Commercial Architects
Commercial buildings designed by the team that prices and builds them.
Craftex
100% of Craftex projectshanded over ahead of programme and within budget
Commercial work by our team
- 1,550 sq mof premium offices at Portsoken House, Aldgate: a full office fit-out, designed and built in 7 months
- 4 weeksfor four schemes designed and costed on a derelict St John's Wood club, planning strategy included
- 50+ yearsin construction: Martin Hickey led Slingsby Place, Covent Garden, behind retained façades before joining us
- 60%of site labour, approximately, is our own, so the details are built the way they were drawn
Design that is priced as it is drawn
Craftex designs commercial buildings for developers, landlords and businesses across London and the UK: offices, retail, hospitality and mixed-use, from concept to technical design. It is the work of commercial architects, with one difference: every stage is priced by our own build team as it is drawn, so the scheme that gets consent is one that can be built for the budget.
Commercial schemes lose money in the gap between the design drawings and the builder's tender. Ours do not: our architects work beside our construction team, and every option carries a cost plan before you choose it. You approve a building you already know the price of.
That is what most clients of commercial architects actually need: a building that gets planning consent, lets or trades well, and comes in on the number agreed at design. Offices, shops, restaurants, clinics, conversions and flats above commercial, across London first and the rest of the UK when the scheme fits. At Allitsen Road a derelict members' club became four costed schemes, with the planning strategy behind them, in four weeks.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Which commercial buildings do we design?
Six kinds of commercial building, each drawn for consent and costed by the team that will build it. Tell us which one is yours and we start from the site, not a template. See how we work as a construction partner for developers and investors.
Offices and workplaces
Whole buildings and floors for owners and tenants, laid out around headcount, daylight and the services the floor can take.
Retail and shopfronts
Shop floors, glazing, signage and entrances drawn for the street, the brand and the conservation officer.
Restaurants and hospitality
Kitchens, extraction, bars and dining rooms planned together, so the plant fits the plan before anyone orders it.
Mixed-use and flats above shops
Commercial ground floors with homes above, the cores, fire strategy and separate entrances resolved early.
Change of use and conversions
Warehouses, offices and shops reworked for a new use, with the planning route checked before the first sketch.
Refurbishment of occupied buildings
New floors, reception areas and services phased around the tenants and businesses still inside.
Each tile is one part of a single service: structural steel, mechanical and electrical services, fire strategy and Building Regulations are designed into the drawings, so plant, ducts and steel fit before the site opens. For workplaces that start from desks and headcount, see office design and space planning; for a shift between use classes, change of use.
How it works
How does a commercial design project run?
01
Brief and site
We meet, walk the building and agree what it must earn, and by when.
02
Options and cost
Two to four schemes drawn and costed by the construction team. You choose on real numbers.
03
Planning
Pre-application feedback, then one coordinated submission managed to decision.
04
Technical design
Structure, services, fire and finishes drawn to Stage 4 and priced as a fixed figure.
05
Build and handover
Our teams build it, certificates filed, keys handed over with nothing outstanding.
The Craftex Guide to Investor & Developer Projects
How a scheme moves from appraisal to keys with one team: what to check before you commit, which consents apply, where cost certainty comes from and how to read a cost plan. A short, free read before you brief anyone on a commercial building.
Our promises
Six promises, written into your contract
Our commitments on every commercial scheme, in writing: one team from concept to keys, a cost plan with every option, a figure that stands, a business that keeps trading, cover for your lender and insurer, and zero snags with every certificate.
-
One team from concept to keys
Designers, engineers, planners and builders under one contract, one point of responsibility.
Portsoken House, Aldgate: designed by our in-house team, then built by it.
-
Costed as it is drawn
Every option carries a cost plan, so the scheme you approve is one your budget covers.
Allitsen Road: four options, each with a unit-by-unit cost plan.
-
The agreed figure stands
A fixed price for the written scope; changes agreed in writing and priced first.
Public and employers' liability cover of £10M each.
-
Your business keeps trading
Phasing, nights and weekends planned around opening hours and tenants.
Drake's, Savile Row: refitted in 12 weeks, open throughout.
-
Covered for your lender and insurer
£10M public and employers' liability, professional indemnity on request, ISO 9001, 14001 and 45001, CHAS.
Insured to £10M for public and employers' liability.
-
Zero snags, every certificate
We leave when it is right, with test certificates and the health and safety file handed over.
Beaumont House: 750 sq m handed over with nothing outstanding.
Already have a quote? Send it to us. We'll beat it.
Got a design fee proposal, or a contractor's tender for a scheme another practice drew? Forward it today: the same working day, you get our line-by-line answer for the same building.
Compare your quotes
Where do commercial design projects go wrong?
Six points where a commercial scheme slips, and how we close each one. Hold your current quotes against this list before you sign. Most of these rows share one cause: design, cost and construction held by separate firms with separate contracts. When one team holds all three from the first drawing, the gaps that cost money on a commercial building close before they open.
| Area | The usual risk | With Craftex |
|---|---|---|
| Responsibility | Architect, engineer, QS and contractor, each blaming the last. | One design and build team answers for the whole scheme. |
| Final bill | Planning drawings approved, then the tender returns well over the appraisal. | Our builders price each option while it is being drawn. |
| Consent | Apply and hope, then redesign after the officer's report. | Pre-application feedback and precedent shape the scheme before submission. |
| Disruption | The shop or office closes for the build. | Works sequenced around trading hours and the neighbours. |
| Compliance | Building control, fire strategy and duty-holder appointments discovered late. | Compliance designed in at Stage 4 and every approval run by us. |
| Handover | Handover, then months of snags and missing paperwork. | Snagged before you see it; O&M manuals and certificates in one file. |
RIBA stages: what you receive at each stage
Each stage closes with documents you approve, so nothing moves on to site that you have not seen.
