Commercial Roofing & Facade Contractors

Roofs, curtain walls and period facades, made watertight while you trade.

Our track record

100% of projects delivered ahead
of programme and on budget

What our clients get

  • 8 weeksto refit a 2,500 sq m working Banbury warehouse, operations never stopped
  • 7 monthsto turn 1,550 sq m of empty Aldgate space into offices, tenants in occupation throughout
  • 8 weeksto design and build a 500 sq m railway-arch warehouse in Bethnal Green
  • £10Mpublic and employers' liability cover each, what your landlord and insurer expect

One survey, one contract, a dry building

Craftex delivers commercial roofing, roof repairs and facade works for landlords, estates and owners of warehouses, offices and period buildings across London and the UK. As commercial roofing contractors and facade contractors under one contract, we survey first, tell you plainly whether to repair, over-clad or replace, and keep the building working below us.

A failing roof rarely stays a roof problem. Water reaches stock and tenants, the dilapidations schedule grows and the EPC stays where it is. One team handles the roof, the curtain walling, the stone and brick and every junction between them, and one director answers for all of it.

We work for owners of large distribution and estate roofs, Grade A offices and landmark period facades, from the City and Covent Garden to Banbury and Manchester. See all locations.

Site team in hard hats and hi-vis walking across a commercial roof deck behind edge protection

Repair, over-clad or replace?

Two ventilation units on the profiled metal roof of a commercial building

Core samples and a drone survey answer it before anyone prices your roof. Wet insulation or a failing deck means replace. A dry deck under a tired covering can take a new insulated layer on top. An asbestos-cement sheet roof is often over-clad in place rather than stripped. And a roof with less life left than a solar array is renewed first, so the panels never have to come off. See how we work as a construction partner for landlords and managing agents.

Read more

Single ply membranes (TPO, PVC or EPDM) suit large flat roofs and go down fast over a live building. Liquid-applied roofing suits complex roofs crowded with plant, upstands and outlets. Built-up felt still fits where the roof takes heavy foot traffic or the existing build-up is felt.

Commercial flat roofing, metal over-sheeting and full commercial roof replacement are one service with us. Owners comparing commercial roofing companies, roofing and cladding contractors or a commercial roof replacement get the same thing first: a survey report that says repair, over-clad or replace, with the reasons. Our commercial roof replacement guide sets out what drives the cost.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What do our commercial roofing and facade works cover?

Roof, walls and glazing handled by one team, so the envelope is signed off once. Part of our dilapidations, Cat A and MEES works.

Flat roof with a light membrane covering on a brick commercial building, seen from above

Strip and re-roof

Old coverings stripped to the deck and renewed in single ply, liquid, built-up felt, standing seam or composite panels, insulated to current standards.

Profiled metal roof sheets with ventilation units and an opened section

Over-cladding and over-sheeting

A new insulated roof over a sound deck or an asbestos-cement sheet roof, so the building never opens to the weather.

Flat office roof with plant and a small team at work, seen from above

Commercial roof repairs and leak tracing

Leaks traced to their source and fixed: failed laps, flashings, outlets and gutters, before water reaches stock or tenants.

Sawtooth industrial roof with glazed rooflight panels

Rooflights, edge protection and roof safety

Fragile rooflights replaced, with edge protection, safety lines and walkways so every future inspection is safe.

Rows of solar panels on a large flat commercial roof

Roofs ready for solar

Structure checked and the roof renewed to outlast the panels, ready for our commercial solar team.

Curved glazed curtain-wall facade of a modern office building

Facades, curtain walling and windows

Rainscreen panels, curtain walling and windows repaired, re-glazed or replaced, sealed and insulated, with the building occupied.

How it works

How does a roof or facade project run, survey to handover?

01

Drone and core survey

We fly the roof, take core samples and walk the elevations, recording every defect with photographs.

02

Repair, over-clad or replace report

A plain report with our recommendation and the reasons, then a fixed figure and a programme to your date.

03

Access, scaffold and weather plan

Asbestos survey, building control, scaffold, edge protection and crane lifts arranged before anyone works at height.

04

Phased works, building live

One section opened at a time and made watertight every evening, loading bays and tenants carrying on below.

05

Handover and guarantees

Every defect closed, the system guarantee, the O&M manual and a photo record of the finished roof in one pack.

