 sq ft is 39 weeks of design and procurement and 39 on site. A single floor with sound services is much shorter.

At Beaumont House, 750 sq m was fitted out in three weeks, on a floor whose base services were already there.

Portsoken House is the other end of the range. A full office fit-out from scratch: 1,550 sq m in seven months, with a full mechanical and electrical package. See the Portsoken House case study.

That was one project, not a rate. Each floor is priced from its own survey. Send us your plans for a free schedule costing and we cost it element by element.

  • The landlord's Cat A specification, in writing
  • Floor plans and the area of each floor
  • The current EPC and any registered exemption
  • The age and condition of the air conditioning plant
  • Whether neighbouring floors stay occupied during the works
  • The date the floor must be ready to show
  • A list of what the previous tenant left behind

Frequently asked questions

How much does a Cat A fit out cost per sq ft?

Knight Frank's Spring 2026 guide prices the office floors of a Central London Cat A refurbishment at £110 per sq ft, excluding VAT and fees. With common parts the total is £175 per sq ft, with main plant £275 and with EPC upgrades £300+. Outside London the guide's regional map takes 10% to 30% off.

What is included in a Cat A fit out cost?

The office floors: strip out, raised access floor refurbishment, ceiling or soffit treatment, decorations, joinery and window treatment, LED lighting, power and fire alarms, and air conditioning with mechanical ventilation. Contractor preliminaries, overheads, profit and risk are included. VAT, professional fees, section 106, CIL, rights of light and utility upgrades are not.

Is Cat A or Cat B more expensive?

Neither is always dearer. Knight Frank prices Cat A office floors at £110 per sq ft and a turnkey Cat B including furniture at £100 to £200. Cat A follows the building's plant and services. Cat B follows one occupier's layout, finishes and furniture.

Who pays for a Cat A fit out?

Usually the landlord, because Cat A is what makes a floor lettable to anyone. The lease and the heads of terms decide, though, and a landlord may offer a contribution or rent-free period instead of building it. Agree this before the lease is signed.

How long does a Cat A fit out take?

It depends on the floor and how much plant is replaced. Knight Frank's indicative programme for a whole-building refurbishment up to 50,000 sq ft, with new plant and a terrace, is 39 weeks of design and procurement and 39 weeks on site. A single floor with sound services is far shorter. A survey fixes the figure.

Does a Cat A fit out cost more in London?

Yes. Knight Frank uses Central London as its base and takes 10% off for the South East, 15% for the South West, 20% for the Midlands and East Anglia, 25% for the North West, North East and Scotland, and 30% for Wales. Buildings below 50,000 sq ft may carry a premium.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

A vacant floor and no Cat A number yet?

Send us the plans, the schedule or just the address. You get a free schedule costing and a programme to your marketing date.

WhatsApp us