Skip to content
Request a callbackCallback
Long self storage corridor lined with red roller-shutter unit doors under strip lights

Self Storage Construction & Conversion

Storage buildings opened in phases, so the first units let while the rest are built.

Our track record

100% of projects delivered ahead
of programme and on budget

What our clients get

  • 60%of site labour is our own, so your opening date never waits on another firm
  • 8 weeksto design and build a 500 sq m railway-arch warehouse in Bethnal Green, studio, offices and dispatch included
  • 0snags when you take the keys, and every certificate in the file
  • £10Minsurance cover, ISO and CHAS, ready for your lender and insurer

Storage that lets from the first phase

Craftex delivers self storage construction across London and the UK: warehouse conversions, mezzanine floors, unit partitions and new buildings, designed and built under one contract. We plan the net lettable area first, then build in phases so your first customers move in before the last floor is finished.

We build for operators and investors who want a flagship store: large multi-level conversions of sheds and retail boxes, and new storage buildings on prominent roadside sites, from London to the regions.

Large storage hall being finished, with a pale resin floor going down and wall panels rising at the far end

Convert a warehouse or build new for self storage?

Steel portal frame of a new building, rafters and columns against a bright sky

The building decides which route pays. A tall shed with a sound slab can take two or three storage levels inside its height, so a conversion usually opens sooner. New build wins where no building fits, or where roadside presence and a clean layout earn more per square foot. We test net lettable area, floor loading, clear height, access and the planning use class on your site, then show you which route makes the better store. See how we work as a construction partner for developers and investors.

Read more

Self storage sits in Use Class B8, storage and distribution. A building with a lawful B8 use can usually become a store without a change of use, though old permissions sometimes tie a building to one occupier or use by condition. Turning a retail, leisure or office building into storage usually needs planning permission, and new doors, cladding or signage may need consent too.

Mezzanine floors need Building Regulations approval. Building control checks the structure, fire resistance, escape stairs, guarding and travel distances to the exits; in storage the deck often needs 30 or 60 minutes of fire resistance, depending on its size and use. We design, submit and certify every level with the rest of the building, as our guide to mezzanine floor regulations explains.

Fire is the design question that shapes the layout. A fire strategy written for the building sets the detection and alarm, the compartment walls, the escape routes, emergency lighting and fire-fighting access. Large compartments usually call for sprinklers, and the London Fire Brigade urges every self storage site to consider them. As operator you become the responsible person under the Fire Safety Order, so we hand over the records that role needs.

Whether you look for self storage builders for a new store or a team for a self storage conversion, the market rewards a building that opens on time: the Self Storage Association UK's 2026 report puts industry turnover at £1.3bn and average occupancy at 74.5%, so the build cost and the opening date weigh heavily in every appraisal.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does our self storage build cover?

One contract from the first layout to opening day, for a flagship store or a programme of sites. Part of our design and build main contractor service; distribution sheds sit under warehouse construction, other shed refits under warehouse conversion.

Technical drawing with dimension lines, a pencil and a scale rule

Feasibility and net lettable layout

Unit mix, corridors and storage levels drawn to win the most lettable floor from your building.

Empty steel-framed warehouse with a clean concrete slab and roof lights

Warehouse to storage conversion

Sheds, industrial units and retail boxes stripped out, repaired and fitted out as storage over several levels.

Steel gallery walkway with railings running between tall shelving

Mezzanine floors and stairs

Steel decks, protected stairs, guarding and goods lifts that add lettable floors inside the height of the shed.

Storage corridor with teal roll-up unit doors on both sides

Unit partitions, doors and corridors

Partitions built to your unit mix, from lockers to drive-up units, with roller or hinged doors and wide corridors.

Red fire pipework and electrical conduit along a ceiling

Fire, security and access control

Detection, compartment walls, sprinklers where the strategy needs them, CCTV containment and keypad access.

Loading dock bays with dock shelters on a pale warehouse wall

Loading, lifts and reception

Loading bays, trolley routes, goods lifts and a bright reception that sells units at the counter.

How it works

How does a self storage project run with us?

01

Free feasibility

Send the site plans or particulars. We review the planning history, structure, clear height, fire and access, then return a layout and a cost plan.

02

Layout and approvals

Unit mix and mezzanine levels drawn to your brief. We run the fire strategy, building regulations and any planning application.

03

Fixed sum, fixed date

One contract sum and an opening date written into the contract. Any change you request is costed in writing first.

04

Build in phases

Our own trades on site and a director checking progress every week. If you want early income, a finished floor can open first.

05

Handover and records

Tested, commissioned and signed off, then handed over complete, with the fire, electrical and access records your insurer reads.

Cover of the Craftex Guide to Warehouse Construction

The Craftex Guide to Warehouse Construction

For operators and investors weighing up a building for storage. It shows how a warehouse project moves from site and budget to a signed-off building, with the checklist we use to keep a scheme on track. Free, and a ten-minute read.

Our promises

Six promises, written into your contract

  1. One team, site to keys

    Feasibility, design, approvals and construction sit with one firm and one director, so your scheme never falls between two contracts.

    Portsoken House, a full office fit-out designed in-house and built by us.

  2. The sum you sign holds

    The contract sum is what you pay. Anything you change is priced and agreed with you before work starts.

    100% of our projects finished on budget.

  3. Your store keeps trading

    Customers keep reaching their units while we extend or refit: phased zones, quiet hours and safe walking routes.

    Banbury, built inside a live warehouse while operations carried on.

  4. Open on your launch date

    Most of the labour is ours, so no week is lost waiting on someone else's trades.

    Hackney warehouse: power, heating, lighting and drainage for the whole unit in 4 weeks.

  5. £10M cover, every accreditation

    £10M public liability and £10M employers' liability, with professional indemnity on request.