Cover of the free Craftex Guide to Fit-Out and MEP Projects

The Craftex Guide to Fit-Out and MEP Projects

Planning roof or facade works in a building that stays open? Our free guide to fit-out and MEP projects covers access, sequencing, sign-offs and the handover file, the same planning a re-roof over a live warehouse or office needs.

Our promises

Six promises, written into your contract

  1. One contract for roof and walls

    Roofing, cladding, glazing, drainage and approvals sit under one contract, with one director answerable for the whole envelope.

    Portsoken House, Aldgate: 1,550 sq m refurbished under one contract with tenants in occupation throughout.

  2. The agreed sum stands

    Any change, including rotten deck found once the roof is opened, is priced and approved in writing before work goes ahead.

    Every Craftex project to date has finished on budget.

  3. Your business keeps running

    Work is phased around loading bays, shifts and tenants, and nothing is left open to the weather overnight.

    Banbury, Oxfordshire: a working warehouse kept operating while we built inside it.

  4. Finished by your date

    The completion date is set from your lease event, letting launch or solar start, and written into the contract.

    Drake's, Bethnal Green: 500 sq m of railway-arch warehouse designed and built in 8 weeks.

  5. Cover your landlord and insurer expect

    £10M public liability and £10M employers' liability, professional indemnity on request, ISO 9001, 14001 and 45001, and CHAS.

    The accreditations shown at the foot of this page.

  6. Zero snags, every guarantee on file

    The system guarantee, fall-arrest test records, as-built drawings and the O&M manual arrive together at completion.

    Beaumont House, West Kensington: 750 sq m handed over in three weeks with zero snags.

Example contractor quotation for a strip and re-roof of a warehouse

Already have a quote? Send it to us. We'll beat it.

Holding a roofing, cladding or curtain walling quote? Send it with the survey. A director marks what it leaves out and replies the same working day with our figure for the same scope and a programme that keeps you trading.

Compare your quotes

Where roofing projects go wrong, and what we do instead

AreaThe usual riskWith Craftex
The wrong fixThe whole roof is replaced and the leak stays, because it was a blocked gutter all along.Leaks traced and tested before anyone recommends a new roof.
Stock and tenantsA section is left open, the weather turns and stock below is soaked mid-job.Work sized to the forecast, and each section closed and weathered before the crew leaves.
Solar on a tired roofPanels bolted onto a roof with five years left, then lifted off again to re-roof.The roof checked and renewed first, so it outlasts the array.
AccessScaffold and hoists blocking the loading bay for weeks.Access designed around your yard, deliveries and shifts before work starts.
The final billThe roof is stripped, rotten deck appears and the price starts to climb.Deck and insulation cored before pricing, and any extra agreed in writing before it is built.
WarrantyAn over-clad with no system guarantee, so the next leak turns into a dispute.A written system guarantee and the full record in your hands at handover.

What sets the cost of a commercial roof?

Six things move the figure for a commercial roof more than anything else. We survey each one before we price, settle it in writing before you sign, and show you which of them your own roof turns on.

WhatWhat moves the budgetWhat we fix before you sign
Roof system and conditionSingle ply, liquid, felt or metal, and whether the deck and insulation are dryCore samples and a written repair, over-clad or replace report
Asbestos-cement sheetsOver-clad in place, or removed by a specialist before re-roofingAn asbestos survey and the route it supports
Area and accessRoof size, height, scaffold, hoists and crane liftsAn access plan around your yard and deliveries
Rooflights and edge protectionFragile rooflights to replace, guardrails, safety lines and walkwaysA roof safety schedule priced item by item
Insulation to Part L and the EPCUpgrading insulation when most of the roof is renewedThe target U-value and its effect on the EPC
Working over a live buildingPhasing around stock, shifts and tenants, and nightly weatheringA phasing plan sized to your operation

Free cost calculator

What will your roof cost?

Enter the roof area and pick the work for an instant range at our 2026 rates. Your fixed figure follows the free roof survey.

Add
Your estimateEnter your spaceex VAT and fees Get your roof costed free

Indicative, ex VAT. Scaffold, asbestos, rooflights and deck repairs are priced from the survey.

Curtain walling and facades on occupied buildings

Glazed office building with every floor lit behind its curtain wall at dusk

Curtain walling, floor by floor. Failed seals, misted units and leaking joints repaired, re-glazed or replaced one floor at a time, with offices working behind the glass. As curtain walling contractors we survey the frame first: a sound frame is often resealed and re-glazed rather than replaced.

