For buyers, developers and landowners in England
How to Check Planning Permission on a Property
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 7 min read
The short answer
To check planning permission, search the council's planning register by address and open the decision notice. Then check the conditions, the time limit, the lawful use and any enforcement or land charges.
- Every council must keep a planning register open to the public, and many put it online as a searchable portal.
- In England, a full permission usually lapses if work has not begun within three years.
- A certificate of lawfulness is the legal proof that an existing or proposed use or building is lawful.
- Section 106 obligations are local land charges and bind whoever later owns the land.
To check planning permission on a property, search the local council's planning register by address. Open the decision notice, not just the summary line. It shows what was approved, the conditions and the date the clock started.
A permission on the register is only the start. You also need to know if it is still alive, if the conditions were met and if the current use is lawful. Miss one and you may pay for a consent you cannot build. A planning consultant reads all of it together before you buy or build.
This guide covers England, with the law behind each step. Buying a site or building on one? Before you exchange, send us the address.
Get a free site appraisal. We check the planning history, the conditions, the expiry date and any enforcement risk, and what the site could carry.
Check planning permission on the council portal
Every council must keep a register of planning applications. Section 69 of the Town and Country Planning Act 1990 says it "must be kept available for inspection by the public at all reasonable hours". There is no single national search. Each council holds its own register.
The law allows a council to publish the register on its website, and many do, as a planning portal. You search it by address, postcode or reference number. In London, that means the borough's portal, not the Greater London Authority.
- Find the right council. Use the postcode to find which council covers the site. Sites on a boundary can sit in two.
- Search the address more than one way. Try the house number, the street alone and the postcode. Converted buildings often change numbers.
- Open the decision notice. It lists the approved plans and every condition. The summary line on the portal does not.
- Download the approved plans. Check that what stands on site matches them.
- Note the reference and the date. You need both to work out the time limit and to find later approvals.
The register comes in two parts, set by article 40 of the Development Management Procedure Order 2015. Entries must be made within 14 days of an application or decision.
| Part | What it holds |
|---|---|
| Part 1 | Applications not yet decided, with plans and any proposed section 106 obligation |
| Part 2 | Every application, its plans, the decision and the conditions |
| Part 2 | Any appeal decision by the Secretary of State |
| Part 2 | Dates when details under conditions were later approved |
| Part 2 | Section 106 obligations and any changes to them |
| Part 2 | Certificates of lawfulness and housing prior approvals |
If the portal shows nothing for an older building, the records may simply not be online. Ask the planning department to search its paper files.
Find old permissions and the planning history
The planning history is every application ever made on the site. It includes refusals, withdrawn applications and appeals, not just the consents. Read all of it, oldest first.
Refusals matter as much as approvals. The reasons for refusal show what the officers objected to: height, daylight, parking or the loss of a use. An appeal decision shows what the Inspector made of those reasons. A new scheme that ignores them is likely to meet the same answer.
Look for these in the history:
- More than one permission. Two consents can overlap on one site. Do not assume the latest one wins, or that both can be built.
- Prior approvals. Office-to-home and other permitted development routes appear as prior approval decisions, with their own limits.
- Certificates of lawfulness. These confirm that a use or building was lawful on a given date.
- Withdrawn applications. A scheme is often withdrawn just before a refusal. The officer's comments usually stay on file.
Then check the separate enforcement register. Section 188 requires councils to keep a register of enforcement notices, stop notices and breach of condition notices. Enforcement warning notices go on it too. Like the planning register, it is open to the public at all reasonable hours.
Finally, search the neighbouring addresses. A consent next door for an extra storey can affect your daylight, outlook and value.
Read the conditions and the expiry date
Section 70 lets a council grant permission with conditions. The conditions are where most problems sit. They come in three broad kinds.
- Before work starts. Details such as materials, drainage or a construction plan need the council's approval first.
- Before anyone moves in. Cycle stores, refuse areas or landscaping must be in place before occupation.
- For as long as the use lasts. Opening hours, obscure glazing or a ban on extra windows.
Part 2 of the register records the dates when details under conditions were approved. If a condition needed approval before work started, look for that approval. A start made in breach of such a condition may not count as a lawful start.
