Pre-Construction Services & Two-Stage Tender
Your scheme priced, tested and programmed by the builder before you commit a pound.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 60%of site labour is our own, so the date agreed at stage two is ours to keep
- 3 weeksto refurbish Beaumont House, with five weeks left on the old lease
- 0snags at handover, with every certificate in the file
- £10Minsurance cover, ISO and CHAS, ready for your funder's due diligence
Risks priced before you sign
Craftex provides pre-construction services for developers and funds in London and the UK: cost plan, buildability review, value engineering and a two-stage tender under a PCSA. The team that tests your drawings is the team that builds them, so the risks we find are priced before you sign, not argued over on site.
We take on large commercial buildings, prime residential developments and whole-house rebuilds of prime London homes, where one missed risk can cost more than the whole pre-construction stage. Our Preconstruction Director, with more than 50 years in construction, reads your drawings and tender documents first, at no charge, and tells you what they leave out.
Why bring the builder in before the tender?
Because most overruns are drawn in before anyone reaches site. A contractor who joins during design finds the clash, the missing allowance and the long-lead item while each one is still a line on a drawing, so you start earlier, with fewer variations and a figure your funder can rely on. See how we work as a construction partner for developers and investors.
Read more
Early contractor involvement (ECI) means appointing the builder while the design is still developing, usually at RIBA Stage 3 or early Stage 4, instead of after the drawings are finished. The contractor brings buildability, sequencing and real market prices into the design team, and the design is completed with those inputs rather than corrected afterwards through variations.
A pre-construction services agreement (PCSA) is the contract that makes this work. It appoints the contractor for the pre-construction stage only: it lists the services, the deliverables, the fee for the stage, who owns the design work produced and how either side can exit. JCT publishes a standard Pre-Construction Services Agreement, and many employers use an amended version. A PCSA is not a letter of intent and does not commit you to build with that contractor.
Two-stage or single-stage? In a single-stage tender, several contractors price a finished design once. In a two-stage tender, one contractor is chosen early on its preliminaries, overheads and profit, works with your team under the PCSA, then prices the work packages openly with you to reach the contract sum. Clients searching for preconstruction services, a pre construction services agreement or a PCSA contract are usually weighing exactly this choice.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do our pre-construction services include?
Six deliverables, each one written down, each one prepared by the people who will later build the scheme, so nothing is lost between the estimate and the site.
Cost plan
Your scheme costed element by element from live subcontract prices, then reconciled line by line with your own cost consultant's figures.
Buildability review
Builders read the drawings for sequencing, access, temporary works and tolerances before a single package goes out to price.
Value engineering
Priced alternatives for materials and systems that keep the design intent and the finish. You and your architect choose which to take.
Programme and logistics plan
Completion set from supplier lead times, approvals and phasing, with deliveries, cranes and site access planned for the street.
Package tenders under a PCSA
Each specialist package tendered competitively and opened with you, so the price keeps its competition after we are appointed.
The fixed contract sum
One figure for the building contract, built from the tendered packages, with the programme and the risk allowances agreed alongside it.
How it works
How does pre-construction run, review to contract?
01
Free review
Send drawings and tender documents. Our Preconstruction Director checks buildability and cost risks and recommends a tender route. No charge, no obligation.
02
Agree the route
Single-stage if the design is complete; two-stage if it is still moving, with a PCSA that sets the scope, deliverables and exit.
03
Test the design
We work through technical design with your architect and engineers: sequencing, value engineering options and a programme built on lead times.
04
Tender the packages
Work packages go out to competitive tender. You see every return, and the cost plan is reconciled with your cost consultant.
05
Fix the sum
The stage-two sum and programme are agreed, the building contract is signed, and the same team mobilises on site.
The Craftex Guide to Investor and Developer Projects
Written for developers, landlords and their advisers before a tender. It shows how a scheme moves from brief and cost plan to a certified building, and which questions separate a contract sum you can hold from an estimate that will move.