Curved stone facade of a grand period office building at Finsbury Circus in the City of London

Period stone and brick facades. Stone cleaned and repaired, brick repointed and restored behind a working street front, the way landmark facades in the City and the West End are kept. At Slingsby Place in Covent Garden, led by Martin Hickey in his earlier role before he joined us, the facades were held and protected while everything behind them was rebuilt.

Read more

Facade restoration in London means working to conservation officers, listed building consent where it applies, and a street that never closes. Brick restoration and stone restoration start with a survey of the joints, the stone and the fixings, then trial panels before the full elevation.

Cladding on residential blocks over 11 metres is a fire safety matter, covered by our fire stopping and cladding remediation service. Read more on curtain walling.

Warehouse and industrial roofing across the UK

Low aerial view of a long industrial shed with a pale metal roof beside fields

Distribution, logistics and estate roofs re-roofed or over-clad over live operations, from the M25 ring to the Midlands and the North. At Banbury we built inside a working 2,500 sq m warehouse for eight weeks while dispatch carried on; the same plan of exclusion zones and nightly weathering runs every roof we take on.

Read more

Industrial roofing and cladding on portal-frame sheds usually means over-sheeting or replacing profiled metal or asbestos-cement sheets, renewing gutters and replacing fragile rooflights. Commercial flat roofing on offices and retail suits single ply or liquid systems. Where the roof suits it, a green roof adds insulation, slows rainwater run-off and gives planners something to like.

We take on industrial roofing across England, Scotland and Wales, planned to local Building Regulations. Landlords re-letting a unit should read industrial unit refurbishment to let.

Our team

  • in

Commercial roofing and facades: your questions

Should we repair, over-clad or replace our commercial roof?

Repair when leaks are local and the covering is otherwise sound. Over-clad when the deck and insulation are dry but the waterproofing is at the end of its life. Replace when the insulation is wet, the deck is failing or leaks keep coming back. Core samples settle it, and our roof survey is free.

What do you do with an asbestos-cement roof?

We start with an asbestos survey. Many asbestos-cement sheet roofs can be over-clad in place, leaving the sheets undisturbed. Where the survey points to removal, a specialist asbestos contractor removes them under the Control of Asbestos Regulations 2012 before we re-roof.

Do you repair and re-glaze curtain walling?

Yes. Sealed glazing units and gaskets usually fail long before the aluminium frame, so a sound curtain wall can often be resealed and re-glazed rather than replaced. We work floor by floor with the building occupied.

Will the new roof take solar panels?

We check the structure and design the new roof to outlast an array, with fixings and cable routes planned in. The panels follow through our commercial solar installation service, so the roof and the array are planned as one job.

Do you work outside London?

Yes. We are based in London and take on commercial roofing across the UK, with projects in Banbury, Manchester and across the capital. Building Regulations differ in Scotland and Wales, and we plan the works to the local rules.

Can you re-roof a warehouse while we keep trading?

Yes, and most of our clients need exactly that. Sections over loading bays, production lines or tenants are timed around your shifts, exclusion zones sit below overhead work and nothing is left open overnight. At Banbury we built inside a busy warehouse while it kept working.

Which flat roof system lasts longest on a commercial building?

It depends on the roof, the traffic on it and the plant it carries. Single ply suits large open roofs, liquid systems suit roofs crowded with upstands, and built-up felt suits heavy foot traffic. Our single ply roofing guide compares them. The system guarantee, the installer's workmanship and regular inspections matter as much as the material. Our MEES guide covers the insulation side.

Can you restore a period brick or stone facade?

Yes. We survey the stone, the brick and the joints, agree trial panels and the method with the conservation officer where needed, then clean, repair and repoint behind protection so the street and the building keep working.

Does a new roof help our EPC and MEES?

Usually, yes. Renewing most of a roof means insulating it to current Building Regulations, which often lifts the EPC. A let commercial building needs EPC E or better today. Our dilapidations and MEES works and an accredited energy assessor show what the new roof gains.

How fast do you reply?

A director replies the same working day. Send roof photos, a survey or a dilapidations schedule and you get the next step and a date for the free roof survey.

What our clients say

See all reviews on Google
  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Roof leaking, or a lease deadline coming?

Send photos, a survey or just the address. We will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us