Skip to content
Request a callbackCallback
White architectural site model of low buildings among miniature trees on a sand-coloured base

Architects and Interior Designers

Homes, offices and commercial buildings, designed and built by one team.

Craftex

100% of projects handed over
ahead of programme, on budget, homes and offices alike

Designed and built by our team

  • 450 m²at Herbert Crescent, Knightsbridge: every finish chosen on drawings before the build
  • 1,550 sq mof workspace in a former Aldgate warehouse, drawn in-house and built by our crews
  • 3 weeksfor 750 sq m of Kensington offices, finished inside a five-week lease deadline
  • 12 weeksfor a 400 sq m penthouse at Kensington Olympia, designed and refurbished as one job

Architects who build what they design

Craftex is a London design and build company: our architects and interior designers draw high-end homes, offices and commercial buildings, and our own crews build them, from the first sketch to handover. Looking for architects in London who also build? Choose the service you need below, or tell us about the project and we will point you to the right team.

Most design projects lose time and money in the gap between the designer's drawings and the builder's price. Ours sit with one company: every option is costed by our construction team before you choose it, and the same people build what you approve. So the design you pay for is a design you can build.

That is the difference between us and most architecture firms in London: the drawings and the build price arrive together, so there is no tender shock after planning. Homes, offices, commercial buildings and interiors, from Westminster to Richmond, and larger design and build schemes across the UK. Whether you are comparing architects in London, an architecture firm for a commercial building or design and build architects for a home, start with the service that fits your building.

Architectural drawings and a pen on a marble desk beside a laptop

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

All our design services

Six routes in: four design services, planning consent and the build itself, all run by the same company. Pick yours, or book the consultation and we will route you. See how we work as a fit-out and construction partner for businesses or a design and build partner for homeowners.

Stone-fronted City of London office building beside a glass tower reflecting the sky

Commercial Architects

Offices, shops, restaurants and mixed-use buildings, drawn for consent and costed by the people who build them.

White stucco Victorian terrace with bow fronts and black iron balconies under a blue sky

High-End Residential Architects

Prime London houses, extensions, basements and new homes, with every option priced before you pick one.

Boardroom with a long table and leather chairs beside floor-to-ceiling windows

Office Design and Space Planning

Workplaces laid out around how your team works, then built before your lease date.

High-end open-plan living room with a floor-to-ceiling bookcase, marble coffee table and leather lounge chairs

High-End Interior Design

Rooms, lighting, joinery and finishes designed with the architecture and fitted by our own teams.

Victorian red-brick mansion blocks on a tree-lined London street

Planning and heritage consents

Applications, listed building consent and conservation-area cases prepared by our planners, so the design you approve is the one the council approves.

High-end living room with a marble fireplace wall, dark timber panelling and floor-to-ceiling windows

Design and build to handover

The team that drew it prices it, builds it and hands it over, under one contract and one director.

MEP design and coordination: mechanical, electrical and plumbing services designed into the drawings, so plant and ducts fit before site.

How it works

How does a design project run with us?

01

Free consultation

Tell us about the building, the brief and your date. We say which service fits and what consents are likely. No charge.

02

Options with costs

Two to four options drawn, each priced by our construction team, so you compare real figures before choosing.

03

Consents secured

Planning, listed building, landlord and building control applications prepared and taken through to a decision.

04

Detailed design

Structure, services, lighting and finishes drawn in full. The build figure is fixed at this stage.

05

Build and keys

Our own teams build what was drawn and hand it over finished, with every certificate on file.

Hardback cover of the Craftex guide to residential design and build

The Craftex Guide to Residential Design and Build

Not ready to talk yet? Read how a home design runs, from the design stages and the consents to the build budget and the programme, then book your free consultation when the brief is clearer.

Our promises

Six promises, written into your contract

In writing, on every job, whatever the building: a single team, a price made while drawing, a figure that holds, a home or business that keeps running, your date, and a snag-free handover.

  1. One team, sketch to keys

    Architects, interior designers, space planners and builders in one company, with one director answering for the result.

    Portsoken House, Aldgate: designed in-house, then built by us.

  2. Priced while it is drawn

    Our construction team costs every option at design stage, so the scheme you approve is one you can build.

    Allitsen Road: each scheme came with its own cost plan.

  3. The agreed figure stands

    The build price is fixed at detailed design. Any change is priced and agreed in writing before work starts.

    Every Craftex project to date finished on budget.

  4. Your business or home keeps going

    Works are phased around trading hours, tenants and neighbours, and planned before anyone arrives.

    Drake's, Savile Row: refitted in 12 weeks and open throughout.

  5. Ready before your date

    Design dates go into the appointment, and about 60% of the site labour is our own.

    Beaumont House: back in use before the lease deadline.

  6. Zero snags, every certificate

    We leave a finished space with Building Regulations sign-off, test certificates and manuals filed.