| Stage | Our work | What you approve |
|---|---|---|
| 0–1 Brief and feasibility | We visit the building, read its planning history and test what it could earn | A feasibility report with costed options |
| 2 Concept design | The preferred scheme drawn up and taken to a pre-application meeting | Concept drawings, a cost plan and the planning strategy |
| 3 Spatial coordination | Structure, M&E and fire strategy fitted into the plans; the application goes in | The planning submission and a revised cost plan |
| 4 Technical design | Full construction drawings and specifications, plus the Building Regulations package | A tender-ready set and a fixed construction price |
| 5 Construction | Our teams build it and answer design queries on site | Programme, site reports, every change agreed in writing |
| 6 Handover | Snagging, commissioning and the final certificates | O&M manuals, certificates and the building's health and safety file |
The stages are those of the RIBA Plan of Work 2020; Stage 7 (use) starts once the building is occupied. Design fees are agreed stage by stage, in writing, after the first meeting. How practices structure their fees is set out in architect fees for commercial projects.
Commercial architects in London and across the UK
London first. Most of our commercial work sits in central London: offices in Aldgate and Kensington, a flagship shop on Savile Row in Mayfair, a four-floor spa in Knightsbridge. At Portsoken House in Aldgate our in-house team drew the offices and our site team built them. Slingsby Place in Covent Garden was led by Martin Hickey, now our Preconstruction Director, in his earlier role.
Across the UK. We take on schemes outside London too: our Banbury warehouse in Oxfordshire was laid out and built by the same team. One team travels with the job, so nothing is lost between a local designer and a builder from elsewhere. The design, the cost plan and the build programme come from the same team, wherever the site is. See our locations for the cities we cover.
Read more
Whether you search for commercial architects near me, commercial architects in London or commercial building architects in the UK, the test is the same: can the practice tell you what the building will cost while it is still being drawn? Our London work runs across Westminster, Mayfair, Victoria, Knightsbridge, Kensington and Canary Wharf. Outside London we also work in and around Manchester, Birmingham, Leeds and Bristol.
Commercial design case studies
Two commercial buildings and one design study: each shows design and cost settled before work on site. Read how each one was run, then picture yours on the same terms. Related work: Medusa, Knightsbridge, a Stage 2 concept we took over, completed and built, and Drake's, Savile Row, refitted while the shop kept trading.
-
Portsoken House, Aldgate A full office fit-out over two floors, designed in-house and built around tenants who stayed at work. View case study
-
Slingsby Place, Covent Garden Martin Hickey's earlier role: strip-out and structural works behind retained façades, with the tower crane inside the footprint. View case study
-
Allitsen Road, St John's Wood Design study, not a build: a derelict members' club worked up as four costed schemes of four to seven flats, £6.0M GDV. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Commercial architects: your questions
What does a commercial architect do?
Designs buildings that earn: offices, shops, restaurants, clinics, mixed-use blocks and conversions. The work runs from feasibility and concept through planning to technical design and site inspection. At Craftex the same team also builds, so the drawings are priced and checked for buildability as they are made. The questions to ask before you appoint anyone are in our guide on how to choose an architect in London.
How does the RIBA Plan of Work split a project?
Into eight stages, from strategic definition (0) to use (7). Stages 2 to 4 are the design stages: concept, spatial coordination and technical design. A planning application usually goes in at the end of Stage 3, and the construction price is fixed at Stage 4.
Can you handle planning and change of use?
Yes. A new building, an extra storey, a new shopfront or a move between use classes normally needs planning permission, and some changes run through permitted development with prior approval. We check the route at the first meeting and run the application through our planning consultancy team. See also change of use.
Can you design a building we will keep trading in?
Yes. We phase the design and the works around opening hours and tenants. At Portsoken House every other floor stayed let while we worked, and the reception was rebuilt at night and at weekends. Drake's on Savile Row was refitted while the shop kept trading.
How fast do you reply?
Within the same working day. A director rings you to talk through the building and the next step.
How are commercial architect fees worked out?
Three models are common: a share of the build cost, a fixed sum for an agreed scope, or time charged by the hour. We set our design fee for each stage in writing after we have walked the building and read the brief, so you know the cost before you commit to the next stage. The models are compared in architect fees in the UK.
Design and build or traditional procurement: which is better?
It depends on how much cost certainty you need and how much control you want over the design. Under design and build one company takes the design and the construction, so the price is fixed while the drawings can still move. On the traditional route a separate architect designs, then the scheme goes out to tender. Compare both routes, with the risks of each, in design and build vs traditional procurement.
Do you work outside London?
Yes, across the UK. Our office is in Victoria and most of our commercial work is in central London, but we also take on schemes elsewhere, such as the Banbury warehouse in Oxfordshire. The design, cost plan and build come from the same team wherever the building is.
What size of commercial project do you take on?
From a single shop or clinic to a mixed-use block or a whole-building conversion. We publish no minimum. Get in touch and we'll discuss your project.
Read before you appoint an architect
What we tell developers and businesses before the first drawing: stages, procurement and how design fees work.
What our clients say
See all reviews on Google-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Have a building or a site in mind?
Send us the address and what it needs to earn. We will come back to you the same working day.



























