Fire Stopping & Cladding Remediation Contractors

Occupied towers and mansion blocks made safe, residents at home.

Our own trades

60% of the labour on site
is our own team

Work inside occupied buildings

  • 10 weeksto rebuild a 290 sq m penthouse in the Pan Peninsula tower, residents at home
  • 12 weeksto refurbish 400 sq m at Kensington Olympia while the building stayed occupied
  • 0snags at handover, every record in the building's file
  • £10Mpublic and employers' liability cover on every job

One contractor from the fire report to sign-off

Craftex delivers fire stopping and cladding remediation for London towers, mansion blocks and commercial buildings: as fire stopping contractors we survey, repair and evidence every compartment line, and we take the external wall from FRAEW to sign-off. One contract covers the cladding, the balconies, the fire doors and the making-good, while residents stay at home.

Boards, residents and lenders all ask one question: when will the building be safe? Send us the fire risk assessment, the FRAEW or the intrusive survey, and we turn every finding into a line of work with a price and a date written into the contract.

We work for freeholders, resident management companies and estate owners of prime towers, red-brick mansion blocks and multi-let commercial buildings. Specialist installers we appoint and supervise work alongside our own trades, under one programme and one accountable director.

Apartment tower with curved balconies beside The Shard, London

Why does fire stopping fail inspection?

Floor stripped back with a scaffold tower and the ceiling services exposed

Most failures are not in the original build. Later trades cut new holes for cables and pipes and never reseal them, the product chosen does not suit the wall or the service, nobody photographs each penetration, and the gaps above ceilings stay hidden until someone opens them. See how we work as a construction partner for landlords and managing agents.

Read more

Fire stopping seals the gaps where services pass through fire-resisting walls and floors. Passive fire protection is the wider family: fire stopping, compartment walls and floors, cavity barriers, fire doors and protection to the structure. Compartmentation is the way a building is divided into those fire-resisting boxes, so a fire stays where it starts long enough for people to leave.

Approved Document B sets the standard for new work, and the Regulatory Reform (Fire Safety) Order 2005 makes the responsible person act on the findings of the fire risk assessment. Whether you search for a fire stopping company, fire stopping installation or passive fire protection in London, the test is the same: a tested product, fitted to its tested detail, with a photo record for every seal.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does fire safety remediation cover?

Six workstreams, one contract and one programme, from the first opening-up to the last certificate in the building's file. Every item is priced from your reports before anything starts on site.

Pipes and cable trays running through a concrete ceiling soffit

Fire stopping and passive fire protection

Service penetrations, risers and ceiling voids sealed to tested details, each seal photographed for the records.

Perforated metal cladding panels on a building facade

Cladding removal and replacement

ACM, HPL and timber cladding and combustible insulation replaced to the FRAEW, with new cavity barriers at every floor.

Brick apartment block with metal balconies

Balcony remediation

Timber decking, screens and soffits swapped for non-combustible materials, one stack of balconies at a time.

Communal stairwell landing with two flat entrance doors

Fire doors and escape routes

Flat entrance and communal fire doors replaced or upgraded, with closers, seals and signage along the route out.

Cable tray, sprinkler pipework and services under a concrete soffit

Compartmentation surveys and repairs

Walls, floors, ducts and dampers opened up, checked against the fire strategy and made good.

Red-brick Victorian mansion block of flats in London

Works in occupied blocks

Resident notices, flat visits booked ahead, and scaffold, hoists and site areas kept secure and tidy.

How it works

How does a remediation project run, report to sign-off?

01

Reports read, building surveyed

We read the FRA, FRAEW or EWS1 and the intrusive survey against the building itself.

02

Scope, funding route, programme

Every defect priced and dated, with the evidence a funding application needs.

03

Residents told, site set up

Notices, a named contact and a liaison plan before the first scaffold tube.

04

Remediation with photo evidence

Each seal, board and door recorded as it is finished.

05

Sign-off pack

Certificates, photos and as-built records for the board, the lender and the regulator.

Cover of the free Craftex guide to fit-out and M&E works

Free guide: fire-stopped services in fit-out and MEP works

How services are planned, routed and sealed through fire-resisting walls and floors, and the records a building needs at handover. Free to download, and worth reading before the first opening-up.

Our promises

Six promises, written into your contract

Fire stopping, cladding, balconies and doors under one firm; a sum that stands; residents at home; a completion date in the contract; the insurance your board expects; and a complete record at handover.

  1. One contract, one accountable director

    Fire stopping, cladding, balconies, doors and approvals sit with one firm, so no defect falls between two contractors.

    Kensington Olympia, where we were main contractor from first sketch to handover.

  2. The agreed sum stands

    Any change is priced and agreed in writing before work starts, so the figure you report to your board holds.

    Every Craftex project to date finished on budget.

  3. Residents carry on living at home

    Escape routes kept open, quiet hours respected and every visit to a flat arranged in advance.

    Portsoken House, Aldgate, where the shared reception was rebuilt out of hours while every tenant kept working.

  4. Finished by your deadline

    The completion date is set from your target and written into the contract. Our own trades keep the programme moving.

    Portsoken House, Aldgate: two floors, 1,550 sq m, fitted out in seven months while the other floors stayed occupied.

  5. Cover your board and insurer expect

    £10M public liability and £10M employers' liability, with professional indemnity on request.

    ISO 9001, 14001 and 45001, and CHAS.

  6. Zero snags, a complete golden thread

    Fire-stopping photos, door schedules, test certificates and as-built drawings arrive in one file at handover.

    Beaumont House, West Kensington: 750 sq m handed over in three weeks with zero snags.