    Kensington Olympia: no snags or defects at completion.

Example design quotation with a note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Already priced by someone else? A director reads the design fee proposal or builder's quote line by line and rings you the same working day to show where we beat it.

Compare your quotes

Where do design projects usually go wrong?

Most design projects slip in the same six places. This is what changes when one company holds the drawings and the build. Check any proposal on your desk against it. Each of these risks comes from the same split: the people who draw and the people who build work under separate contracts. Put both in one company from the first sketch, and the arguments over whose drawing was wrong never start.

AreaThe usual riskWith Craftex
ResponsibilityDesigner, architect and builder hired separately, each blaming the other's drawings.One company answers for the design and the build, so there is nobody to referee.
The final billConsent arrives, then the tenders land far above the budget.Build costs tested at each design stage, before you sign a single drawing off.
DisruptionThe scheme ignores how the building is used while the works go on.Phasing, access and quiet hours drawn into the scheme from the start.
The dateDesign runs late and swallows the weeks meant for building.Design, approvals and construction sit in one programme with one set of dates.
CompliancePlanning conditions, landlord consent and building control chased by you at the end.We run every approval and certificate needed to occupy, let or insure the building.
HandoverA design that looked perfect, then a year of snags and missing paperwork.A finished space on the agreed day, with manuals, warranties and certificates in one file.

Which design service do you need?

Find your project in the first column. The row tells you which team to talk to and what happens first, so the first meeting is spent on your building.

ServiceWho it is forWhat you getTypical first step
Commercial ArchitectsDevelopers, investors, landlords and business owners with a building or siteFeasibility, concept, planning and technical design, priced by our buildersA site visit and a costed first option
High-End Residential ArchitectsOwners and family offices remodelling, extending or replacing a prime homeA design for consent, heritage and party wall matters handled, a fixed build figureA walk round the house or plot with your brief
Office Design and Space PlanningCompanies moving, growing or reworking an office for hybrid workWorkplace study, test fits and layouts, built before your lease dateA short review of headcount, teams and how you use the office
High-End Interior DesignOwners of homes, penthouses, restaurants, clinics and showroomsConcept, materials, lighting, joinery and furniture, fitted by our own teamsA conversation about your rooms, style and timing

Many projects need two of these at once: a house extension with new interiors, or an office move with a change to the building. One consultation covers both, and one company carries the design through to the keys.

Our team

  • in

Architects and interior designers: your questions

Do design and build sit under one contract with you?

Yes. The scheme is drawn, costed while it develops and built by one company, so a single party answers for the result. A separate architect gives you an independent check, but the build cost stays unknown until tender. Both routes are compared in design and build vs traditional procurement.

What decides the design fee?

We quote the design fee in writing after the consultation, once we know the building, the brief and the consents involved, and you agree it before any design work starts. The build is priced separately by our construction team as the drawings develop. Market fee models are set out in architect fees in the UK.

Do you work outside London?

Yes. Most of our work is in London, including Westminster, Kensington, Chelsea, Hampstead and Richmond, from our office in Victoria. Commercial architecture and office design also take on projects across the UK.

Do you handle planning permission?

Yes. New buildings, extensions, extra storeys, new shopfronts and many changes of use need it, and listed buildings need consent for interior work too. A fit-out inside an existing building usually needs Building Regulations approval and the landlord's consent instead. Councils aim to decide most applications within eight weeks of validation. Our planning consultancy team runs the application; see how long planning permission takes.

How quickly will I hear back?

The same working day. A director phones you to discuss the building and which of our teams should take it.

Architect or interior designer: which do I need?

Start with the architect if walls, structure, an extension or planning are involved; start with the interior designer if the shell stays and only the rooms change. A space planner works out how a team uses a workplace. On high-end projects the disciplines should work together from the first sketch. The questions to ask are in how to choose an architect in London; for workplaces, read office space planning vs office design.

What does the free design consultation cover?

A conversation with our architects and designers about your building or plot, your brief, your budget and your date. We tell you which service fits, which consents are likely and how we would price the work. Send photos, drawings or the agent's particulars beforehand. There is no charge and no obligation.

Can you work from another architect's drawings?

Yes. We review the drawings, the planning position and the budget, then carry the scheme forward as our own. Early concepts continue easily; a finished technical package gets an audit first. Medusa, a spa and salon in Knightsbridge, reached us at RIBA Stage 2 with a concept and a few visuals.

Do you design MEP (mechanical, electrical, plumbing)?

Yes. Heating, ventilation, power, lighting and drainage are designed into the drawings with the architecture, so plant, ducts and risers fit before anyone is on site. See MEP design and coordination.

What our clients say

See all reviews on Google
  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Tell us about your building

Send the address, a few photos or drawings, and the date you are working to. We will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us