Our promises
Six promises, written into your contract
-
Costed by the people who build it
No hand-over between estimators and builders: the people who cost your scheme in pre-construction run it on site.
Portsoken House, designed by our in-house team and priced under one roof.
-
The sum you sign holds
After stage two, the contract sum is what you pay. Any change you ask for is priced and agreed in writing first.
100% of our projects finished on budget.
-
Your building keeps working
Phasing, access and out-of-hours work are planned during pre-construction, not discovered once the hoarding is up.
Portsoken House, where the other floors stayed let throughout the works.
-
A date you can hold us to
Most of the labour is ours, so the programme does not wait on another firm's diary.
Herbert Crescent, Knightsbridge: a 450 m² prime home refurbished in 32 weeks.
-
£10M cover, every accreditation
£10M public liability and £10M employers' liability, with professional indemnity on request.
ISO 9001, 14001 and 45001, CHAS, SafeContractor and Constructionline.
-
Zero snags, every certificate
We hand back a finished building and a complete record, with nothing left to come back for.
Kensington Olympia, 400 sq m handed over on time without a single snag or defect.
Already have a quote? Send it to us. We'll beat it.
Holding a stage-one return, a PCSA fee proposal or a contractor's figure already? Send it with the drawings. A director checks it against the design, shows you what it leaves out and comes back to you the same working day with where we would beat it.
Compare your quotes
Where do single-stage tenders go wrong?
Hold any tender route against these six points. A single-stage price on an unfinished design looks firm on the day it is signed; the risks it left out come back as claims.
| Area | The usual risk | With Craftex |
|---|---|---|
| Responsibility | Designers finish the drawings alone, and the builder who prices them finds the gaps after signing | A builder sits with your design team through technical design, so gaps close on paper, not on site |
| The final bill | Once one contractor is preferred, competition fades and the stage-two figure drifts upwards | Open-book tendering of every package, with the returns on your desk before the second-stage sum is agreed |
| The date | A programme drawn up before anyone checked lead times for steel, plant or facade panels | Long-lead items identified early, and the completion date set from real supplier dates before you commit |
| Disruption | Tenants and staff learn about the works when the drilling starts | Deliveries, quiet hours and phasing agreed with you and written into the contract before mobilisation |
| Compliance | Planning conditions, building control and the funder's paperwork left until the money is committed | Every approval and certificate needed to occupy, insure and fund the building, mapped into the programme first |
| Handover | Practical completion arrives with a snag list and documents still to follow | The handover file is defined at pre-construction: manuals, as-built drawings, test certificates and the safety file |
Single-stage or two-stage tender: which suits your scheme?
Two ways to reach a building contract. The right one depends on how settled your design is and how soon you need to start. The free review recommends a route for your scheme, with the reasons in writing.
| Single-stage tender | Two-stage tender with a PCSA | |
|---|---|---|
| Design when you tender | Complete technical design | Concept or developed design |
| When the contractor joins | After the design is finished | During design, under a PCSA |
| How the contract sum is set | One competitive lump sum | Open-book package tenders, agreed at stage two |
| Builder's input on the design | After signing, often as variations | Before signing, while changes cost little |
| Time to start on site | Later, once the design is complete | Sooner, because design and pricing overlap |
| Best for | Simple schemes with a settled design | Complex, occupied or fast-track schemes |
What you hold at the end of pre-construction
The cost plan and the risk register. An elemental cost plan priced from real package returns, with every known risk listed against an owner and an allowance. An RICS-qualified quantity surveyor on our team prepares it, and your cost consultant can test every line.
The programme, the logistics plan and the contract sum. A programme set from supplier lead times, a logistics plan the borough and the neighbours can read, and one contract sum built from the tendered packages, ready for your funder.
