Section 20 Works for Mansion and Residential Blocks
Major works priced to hold through consultation, residents at home.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 10 weeksto rebuild a 290 sq m penthouse in a Canary Wharf tower, residents at home throughout
- 12 weeksto refurbish a 400 sq m Kensington penthouse while the building stayed occupied
- 70 sq mshared reception rebuilt over nights and weekends, every tenant at work
- £10Mpublic and employers' liability cover each, for your board and the block's insurer
The contractor's half of Section 20, done properly
Craftex carries out Section 20 works for freeholders, RMC boards and managing agents of mansion blocks and residential buildings: roofs, facades, windows, lifts and common parts. We supply the contractor's side of Section 20 major works: a scope leaseholders can read, an estimate that holds through consultation, and works that let residents stay at home.
We work beside your managing agent and building surveyor, never in their place. Stone, brick, roofs, sash windows, lifts and entrance halls run under one contract with one director answerable, so the board reports one programme to leaseholders instead of five.
Our best fit is the prime mansion block and the larger residential building in prime London postcodes, from Chelsea to St John's Wood, where the fabric is worth restoring and the residents expect a quiet, orderly site.
Why do major works fail consultation?
Many consultations that go wrong fail on the contractor's side. The estimate moves after the notice of estimates, the scope is written so leaseholders cannot follow it, the entrance hall closes for weeks and residents have nobody to ask. We settle all four before the first notice goes out: a plain-English scope by package, an estimate built from a walk-round, a resident plan and one named site manager. See how we work as a construction partner for landlords and managing agents.
Read more
Section 20 of the Landlord and Tenant Act 1985 and the Service Charges (Consultation Requirements) (England) Regulations 2003 apply when any one leaseholder's contribution to qualifying works will be more than £250. Three notices follow in order. A notice of intention describes the works and gives leaseholders 30 days to comment and to nominate a contractor. A notice of estimates sets out at least two estimates, with another 30 days for observations. Where the contract goes to neither the lowest estimate nor a nominated contractor, the landlord gives reasons within 21 days of signing it.
The contractor fits into the first two stages: the scope that goes into the notice of intention, and a priced estimate for the statement of estimates. Freeholders looking for a major works contractor or a block refurbishment contractor for Section 20 major works need the same thing from us: an estimate written against the surveyor's specification that does not move once the notices are out. Our guide to Section 20 consultation and its notices sets out each step.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do Section 20 works cover?
Six packages from your surveyor's report, delivered by one team under one contract and signed off once. Part of our landlord and compliance works.
External repairs and redecoration
Brick, stone, stucco and joinery repaired, then every elevation prepared and painted, one scaffold lift at a time.
Roof replacement
Slate, lead and flat roofs renewed above lived-in top floors and made watertight every night. Larger roofs run with our roofing and facade team.
Windows and sash restoration
Timber sash windows overhauled, draught-proofed or remade to match, booked flat by flat around residents.
Balconies, walkways and structure
Ironwork, balustrades, decks and walkways repaired, with every structural repair signed off by the engineer.
Lifts and lift lobbies
Lift refurbishment and modernisation managed with a specialist lift contractor, lobbies refurbished alongside, one lift kept running where there are two.
Communal areas, entrance halls and services
Entrance halls, stairs and corridors restored, with lighting, door entry, drainage and fire doors renewed.
How it works
How do Section 20 works run, from notice to handover?
01
Report and maintenance plan
We read the surveyor's report and the planned maintenance plan, then walk the block with your managing agent.
02
Priced scope for the notice
The works described plainly and priced by package, laid out to drop into the statement of estimates.
03
Resident plan and site set-up
Letters to every flat, a named site contact, a secure scaffold and agreed working hours before work starts.
04
Floor by floor, entrance open
Works phased floor by floor and elevation by elevation, the entrance kept open and flat visits booked in advance.
05
Handover and final account
Certificates, guarantees and a final account that matches the estimate, ready for the service charge accounts.
The Craftex Guide to Fit-Out and MEP Projects
Lifts, lighting, fire alarms and plant are the packages residents notice most. Our free guide to fit-out and MEP projects shows how building services are planned, priced and certified, the same work that sits inside a block's major works.
Our promises
Six promises, written into your contract
-
One contract, one site manager
Roofs, windows, decoration, lifts and communal works sit under one contract, so nobody can pass a problem to another firm.
Kensington Olympia, where we ran the whole project as main contractor from first design to handover.