The time limit is a condition too. Section 91 sets three years in England, unless the council chose another period. Check the wording on the notice, not the default.
| Type of permission | Time limit | Source |
|---|---|---|
| Full permission | Begin within 3 years of the grant | s91 TCPA 1990 |
| Outline: reserved matters | Apply within 3 years of the outline grant | s92(2)(a) |
| Outline: start on site | Begin within 2 years of the last reserved matters approval | s92(2)(b) |
Section 56 says work has begun when a "material operation" starts. That includes digging a foundation trench, demolishing a building or laying a pipe to the foundations. Ask the seller for evidence: dated photos, building control records or a council letter confirming the start.
If the time ran out before any start, the permission has lapsed. Section 73 cannot then be used to change it. You need a fresh application, and our guide to how long planning permission takes shows what that adds to your programme.
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Check lawful use and certificates of lawfulness
A permission tells you what was approved. The lawful use tells you what the property can be used for today. The two do not always match. A house split into flats without consent is still, in law, a house.
The legal proof is a certificate of lawfulness. There are two kinds:
- Existing use, section 191. It confirms that an existing use, building work or breach of a condition is lawful.
- Proposed use, section 192. It confirms a use or works "would be lawful if instituted or begun at the time of the application".
Section 191(2) explains when an existing use becomes lawful. It is lawful if it did not need permission, or if the time for enforcement has passed. That time limit changed in 2024.
Whether a past conversion is now immune depends on what was done and when. Building works and a change of use to a single home have one clock, and other changes of use have another. The 2024 change left old cases on the old four-year rule. Do not assume time has run: get a certificate of lawfulness.
Our guide to the Town and Country Planning Act 1990 explains section 171B in full.
Without a certificate, a seller's word is not proof. If the use matters to your price, ask for a certificate as a condition of the sale. For which application fits which case, see outline, full planning or a certificate of lawfulness.
Land charges, title and enforcement checks
The planning register is one source. Three other checks complete the picture, and two of them are cheap.
| Check | Where | What it shows | Cost |
|---|---|---|---|
| Local land charges | HM Land Registry service or the council | Planning conditions, tree preservation orders, conservation areas, listed buildings | Basic search free; official certificate £15 |
| Title register | HM Land Registry | Owner, last sale price, restrictive covenants and easements | £7 online |
| Title plan | HM Land Registry | Location and general boundaries | £7 online |
| Enforcement register | The council | Enforcement, stop and breach of condition notices | Open to public inspection |
Not every council's land charges are on the HM Land Registry service yet. Where they are not, search with the council directly.
A section 106 agreement is a local land charge under section 106(11). It binds anyone who later owns the land. Read its money and timing clauses before you price the site. An affordable housing payment due on first occupation lands on the buyer, not the seller.
The title matters as much as the consent. A restrictive covenant can stop a scheme the council approved. A missing right of way can stop the access the plans rely on.
What a buyer should verify before exchange
A permission passes with the land. Section 75 says it benefits the land and everyone with an interest in it. So do its conditions, its section 106 and any breach on the site. Check these before you exchange, not after.
The planning check is half the job. The other half is whether the consented scheme makes money at today's build costs. Many consents were drawn without a contractor's price.
Our development land and site sourcing service works for the buyer, not the seller. We check the numbers on consented sites and flag the risks before you commit. At Allitsen Road in St John's Wood, a derelict club bought at auction became four costed schemes with a planning strategy in four weeks.
Our Development Director, Rob Barton, took 10,000+ homes through planning in his previous roles.
Found a site with a consent you need to trust? Send us the address before you exchange, not after. Get a free site appraisal. We will read the history, test the conditions and expiry, flag any enforcement risk and tell you what the site can carry.
Before you exchange on a site with planning
- The decision notice and approved plans match the site and the scheme you are buying.
- The permission is still within its time limit, or there is dated evidence of a lawful start.
- Every condition needed before work starts has an approval on the register.
- The section 106 costs and triggers are known and priced into your offer.
- The enforcement register shows no notice on the site.
- The current use is lawful, with a certificate where it matters to the price.
- The title has no covenant or missing access that blocks the scheme.