Example contractor quotation for cladding and fire stopping remediation

Already have a quote? Send it to us. We'll beat it.

Holding a remediation tender or a fire stopping price from another contractor? Send it to us with the survey. A director reviews it and comes back the same working day with how we beat it for the same scope, and anything it leaves out that would hold up sign-off.

Compare your quotes

Where remediation projects go wrong, and what we do instead

Compare any remediation tender against these six points before your board signs. Most delays, cost overruns and rejected funding claims start with one of them, long before the first board comes off the wall.

AreaThe usual riskWith Craftex
The scopeDrawn before anyone opened the wallsPriced from the intrusive survey, with opening-up allowances agreed
ResidentsTold nothing for months, visits missedA liaison plan, a named contact and every flat visit booked
EvidenceFire stopping finished with no photo recordEach seal photographed and logged as it is completed
FundingA claim rejected for missing evidenceCost evidence prepared in the form the funder asks for
The scaffoldStanding a year longer than plannedApprovals, long-lead materials and crews scheduled from week one
HandoverGaps in the records delay the new FRAEWDefects closed and the file complete for the fire engineer

What sets the cost of cladding remediation?

Six things decide what a remediation project costs. We settle each one with you before you sign, so the board approves a figure that holds through the works and the funder sees the same numbers.

What moves the budgetWhat we fix before you sign
The wall system and the height of the buildingThe FRAEW findings read against drawings and a visual survey
What the intrusive survey findsOpening-up allowances agreed in writing at the start
Scaffold and accessAn access design fixed with the programme
Residents in occupationA liaison plan and working hours agreed with the managing agent
Balconies and windows in the same wallOne scope for the whole elevation, priced together
Evidence the funder and the lender needA records format agreed before the first board comes off

Free cost calculator

What will your cladding remediation cost?

Enter the area of cladding to replace and choose the size of the facade. The range is a first indication only; your reports and a site visit set the figure, and we reply the same working day with what happens next.

Your estimateEnter your spaceex VAT and fees Send us the fire reports

Indicative, ex VAT, contingency and variations. Fire stopping, balconies and fire doors are priced once we have seen your survey.

Passive fire protection inside the building

Pipework and cable containment running through a ceiling void

Compartmentation in risers, ceilings and roof voids. We open up, survey and repair compartment walls and floors where services run, and record every breach and every repair on marked-up drawings.

Ductwork and services in a commercial ceiling

Fire stopping around new services. In occupied flats and offices we seal around new pipes, cables and ducts out of hours, as we did when rebuilding the Portsoken House reception over nights and weekends.

Read more

Passive fire protection covers the parts of a building that resist fire without being switched on: compartment walls and floors, fire stopping, cavity barriers, fire doors, fire-resisting ductwork and dampers, and intumescent coatings to steel. Our guide to fire compartmentation surveys explains how breaches are found and logged.

Towers and mansion blocks in London

Red-brick Edwardian mansion blocks with stone dressings and a domed corner turret

Prime residential towers in Canary Wharf and Nine Elms, red-brick mansion blocks in Kensington and Marylebone, and multi-let offices in the City. Higher-risk buildings of 18 m or seven storeys with at least two homes also need Building Safety Regulator approval before remediation starts.

Read more

Most of our remediation enquiries come from London, where unsafe cladding and ageing compartmentation are concentrated in towers and mansion blocks. We also take on remediation works across the rest of England, and plan to the local rules in Scotland and Wales. Cladding remediation in London follows the same funding routes and regulator stages as the rest of England.

Our team

  • in

Fire stopping and cladding remediation: your questions

What is the difference between fire stopping and passive fire protection?

Fire stopping is one job: closing the holes that pipes, cables and ducts make in a fire-resisting wall or floor. Passive fire protection is the whole system it belongs to, from compartment walls and fire doors to coatings on steel.

Can residents stay at home during cladding remediation?

Yes, in almost every case. Escape routes stay open, interim measures stay in place, and every visit inside a flat is booked with the household beforehand.

Can the Cladding Safety Scheme or the Building Safety Fund pay for the works?

Often, for unsafe cladding on blocks of 11 m and over in England. We prepare the cost evidence and programme the funder asks for; the application itself is made by the building owner. Our guide to the Cladding Safety Scheme sets out eligibility and the grant stages.

Do you replace flat entrance fire doors as well?

Yes. Flat entrance and communal doors are replaced or upgraded with frames, closers and seals, and logged in the door schedule, through our fire door replacement team.

Do you work outside London?

Yes. Most of our work is in London, and we take on remediation across England; projects in Scotland or Wales follow their own regimes.

Who is responsible for remediation: the freeholder, the RMC or the developer?

The building owner or the landlord under the lease arranges the works. Where a developer signed the government's remediation contract it pays for life-critical defects in the buildings it developed, and qualifying leaseholders are protected from cladding costs. Our guide to the Building Safety Act and gateway 2 covers the regulator side, and our Building Safety Act guide for building owners covers the duties.

Do you work from our FRAEW or EWS1, or survey again?

We start from your reports. Where the scope depends on what is behind the wall, we agree an intrusive survey or opening-up allowances before we fix the price.

How do you evidence fire stopping for the board and the lender?

Every seal is photographed, numbered and logged against a marked-up drawing, and the log goes into the handover file with the product data.

How long does remediation of a mid-rise block take?

It depends on the facade, the approvals and what is found when the walls are opened. We write the completion date into the contract rather than quote an average.

How fast do you reply?

The same working day. Send whatever report you hold and a director comes back with what happens next.

What our clients say

See all reviews on Google
  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Send us the fire reports

One FRA, FRAEW, EWS1 form or survey is enough to start. We will come back to you the same working day.