-
The tendered sum holds
Any change is priced and agreed in writing before it is built, so leaseholders hear about it from you first.
Every Craftex project to date finished on budget.
-
Residents stay at home
Deliveries, noise and waste are planned with the building managers, and every visit inside a flat is booked ahead.
Pan Peninsula, Canary Wharf: a 290 sq m penthouse rebuilt in 10 weeks with residents at home.
-
Done by the agreed date
The completion date comes from your programme and goes into the contract. Our own trades keep it moving.
Portsoken House, Aldgate: 1,550 sq m of offices delivered in seven months while the other floors stayed in use.
-
Cover your board expects
£10M public liability and £10M employers' liability, professional indemnity on request, ISO 9001, 14001 and 45001, and CHAS.
The accreditations at the foot of this page.
-
Zero snags, a complete file
Certificates, guarantees, lift test records and as-built drawings arrive together at handover.
Beaumont House, West Kensington: 750 sq m handed over in three weeks with zero snags.
Already have a quote? Send it to us. We'll beat it.
Holding one estimate for your block, or a tender that looks high? Send it with the specification. A director prices the same scope and replies the same working day. A second estimate on the same specification also gives your statement of estimates a fair comparison.
Compare your quotes
Where major works go wrong, and what we do instead
| Area | The usual risk | With Craftex |
|---|---|---|
| The final account | Extras appear after the notices, and leaseholders get a bill far above the estimate. | Opening-up risks priced in the estimate, and nothing extra built until you approve it in writing. |
| The scaffold | Scaffold put up for one season is still standing a year later. | One scaffold for every package, long-lead windows and lift parts ordered early, the strike date in the contract. |
| Residents | Nobody tells residents what happens when, so every complaint lands on the managing agent. | Letters before each stage, a named site contact and flat visits booked in advance. |
| The lift | The only lift goes out of service with no plan for residents who cannot use the stairs. | Lift works phased with the lift specialist, one car kept running where there are two, and help planned for residents who need it. |
| Repairs that last | Patch repairs to stone, render and roofs that fail again within a few years. | Repairs specified with your surveyor to last the maintenance cycle, with every guarantee filed. |
| Responsibility | A roofer, a window firm and a decorator on separate orders, each blaming the others. | One main contractor answers for every package in the specification. |
What each Section 20 package involves
What each package covers, and what moves its price and its programme. The figures come from your specification once we have walked the block, and every package is priced separately so the board can phase the works.
| Package | Typical scope | What changes the price | Programme |
|---|---|---|---|
| External repairs and redecoration | Scaffold, brick, stone and render repairs, joinery, preparation and painting | Number of elevations, scaffold design, the condition found once opened up | Set by the elevations and the weather |
| Roof replacement | Strip-off, insulation, new covering, leadwork, gutters and roof safety | Roof area and covering, access, heritage materials | Dry-weather windows; one scaffold with the facade where possible |
| Windows and sash restoration | Overhaul, draught-proofing, repair or like-for-like replacement, making good inside | Repair or replace, conservation area or listed status | Manufacturing lead time and access to each flat |
| Balconies, walkways and structure | Ironwork, balustrades, concrete and deck repairs, engineer's inspections | What is found once surfaces are opened up | Engineer's sign-off at each stage |
| Lifts and lift lobbies | Refurbishment or modernisation of the car, machinery and controls, lobby finishes | Lift type and equipment, one car or two | Equipment lead time; one car kept running where possible |
| Communal areas and services | Entrance halls, stairs, corridors, lighting, door entry, fire doors and drainage | Finish level and phasing around residents | Floor by floor, entrance kept open |
| Section 20 consultation (run by your managing agent) | Notice of intention, notice of estimates, notice of reasons where needed | Set by the 2003 consultation regulations, not by the contractor | Two 30-day periods before the contract is signed |
| Specification and estimate | Walk-round, scope by package, estimate and programme | No fee and no obligation | Arranged once you send the report |
Mansion blocks and period buildings in London
Kensington, Chelsea, Marylebone, Maida Vale and St John's Wood. Red-brick and stone mansion blocks with sash windows, iron balconies and grand entrance halls. We restore what makes them valuable instead of replacing it: stone and brick repaired, sashes overhauled, entrance halls brought back to their original finish.
Towers and modern blocks. Balconies, walkways, lifts and works next to cladding, planned around residents high above the street. Where the external wall itself is the problem, our fire safety and cladding remediation team takes it on.