    ISO 9001, 14001 and 45001, CHAS, SafeContractor and Constructionline.

  6. Zero snags, every certificate

    A finished store and a full file on day one: alarm, emergency lighting and electrical certificates, plus building control sign-off.

    Beaumont House, West Kensington: 750 sq m refurbished in 3 weeks, where other quotes said 12.

Example quotation for a warehouse-to-self-storage conversion, 3,000 m² with mezzanine

Already have a quote? Send it to us. We'll beat it.

Holding a price for a conversion or a new store? Send it with the plans. A director checks it line by line, shows you what it leaves out, and you hear back the same working day.

Compare your quotes

Where do self storage builds lose lettable space?

Every storage scheme carries these risks, and most of them cost lettable floor long before they cost money. Compare any quote with this list and ask who holds each one.

AreaThe usual riskWith Craftex
The layoutUnits drawn around the existing columns and doors, leaving dead corridors and odd unit sizes.Net lettable area planned first: unit mix, corridor widths and levels tested before any steel is ordered.
Storage levelsOne mezzanine where the clear height takes two, or a deck the slab was never checked to carry.Clear height and slab loading surveyed at feasibility, so every level the building can take is drawn and approved.
Fire strategyCompartment walls and escape routes added late, cutting lettable units out of the plan.The fire strategy agreed with building control at layout stage, with compartments set on unit lines.
ResponsibilityMezzanine supplier, partition installer, electrician and fire engineer on separate orders, each blaming the next.One main contract covers the building, mezzanines, units and services, so any problem is ours to solve.
The final billA conversion priced before anyone tested the slab, the roof or the clear height, then extras once it is opened up.Floor loads, roof and structure surveyed first, so the contract sum reflects the building you actually bought.
The opening dateThe whole building waits for the last floor before a single unit lets.Built in phases: ground floor, reception and access open first while the upper levels are finished behind a screen.

What sets the budget of a storage building?

Six decisions move the budget of a storage building more than anything else. We settle each one in writing before you sign, so the contract sum is what you pay.

DecisionWhat moves the budgetWhat we fix before you sign
Conversion or new buildCondition of the shell, roof and slab, or a cleared site with groundworks and frameSurvey of the building or the ground, and the route that pays on your site
Mezzanine levelsNumber of decks, slab loading, stairs, guarding and goods liftsLevels the clear height and slab can take, drawn and approved
Unit mix and doorsUnit sizes, corridor widths, roller or hinged doors, locksA unit schedule and door specification in the contract
Fire and sprinklersCompartment size, detection, sprinkler system and water storageThe fire strategy agreed with building control and your insurer
Security and accessGate and door access, keypads, CCTV containment, alarmOne access and security specification, commissioned before handover
Lifts and receptionGoods lifts, reception fit-out, signage and customer parkingA reception and lift schedule matched to your operating model

Land, planning fees, Section 106 and CIL, and abnormal ground are priced per project once the site is surveyed. We usually advise a contingency of 5–10%, depending on complexity.

Free cost calculator

What will your self storage facility cost?

Enter the floor area and pick a scope for an instant range at our 2026 rates.

Add
Your estimateEnter your spaceex VAT and fees Get your free cost plan

Indicative, ex VAT, fees and land. Excludes sprinkler tanks, abnormal ground and planning costs. Your fixed figure follows the free site feasibility.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Self storage construction: your questions

Do you convert existing warehouses into self storage?

Yes. Many stores start as an empty shed, an industrial unit or a retail box. We survey the slab, roof, clear height and fire separation, then strip out, repair and fit the building out over as many levels as it can take.

Do I need planning permission for self storage?

Often not, if the building already has a lawful storage use. Self storage falls in Use Class B8, so moving from one B8 use to another is usually not a change of use. Check old permissions first, as a condition can tie a building to one use. A shop, gym or office moving to storage normally needs permission. Our guide to how the Class E use class works covers the retail side.

Can we open in phases?

Yes. We finish and sign off the ground floor, reception and access first, so you can trade while the upper levels are completed behind a screen, with a protected route to every occupied unit. At Banbury we built inside a working warehouse without stopping its operations.

Who supplies the units and doors?

We do, inside the same contract. Partitions, roller and hinged doors, locks and corridor systems are specified with you, ordered straight from the programme and installed under our management, so one party answers for the finished store.

Do you work outside London?

Yes. We are based in London and build across the UK, with projects from Bethnal Green to Banbury. For operators with several sites we repeat one specification, one programme template and one director on every store.

Do you build new self storage buildings?

Yes: steel-framed stores on cleared or brownfield sites, from groundworks and frame to cladding, doors, mezzanines and reception, under one design and build contract. New build pays where no suitable building exists, or where a roadside presence matters.

How much net lettable area can my building give?

It depends on the footprint, clear height, column grid and fire strategy. A tall shed can often take one or two mezzanine levels, which adds lettable floor without a bigger footprint. The free site feasibility gives you a layout and an area for your building before you commit.

What drives the budget of a storage conversion?

The route (conversion or new build), the number of storage levels, the unit mix and doors, fire and sprinkler needs, security, and the lifts and reception. Our guide on what self storage costs to build walks through each one, and the calculator above gives a first range.

How long does a self storage build take?

We write the opening date into the contract instead of quoting an average, because size, planning and steel lead times vary so much. For scale, Drake's railway arch took 8 weeks on site from bare arch to working warehouse. A new build adds planning, groundworks and frame.

How fast do you reply?

The same working day. Send the site plans, the agent's particulars or just an address, and a director comes back to you with first thoughts and the next step.

What our clients say

See all reviews on Google
  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning a self storage building?

Send the site plans, the particulars or just an address. A director reviews the building, and we will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us