Read more
Cost planning in construction usually follows the RICS New Rules of Measurement (NRM 1): an order of cost estimate at the brief, then formal cost plans that grow more detailed as the design develops, element by element, until they are replaced by tendered prices. Items the design cannot yet define are carried as provisional sums, which are adjusted when the work is finally priced; the fewer provisional sums left at contract, the more certain the figure. A separate contingency covers risks nobody can yet price, and we usually advise 5–10%, depending on how much of the building is still unknown. See our guides to provisional sums and how much contingency a project needs.
Priced, planned and built by the same team
Three of our builds where the figure and the date were fixed before work started and held to the end: an office conversion around a working building, a refurbishment against a lease deadline and a prime Knightsbridge home.
-
Portsoken House, Aldgate A full office fit-out: 1,550 sq m of premium offices in seven months, designed and priced under one roof, with the other floors let throughout. View case study
-
Beaumont House, West Kensington A 750 sq m office turned into an open-plan workplace in three weeks, where other contractors quoted twelve. View case study
-
Herbert Crescent, Knightsbridge A £1.5M prime home, 450 m² refurbished in 32 weeks to the figure agreed before work began. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Pre-construction services: your questions
What are pre-construction services?
The contractor's work between planning consent and the building contract, usually during technical design: buildability review, cost plan, programme, value engineering and package tenders. Our guide to what preconstruction covers sets out each stage. Before planning, the equivalent is a feasibility study. Our feasibility study example at Allitsen Road shows one with a cost plan for each of four schemes.
Is the cost and buildability review really free?
Yes. Martin Hickey, our Preconstruction Director, goes through the drawings and the tender pack and gives you a written view of the cost and buildability risks and the tender route he would recommend. There is no charge and no obligation to appoint us.
What does value engineering cut, and what must it never cut?
It removes cost, time or risk while keeping what the building does and how it looks. It must never cut fire safety, structure, compliance or the finish the client is paying for. Read value engineering in construction for worked examples.
Can we walk away after pre-construction?
Usually yes. A well-drafted PCSA lets you stop after stage one and keep the design work you have paid for. Check that exit clause before you sign any pre-construction agreement.
Do you work outside London?
Yes, for the right scheme. London is our base, and we take pre-construction appointments for developers and funds elsewhere in the UK. See where we work.
What is a PCSA and what does it commit me to?
A separate contract that appoints a contractor to work with your design team before the main building contract. It fixes the services, deliverables, fee for the stage and exit terms, and it does not oblige you to build with that contractor. Our pre-construction services agreement guide covers the clauses.
When should a contractor be involved: RIBA Stage 2, 3 or 4?
As early as the design allows, ideally by Stage 3, when the layout is settled but the technical design is still open. Joining at Stage 4 still finds risks before contract. See the RIBA stages explained.
What is in a cost plan?
The budget for your building broken down element by element, from substructure to fit-out, with preliminaries, risk allowances and fees shown separately. In a two-stage tender each estimate is replaced by a real package return before the contract sum is agreed.
Do you write the scope of works?
Yes, as part of the package tenders: each package gets a written scope, so every tenderer prices the same thing. Our guide to the scope of works in construction shows what it should contain.
How fast do you reply?
The same working day. Send the drawings, the brief and your target date, and a director comes back to you.
Read before you tender
From our own tenders: the PCSA, the scope and the cost plan, explained by the people who price them.
-
Guide PCSA: What a Pre-Construction Services Agreement Covers Read the guide
-
Guide Two-Stage Tender vs Single-Stage Tender: How Each Works and When to Use It Read the guide
-
Guide Construction Cost Plan: How It Is Built Read the guide
- More guides
- What preconstruction covers
- The scope of works
- Provisional sums
- Contingency on a construction project
- Abnormal costs
- Briefing a contractor for a commercial project
- Why builders' quotes vary
- The RIBA stages
- The JCT Design and Build Contract
- What an employer's agent does
- Principal contractor vs main contractor
- Design and build vs traditional procurement
- More case studies
What our clients say
See all reviews on Google-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Get a free cost and buildability review before you sign
Send the drawings, the brief and the date you are working to. Our Preconstruction Director reviews them free, with no obligation, and we will come back to you the same working day.