Read more
A mansion block is a purpose-built block of flats, usually late Victorian or Edwardian, in red brick or stone, with a shared entrance hall and staircase and often an original lift. The communal areas, meaning the halls, stairs, landings and lifts every leaseholder shares, are where residents judge major works first, so we plan them as carefully as the facade.
We also take on major works outside London. Section 20 applies in England; Wales has its own consultation regulations. See all locations.
Planned maintenance that becomes a programme
A ten-year planned maintenance plan lists what is due and when. We turn it into a phased Section 20 programme the service charge can carry: roof and facade together under one scaffold, windows the year after, lifts when the parts are ready. Where the roof can take new storeys, new flats above may help fund the works below: see airspace and upward extension.
Read more
Planned preventative maintenance means inspecting and repairing on a schedule, before failures turn into emergencies. A reserve fund, built up through the service charge, spreads the cost so leaseholders are not hit with one large demand. We price every phase from one survey, so the board knows the full figure before phase one starts.
Projects in occupied residential and multi-let buildings
Works inside occupied blocks and common parts; our Section 20 programmes follow the same resident-first plan. Related work: Portsoken House, Aldgate.
-
Kensington: an occupied prime block A 400 sq m penthouse refurbished in 12 weeks inside a building that stayed fully occupied. View case study
-
Canary Wharf: a residential tower A 290 sq m penthouse redesigned and rebuilt in 10 weeks in a tower full of residents, on time and on budget. View case study
-
Aldgate: common parts A 70 sq m shared reception rebuilt over 12 weeks of nights and weekends, with no disruption to tenants. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Section 20 works: what managing agents and RMC boards ask
Can you provide one of the two estimates for a Section 20 consultation?
Yes. We price the surveyor's specification package by package, laid out to sit beside the other bids in the notice of estimates. We price as an invited contractor or as a leaseholders' nominee on the same terms. The managing agent runs the consultation; we supply the contractor's estimate.
Can residents stay at home during major works?
Yes. Entrances and escape routes stay open, noisy work keeps to agreed hours and visits inside flats are booked with each household. At Pan Peninsula in Canary Wharf and at Kensington Olympia we worked with residents at home throughout.
Can you restore sash windows and stone in a mansion block rather than replace them?
Yes, and in a conservation area or a listed building it is often the route the council expects. Sashes are overhauled, draught-proofed and reglazed where needed; stone and brick are repaired to match. Like-for-like replacement is priced as an option where a frame is past repair.
Do fire door replacements need a Section 20 consultation?
Yes, when any one leaseholder's share passes the consultation threshold, like any other qualifying works. Flat entrance doors can belong to the leaseholder or to the freeholder depending on the lease, so check the lease first. Our fire door installation team replaces communal and flat entrance fire doors.
Do you work outside London?
Yes. Most of our work is in London, and we take on major works across the UK. The consultation rules differ by nation: England has Section 20, Wales its own regulations, and Scotland separate rules for shared repairs.
Will your estimate hold after the notice of estimates?
That is what it is built for. We walk the block and allow for opening-up risks before we price. Anything outside the specification gets a price and your written approval before work on it starts, so the board, not the final account, tells leaseholders about a change.
Do you work with our managing agent and building surveyor?
Always. The surveyor writes the specification and inspects the work; the managing agent runs the consultation and speaks for the board. We build, report progress to both and answer leaseholders' questions about the works in writing. We never act as the managing agent or the surveyor.
Do you refurbish lifts?
Yes, inside the same contract, managed with a specialist lift contractor who carries out the lift work and its certification. We refurbish the lobbies alongside and phase the works so a lift stays in service wherever the building has two.
Can new storeys on the roof pay for our major works?
Sometimes. Where planning allows, new flats built on the roof can raise money for the freeholder that helps fund roof and facade works below. It needs the freeholder's agreement, planning permission and a careful read of the leases. See airspace development.
How fast do you reply?
A director replies the same working day. Send the surveyor's report, the ten-year plan or photos of the block, and you get next steps and a date to walk the block.
Read before you consult
Guides for freeholders, RMC directors and managing agents: notices, plans and budgets.
-
Guide Section 20 Notice and Consultation for Major Works Read the guide
-
Guide Planned Preventative Maintenance for Residential Blocks Read the guide
-
Guide Office Refurbishment While Occupied: How to Keep the Business Running Read the guide
What our clients say
See all reviews on Google-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Major works due on your block? Get the scope priced.
Send the surveyor's report, a planned maintenance plan or a few photos. We will come back to you the same working day.